Call +44 800 9755 164

Public tenders for energy in Wetzlar Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Electricity

Lahn-Dill-Kliniken GmbH | Published August 4, 2015  -  Deadline September 15, 2015
cpvs
09310000

Conclusion of electricity supply contracts for the supply of Lahn-Dill-Clinics with electrical energy incl. Power usage during the period 1.1.2016 to 31.12.2017.

Architectural, engineering and planning services

Der Kreisausschuss des Lahn-Dill-Kreises | Published November 17, 2016
Winner
Keul und Müller Architekten
cpvs
71240000

It is envisaged that the school building administration, classroom wing and "Old" to rehabilitate basic way and to toughen the energy and fire safety deficiencies in this course. At the same time accessibility is produce.

The plot of the school complex is located in a central location on the outskirts of Greifenstein, district Beilstein. Of the 4 freestanding buildings only the administrative and classroom wing are connected by a portico. Between the two buildings is a 1-storey toilet wing, which has already undergone interior renovation in the year of 2008. The adjoining gym has been renovated basal 2 years ago and is not part of this action. The grounds of the entire school ensemble has also been rehabilitated.

Architectural services for buildings and interiors for the basic exemplary rehabilitation of administrative, classroom wing and old buildings on the Orange-Nassau-Beilstein school.

Architectural and related services

Kreisausschuss des Lahn-Dill-Kreise_FD Technisches Gebäudemanagement-Schulen | Published March 30, 2017
Winner
Schmees Wagner Architekten BDA
cpvs
71200000

The number of students is a school year, on average, 1,050 students in up to 45 classes.

Due to the successful destination planning, ENTIRE provision of LPH 1-3 is not required.

The central complex of the Johannes Gutenberg (Gesamtschule) in Ehringhausen consists of the 3-class gechossigen building with the 1-tailed storey natural science and Polytechnik- / Administration tracts.

625 m 2 BGF done.

The number of students at the Johannes Gutenberg School is a school year, on average, 1,050 students in up to 45 classes.

The science wing was refurbished in 2012 found.

In 2016, the replacement of heating Central took place.

However, the class buildings and Polytechnik- / administrative wing are still fully structurally, home technology, fire protection and energy renovation.

The rehabilitation needs and take place under sensitive consideration of the current school operation in financing and construction phases.

The ground floor is to be adjusted by reorganizing and restructuring of classrooms, workshops, administration and an extension of the assembly hall the revised organizational needs of the school.

For the Disabled tapping the installation of an elevator is planned.

This amount for the next phase of construction EUR 3 000 000 gross and includes the following measures:

2017 planning and construction planning application Gesamtsanierung

2017/2018 renovation roof areas and cultivation Aula

2018/2019 renovation EC Polytechnic

In the other phases following measures are planned:

2019/2020 EC remediation management

2020/2023 redevelopment ground, 1st, 2nd floor class building

EUR 10 million gross.

Due to the previously announced target planning an ENTIRE provision of the power image from the work phases 1-3 will not be necessary.

For budgetary reasons, a gradual, or sections commissioning of services is carried out.

Engineering services

Kreisausschuss des Lahn-Dill-Kreises_FD Technisches Gebäudemanagement-Schulen | Published March 30, 2017
Winner
G-TEC Ingenieure GmbH
cpvs
71300000

The number of students is a school year, on average, 1,050 students in up to 45 classes.

Due to the successful destination planning, ENTIRE provision of LPH 1-3 is not required.

The central complex of the Johannes Gutenberg (Gesamtschule) in Ehringhausen consists of the 3-class gechossigen building with the 1-tailed storey natural science and Polytechnik- / Administration tracts.

625 m 2 BGF done.

The number of students at the Johannes Gutenberg School is a school year, on average, 1,050 students in up to 45 classes.

The science wing was refurbished in 2012 found.

In 2016, the replacement of heating Central took place.

However, the class buildings and Polytechnik- / administrative wing are still fully structurally, home technology, fire protection and energy renovation.

The rehabilitation needs and take place under sensitive consideration of the current school operation in financing and construction phases.

The ground floor is to be adjusted by reorganizing and restructuring of classrooms, workshops, administration and an extension of the assembly hall the revised organizational needs of the school.

For the Disabled tapping the installation of an elevator is planned.

This amount for the next phase of construction EUR 3 000 000 gross and includes the following measures:

2017 planning and construction planning application Gesamtsanierung

2017/2018 renovation roof areas and cultivation Aula

2018/2019 renovation EC Polytechnic

In the other phases following measures are planned:

2019/2020 EC remediation management

2020/2023 redevelopment ground, 1st, 2nd floor class building

EUR 10 million gross.

Due to the previously announced target planning an ENTIRE provision of the power image from the work phases 1-3 will not be necessary.

For budgetary reasons, a gradual, or sections commissioning of services is carried out.

Engineering services

Kreisausschuss des Lahn-Dill-Kreises_FD Technisches Gebäudemanagement-Schulen | Published November 26, 2016  -  Deadline December 23, 2016
cpvs
71300000

The number of students is 1050 students in up to 45 classes per school year on average.

