Call +44 800 9755 164

Public tenders for energy in Waltrop Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Architectural services for buildings

Stadt Waltrop | Published November 11, 2015
Winner
Architekturbüro Dirk Neugebauer Dipl.-Ingenieur Architekt
cpvs
71221000, 71247000

In addition, a reduction of base areas should be achieved by the current input and the foyer area will be demolished and a new entrance and foyer situation is realized elsewhere. 2,800,000 EUR capped and consist of funding and a proper share of the city Waltrop. Part of the earlier procedure for obtaining a positive delivery notification by the Grantor was also the creation of the design planning to the cost calculation. Other basic renovations have not been made in recent years. The Stadthalle Waltrop directly adjoins the market Waltrop, putting it in a central location in downtown. As a central meeting place and venue for events of all kinds the Stadthalle should be available in addition to the use of all kinds of cultural events in particular associations, institutions, and commercial and private users for their own major events and as a meeting place Meeting. A major focus must in this case be placed on reducing the subsequent costs in terms of operation, maintenance and personnel. It is therefore assumed that at least three participation events to be held during the next planning phase, composed of the planner. For the reconstruction and rehabilitation of the energy Stadthalle Waltrop Waltrop City seeks an architect who is able, based on the existing design concepts, establish the further planning steps under adherence to the budget and implement. The gross total cost above this may be exceeded under any circumstances.

Architectural services for buildings

Stadt Waltrop | Published May 2, 2015  -  Deadline May 29, 2015
cpvs
71221000, 71247000

In addition, a reduction of base areas should be achieved by the present entrance and foyer area will be demolished and a new entrance and foyer situation is realized elsewhere. 2,800,000 EUR capped and consist of funds and a co-payment of city Waltrop. Part of the previous procedure for obtaining a positive delivery notification by the Grantor was the creation of the design planning to the cost calculation. Other basic renovations have not been made in recent years. The Stadthalle Waltrop is directly adjacent to the market Waltrop, putting it in a central location in downtown. As a central meeting place and venue for events of all kinds, the town hall should be available in addition to the use of all kinds of cultural events in particular associations, institutions, and commercial and private users for their own major events as well as conference and meeting venue. A major focus must in this case be placed on reducing the subsequent costs in terms of operation, maintenance and personnel. It is therefore assumed that at least three dates participation to take place during the next planning phase, composed of the planner. For the conversion and energy-saving renovation of the city hall, the city Waltrop Waltrop studied an architect who is able, based on the existing design concepts, establish the further planning steps under adherence to the budget and implement. The gross total cost above this may be exceeded under any circumstances.
  • 1