Public tenders for energy in Fredericia Denmark

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyDenmarkfredericia

Energy meters

Energinet.dk | Published May 12, 2016
cpvs

Energy meters

DONG Energy Thermal Power — consulting services.

Dong Energy Thermal Power A/S | Published August 22, 2015  -  Deadline September 7, 2015
cpvs
71310000

DONG Energy Thermal Power A/S wishes on behalf of consolidated companies to prequalify consulting engineering companies for the performance of technical advice and assistance to DONG Energy's thermal power stations in Denmark. The Services related to the thermal power stations as well as activities related thereto. The Services generally includes all services in DONG Energy's project model, divided into the following phases: idea, analysis, maturation, execution and evalueringsfaser, including planning, public authorities, risk assessments, project descriptions, strategy, planning and design in tenders or detailed design, procurement projects, tender evaluation and assistance in connection with the conclusion of supplier and Contractor etc. The list is not exhaustive. Framework Agreement concerns both deposits of resources who are working under DONG Energy's management and responsibility, as well as the performance of independent consultancy work with professional consulting liability. Also included are driftsrådgivning in all sub-contracts. The Framework is divided into the following sub-contracts / Lots: Lot 1: Engineering Consultancy, Client and Project Consultancy. Lot 2: Engineering Consultancy, Building and Construction. Lot 3: Engineering Consultancy, Mechanical and Process. Lot 4: Engineering Consultancy, Electrical Installations. Lot 5: Engineering Consultancy, C&I / Control and Instrumentation Systems. Lot 6: Engineering Consultancy, Environmental. Lot 7: Engineering Consultancy, QHSE and Site Manager.

SAP Consultancy Services to DONG Energy Poland.

DONG Energy Oil & Gas A/S | Published August 1, 2015
cpvs
72000000

SAP Consultancy Services to DONG Energy Poland.

Termination of array cables for DONG Energy Wind Power's offshore wind farm Borkum Riffgrund II

DONG Energy Wind Power A/S | Published December 16, 2016
cpvs
31321500, 51112100, 45314300, 44320000

Termination of array cables for DONG Energy Wind Power's offshore wind farm Borkum Riffgrund II.

Framework Agreement regarding temporary staff working at DONG Energy Wind Powers Danish locations.

DONG Energy Wind Power A/S | Published December 1, 2015  -  Deadline December 16, 2015
cpvs
71310000

The tendered contracts are framework agreements comprising the supply of temporary staff to support DONG Energy's offshore wind farm projects. Hence, the scope of services includes the supply of temporary staff employed by the supplier, who will be hired by Dong Energy as consultants on an ad hoc basis and will mainly be working in DONG Energy's offices in Denmark under the instructions of DONG Energy for a shorter or longer period of time. The scope of services includes the supply of staff with engineering experience, preferably from the offshore wind industry: The framework agreement is divided into the following 6 lots: 1. Wind Turbine engineering; 2. Substation engineering; 3. Electrical Systems engineering; 4. Foundations engineering; 5. Harbour and Offshore logistics engineering; 6. Project management and support (incl. contract management and supplier quality management). Alterations may occur as set out in the tender material. Approximately 50 full time consultants (in total; deriving from all lots) are expected to be contracted through the framework agreements pr. year. The volume is expected to be approximately the same on each of the six lots. However, as deviations may occur, this figure is in no way binding for DONG Energy.

Supply of SCADA Network and Telecommunication for DONG Energy Wind Power's offshore wind farm Borkum Riffgrund II

DONG Energy Wind Power A/S | Published November 30, 2016
cpvs
32500000, 32400000

Supply of SCADA Network and Telecommunication for DONG Energy Wind Power's offshore wind farm Borkum Riffgrund II.

Supply of platform cranes to DONG Energy Wind Power's Borkum Riffgrund 2 Offshore Wind Farm

DONG Energy Wind Power A/S | Published February 7, 2017
Winner
Palfinger Marine Denmark
cpvs
42414100

Supply of platform cranes for installation on each foundation platform/Transition piece for DONG Energy Wind Power's Borkum Riffgrund 2 Offshore Wind Farm.

Delivery of SCADA Substation Control System (SCS) to the Offshore Substation for DONG Energy Wind Power's offshore wind farm Borkum Riffgrund II

DONG Energy Wind Power A/S | Published September 22, 2016
cpvs
31200000

Delivery of SCADA Substation Control System (SCS) to the Offshore Substation for DONG Energy Wind Power's offshore wind farm Borkum Riffgrund II.

Supply of Medium Voltage Switchgear (GIS) to the Offshore Substation for DONG Energy Wind Power's offshore wind farm Borkum Riffgrund II

DONG Energy Wind Power A/S | Published September 22, 2016
cpvs
31200000

Supply of Medium Voltage Switchgear (GIS) to the Offshore Substation for DONG Energy Wind Power's offshore wind farm Borkum Riffgrund II.

Framework Agreement Regarding Engineering Consultancy and Assistance in DONG Energy Thermal Power A/S.