Due to the successful destination planning, an ENTIRE provision of LPH 1-3 is not required.

The central building complex of Johannes Gutenberg (Gesamtschule) in Ehringshausen consists of the 3-gechossigen class building with the connected 1-storey natural science and Polytechnik- / administrative districts.

625 m 2 BGF done.

The number of pupils at the Johannes Gutenberg School is 1050 students in up to 45 classes per school year on average.

The science wing was refurbished in 2012 Design.

In 2016, the renovation of the heating headquarters took place.

However, the class of the building and Polytechnik- / administrative offices are still comprising structurally, technically house, fire protection and energy renovation.

The restoration must be carried out under and sensitive consideration of the current school operation in financing and construction phases.

The ground floor is to be adjusted by reorganizing and restructuring of the classrooms, the workshops, the management and cultivation of the Aula the amended organizational needs of the school.

For the disabled develop the installation of an elevator is planned.

This amount for the next phase of construction 3 million EUR gross and includes the following measures:

2017 planning and construction planning application total renovation;

2017/2018 Restoration roof areas and cultivation hall;

2018/2019 Restoration EC Polytechnic.

In the other phases following measures are planned:

2019/2020 Restoration EC management;

2020/2023 Restoration ground, 1st, 2nd floor class building.

10 million EUR gross.

Due to the previously announced target planning an ENTIRE provision of the power of the image of the work phases 1-3 will not be required.

For budgetary reasons, there is a gradual, or sections, commissioning of services.

Architectural and related services

Kreisausschuss des Lahn-Dill-Kreise – FD Technisches Gebäudemanagement-Schulen | Published November 26, 2016  -  Deadline December 23, 2016
cpvs
71200000

The number of students is 1050 students in up to 45 classes per school year on average.

Due to the successful destination planning, an ENTIRE provision of LPH 1-3 is not required.

The central building complex of Johannes Gutenberg (Gesamtschule) in Ehringshausen consists of the 3-gechossigen class building with the connected 1-storey natural science and Polytechnik- / administrative districts.

625 m 2 BGF done.

The number of pupils at the Johannes Gutenberg School has 1050 students in up to 45 classes per school year on average.

The science wing was refurbished in 2012 Design.

In 2016, the renovation of the heating headquarters took place.

However, the class of the building and Polytechnik- / administrative offices are still comprising structurally, technically house, fire protection and energy renovation.

The restoration must be carried out under and sensitive consideration of the current school operation in financing and construction phases.

The ground floor is to be adjusted by reorganizing and restructuring of the classrooms, the workshops, the management and cultivation of the Aula the amended organizational needs of the school.

For the disabled develop the installation of an elevator is planned.

This amount for the next phase of construction 3 million EUR gross and includes the following measures:

2017 planning and construction planning application total renovation;

2017/2018 Restoration roof areas and cultivation hall;

2018/2019 Restoration EC Polytechnic.

In the other phases following measures are planned:

2019/2020 Restoration EC management;

2020/2023 Restoration ground, 1st, 2nd floor class building.

10 million EUR gross.

Due to the previously announced target planning an ENTIRE provision of the power of the image of the work phases 1-3 will not be required.

For budgetary reasons, there is a gradual, or sections, commissioning of services.

Architectural and related services

Lahn-Dill-Kreis, vertreten durch den Kreisausschuss | Published November 4, 2015
Winner
Bewerbergemeinschaft Keul + Müller Architekten/Bergmann + Müller Architketen + Ing.
cpvs
71200000

The Alexander von Humboldt School (Secondary School) in Asslar was built in the 70s in reinforced concrete frame construction with curtain-aggregate concrete façade. The school covers a gross floor area of ​​approximately 13 500 m3 on 3 floors. The number of pupils at the Alexander von Humboldt-school is on average about 650 Pupil / school year. In summer 2009, extensive studies have been conducted with respect to the static, energy, functional and fire protection state of the building. These deficiencies have been identified that required immediate implementation of rehabilitation and modernization measures mandatory. In 2010, a planning application was submitted for the fire protection renovation. Since up to now the following measures were implemented: - laying of the staff room; - Setting up of teachers bases; - Fire wall retrofit EC; - Restoration of the natural sciences; - BMZ EC; - Cultivation escape staircase West; - Construction flight Steg East; - Rehabilitation of the student and teacher-toilet facilities on the ground floor; - Restoration entrance facade; - Rehabilitation staircase North. To date, there are in accordance with the present building permit. The construction work has not yet been completed and is now to be carried out further during the school operation. For under the announced measure to be planned areas are about 3 million EUR net available for the continuation of the overall measure. Object of the contract are benefits in the form of: - Building design, service phases 2-9 (§§ 33 ff HOAI 2013 i conjunction with Annex 10...). Due to the previously announced plan an ENTIRE provision of power image from the power phases 2 + 3 will not be necessary.
  • 1