Engineering services

Kreisausschuss des Lahn-Dill-Kreises_FD Technisches Gebäudemanagement-Schulen | Published November 26, 2016  -  Deadline December 23, 2016
The number of students is 1050 students in up to 45 classes per school year on average. 

Due to the successful destination planning, an ENTIRE provision of LPH 1-3 is not required.

The central building complex of Johannes Gutenberg (Gesamtschule) in Ehringshausen consists of the 3-gechossigen class building with the connected 1-storey natural science and Polytechnik- / administrative districts.

625 m 2 BGF done.

The number of pupils at the Johannes Gutenberg School is 1050 students in up to 45 classes per school year on average.

The science wing was refurbished in 2012 Design.

In 2016, the renovation of the heating headquarters took place.

However, the class of the building and Polytechnik- / administrative offices are still comprising structurally, technically house, fire protection and energy renovation.

The restoration must be carried out under and sensitive consideration of the current school operation in financing and construction phases.

The ground floor is to be adjusted by reorganizing and restructuring of the classrooms, the workshops, the management and cultivation of the Aula the amended organizational needs of the school.

For the disabled develop the installation of an elevator is planned.

This amount for the next phase of construction 3 million EUR gross and includes the following measures:

2017 planning and construction planning application total renovation

2017/2018 Restoration roof areas and cultivation Aula

2018/2019 Restoration EC Polytechnic

In the other phases following measures are planned:

2019/2020 Restoration EC Management

OG class building

10 million EUR gross.

Due to the previously announced target planning an ENTIRE provision of the power of the image of the work phases 1-3 will not be required.

For budgetary reasons, there is a gradual, or sections, commissioning of services.

Architectural and related services

Kreisausschuss des Lahn-Dill-Kreise – FD Technisches Gebäudemanagement-Schulen | Published November 26, 2016  -  Deadline December 23, 2016
The number of students is 1050 students in up to 45 classes per school year on average. 

Due to the successful destination planning, an ENTIRE provision of LPH 1-3 is not required.

The central building complex of Johannes Gutenberg (Gesamtschule) in Ehringshausen consists of the 3-gechossigen class building with the connected 1-storey natural science and Polytechnik- / administrative districts.

625 m 2 BGF done.

The number of pupils at the Johannes Gutenberg School has 1050 students in up to 45 classes per school year on average.

The science wing was refurbished in 2012 Design.

In 2016, the renovation of the heating headquarters took place.

However, the class of the building and Polytechnik- / administrative offices are still comprising structurally, technically house, fire protection and energy renovation.

The restoration must be carried out under and sensitive consideration of the current school operation in financing and construction phases.

The ground floor is to be adjusted by reorganizing and restructuring of the classrooms, the workshops, the management and cultivation of the Aula the amended organizational needs of the school.

For the disabled develop the installation of an elevator is planned.

This amount for the next phase of construction 3 million EUR gross and includes the following measures:

2017 planning and construction planning application total renovation;

2017/2018 Restoration roof areas and cultivation hall;

2018/2019 Restoration EC Polytechnic.

In the other phases following measures are planned:

2019/2020 Restoration EC management;

2020/2023 Restoration ground, 1st, 2nd floor class building.

10 million EUR gross.

Due to the previously announced target planning an ENTIRE provision of the power of the image of the work phases 1-3 will not be required.

For budgetary reasons, there is a gradual, or sections, commissioning of services.