DONG Energy Thermal Power A/S | Published August 15, 2015  -  Deadline September 7, 2015
cpvs
71300000

DONG Energy Thermal Power A/S wishes on behalf of consolidated companies to pre-qualify consulting engineering companies for the performance of technical advice and assistance to DONG Energy's thermal power stations in Denmark. The Services related to the thermal power stations. The Services generally includes all services in DONG Energy's project model divided into the following phases: idea, analysis, maturation, execution and evaluation phase including planning, public authorities, risk assessments, project descriptions, strategy, planning and design in tenders or detailed design, procurement projects, tender evaluation and assistance in connection with the conclusion of Supplier and Contractor, etc. The list is not exhaustive. Framework agreement concerns both deposits of resources who are working under DONG Energy's management and responsibility as well as the performance of independent consultancy work with professional consulting liability. The Framework is divided into the following Subcontracts/Lots: 1. Lot 1: Engineering Consultancy, Client and Project Consultancy, 2. Lot 2: Engineering Consultancy, Building and Construction, 3. Lot 3: Engineering Consultancy, Mechanical and Process, 4. Lot 4: Engineering Consultancy, Electrical Installations, 5. Lot 5: Engineering Consultancy, C and I (Control and Instrumentation Systems), 6. Lot 6: Engineering Consultancy, Environmental, 7. Lot 7: Engineering Consultancy, QHSE and Site Manager.

DONG Energy Thermal Power — Engineering and consultancy.

DONG Energy Thermal Power A/S | Published December 11, 2015  -  Deadline January 11, 2016
cpvs
71300000

Engineering consulting services and assistance to the Contracting Entity. The Services generally includes all engineering consultancy services for all phases in DONG Energy's project model. The phases are: 1) Idea, 2) Analysis, 3) Maturation, 4) Execution, 5) Evaluation. Moreover, the services include planning, interaction with public authorities, risk assessments, project descriptions, strategy, preparation of tender material or detailed design, procurement projects, tender evaluation and assistance in connection with the conclusion of supplier and contractor, technical engineering assistance to power plant O&M etc. the list is not exhaustive. The framework agreement concerns both secondment of employees under DONG Energy's instruction/management and responsibility, and performance of independent consultancy services with professional consulting liability. The Framework agreement is divided into the following Lots: — Lot 1: Engineering Consultancy, Client and Project; — Lot 2: Engineering Consultancy, Building and Construction; — Lot 3: Engineering Consultancy, Mechanical and Process; — Lot 4: Engineering Consultancy, Electrical Installations; — Lot 5: Engineering Consultancy, C&I / Control and Instrumentation Systems; — Lot 6: Engineering Consultancy, Environmental; — Lot 7: Engineering Consultancy, QHSE and Site Manager.

IT Services Agreement concerning SAP IS-U Application Management Services to DONG Energy Services B.V.

DONG Energy Oil & Gas A/S | Published May 9, 2015
cpvs
72000000

IT Services Agreement concerning SAP IS-U Application Management Services to DONG Energy Services B.V.

Petroleum products, fuel, electricity and other sources of energy

Dong Energy A/S | Published October 31, 2017  -  Deadline November 27, 2017
cpvs
09000000

DONG Energy is looking for Certification Bodies (CBs) who can evaluate whether the assessment of the site conditions has been adequately undertaken and documented. They shall verify that the Design Basis is sufficient and adequately documented, to ensure a safe design. The CB shall evaluate that the site-specific loads and load effects are derived in conformity with the design basis, including an independent load analysis. The CB shall verify that the design of the support structures including their bolted connection complies with the applicable codes and standards, the design basis and the results of the ILA. They shall verify the interfaces between the Type Certificate, the ILA and the Support Structure Design Evaluation.

All assessments shall be evaluated in compliance with the IEC 61400-22 Wind turbines — Part 22: Conformity testing and certification. Evaluation reports and accredited IEC Conformity Statements must be issued for each of the described modules.

For prequalification criteria, pls find below.

1. Please document your Accreditation according to ISO/IEC 17065. (Upload Accreditation document)

2. Please document demonstrable experience in the relevant field: Concluded IEC 61400-22 or BSH project certification for at least the modules ‘Site Conditions Evaluation’, ‘Design Basis Evaluation’, ‘Integrated Load Analysis’, ‘Design Evaluation’ (for Turbine Foundations) for a monopile design. Please submit documentation for the below bullets:

— Project Certification Services concluded for the above mentioned fields / modules including foundation type and where the above Certification Services have taken place (EEZ)

— Process description and ideally documented success in integrating certified loads provided by another certification body provided via the turbine supplier.

— Number of MW for the offshore windfarm where the above certification services were provided

The more extensive and more relevant provision of services (references) are similar to the services comprised by the tendered contracts, the higher the score the candidate will receive.

*** IMPORTANT NOTICE ***

The Contracting Entity hereby informs you that applications for exemption from the utilities directive for Generation of Electricity in the Netherlands, cf. article 34 of the utilities directive, is pending at the European Commission. The activities and the geographic area covered by the applications are relevant for the Scope of Works covered by this tender procedure.

It is expected that a decision from the European Commission will be published during the tender procedure. If the European Commission decides to exempt electricity generation in the Netherlands from the utilities directive, the Contracting Entity reserves the right to cancel this tender procedure and source the Scope of Works in a procedure not being subject to the utilities directive.

In this event, the Contracting Entity will not bear any costs for your or any third party acting under instructions from you, related to this tender procedure.

Qualification System for Electrical installation Work and supplies at DONG Energy Thermal Power A/S' power plants in Denmark.

Dong Energy Thermal Power A/S | Published November 15, 2014
cpvs
45310000, 51100000, 51000000, 31300000, 31700000

Qualification System for Electrical installation Work and supplies at DONG Energy Thermal Power A/S' power plants in Denmark.

Cleaning services

DONG Energy Oil og Gas A/S | Published February 14, 2015
cpvs
90910000

Driftsaftale vedr. Rengøringsservice til DONG Energy-lokationer i Danmark.

Oracle Primavera Application Services.

DONG Energy Oil & Gas A/S | Published December 26, 2015  -  Deadline January 22, 2016
cpvs
72200000, 72212517, 72261000, 72266000

DONG Energy Group is one of the leading energy groups in Northern Europe. DONG Energy Group's business is based on procuring, producing, distributing and trading a broad spectrum of commodities across the entire energy supply chain in Northern Europe. DONG Energy Oil & Gas A/S is a part of DONG Energy Group and intend to enter into an agreement on Oracle Primavera Support and Maintenance Services and therefore publish this Contract Notice in order to select the suppliers invited to participate in the tender.

DONG Energy IT is a part of DONG Energy Oil & Gas A/S. DONG Energy IT is looking for an Application Services supplier that can assist the internal Department ‘ERP Logistics’ in carrying out tasks within DONG Energy's Primavera Suite used in the Business Units Exploration and Production and Wind Power. At the moment, the Primavera Suite consists of Primavera P6 EPPM, Primavera Analytics, ETL Tool – Extract, Transport and Load of P6 EPPM data to Primavera Analytics, Primavera BI-publisher, Primavera Risk Analysis and Maxavera integration tools.

The overall Application Services Agreement consist of the following categories:

1. An Application Support Services covering Application Support Standby availability and Application Support Incident Management on 2nd and 3rd level. It will be required by the supplier that it will be able to handle 2nd and 3rd level incident management with a standby availability 24/7.

2. An Application Development Services covering changes, enhancement and project work on an ad hoc basis. The supplier will be required to be able to deliver scalable Application Development Services on site at DONG Energy's locations in Denmark.

Programmering af software og konsulentvirksomhed 2015/S 250-459613

DONG Energy Oil & Gas A/S | Published December 26, 2015  -  Deadline January 22, 2016
cpvs
72200000, 72212517, 72261000, 72266000

DONG Energy Group is one of the leading energy groups in Northern Europe. DONG Energy Group's business is based on procuring, producing, distributing and trading a broad spectrum of commodities across the entire energy supply chain in Northern Europe. DONG Energy Oil & Gas A/S is a part of DONG Energy Group and intend to enter into an agreement on Oracle Primavera Support and Maintenance Services and therefore publish this Contract Notice in order to select the suppliers invited to participate in the tender. DONG Energy IT is a part of DONG Energy Oil & Gas A/S. DONG Energy IT is looking for an Application Services supplier that can assist the internal Department ‘ERP Logistics’ in carrying out tasks within DONG Energy's Primavera Suite used in the Business Units Exploration and Production and Wind Power. At the moment, the Primavera Suite consists of Primavera P6 EPPM, Primavera Analytics, ETL Tool – Extract, Transport and Load of P6 EPPM data to Primavera Analytics, Primavera BI-publisher, Primavera Risk Analysis and Maxavera integration tools. The overall Application Services Agreement consist of the following categories: 1. An Application Support Services covering Application Support Standby availability and Application Support Incident Management on 2nd and 3rd level. It will be required by the supplier that it will be able to handle 2nd and 3rd level incident management with a standby availability 24/7. 2. An Application Development Services covering changes, enhancement and project work on an ad hoc basis. The supplier will be required to be able to deliver scalable Application Development Services on site at DONG Energy's locations in Denmark.

Software package and information systems

Energinet.dk | Published July 9, 2016  -  Deadline August 5, 2016
cpvs

Energinet.dk has decided to develop a platform for sharing energy data. This is a

Software package and information systems

Energinet.dk | Published September 22, 2016
cpvs
48000000, 48600000, 72000000

Energinet.dk — the Danish Transmission System Operator (Contracting Authority) — has decided to develop a platform for sharing energy data. This is a strategic initiative we focus on because we collect and produce a lot of energy data, and we recognize that data and digitalization can contribute to innovation and growth, as well as wiser decision making and better investments, helping the green transition moving forward.

Software package and information systems

Energinet.dk | Published July 5, 2016  -  Deadline August 5, 2016
cpvs

Energinet.dk — the Danish Transmission System Operator (Contracting Authority) — has decided to develop a platform for sharing energy data. This is a strategic initiative we focus on because we collect and produce a lot of energy data, and we recognize that data and digitalization can contribute to innovation and growth, as well as wiser decision making and better investments, helping the green transition moving forward.