Public tenders for energy in Trier Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Bundeswehr Technical Center for motor vehicles and tanks (WTD 41), Trier / wastewater remediation testing range variant A, Technical equipment, plant groups 1-5 and 7-8.

Bundesrepublik Deutschland, vertreten durch das Bundesministerium der Verteidigung, vertreten durch das Amt für Bundesbau, vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung Niederlassung Trier, vertreten durch den Niederlassungsleiter | Published October 15, 2014  -  Deadline November 17, 2014
cpvs
71000000, 71300000

Reason for Action: Building on the research conducted to date, studies and preliminary planning (ES-construction) are to provide the services. Due to the more than 40 years of operation of the WTA reinforced concrete structures, their mechanical equipment and piping through defect, wear, damage, corrosion, etc. are abgängig. A further criterion of the safety status of the mechanical and electrical equipment is to be run, which also does not meet the current requirements. Measures Description: implementation of the action for all components and assemblies of water conditioning systems according to the following requirements: The planning of technical equipment shall be prepared by the water legislation, the provisions of the occupational safety and all environmental requirements. Water rights issues are coordinated with the regional competent authorities. Development of the contributions for the water permit planning to WHG and LWG are even-if part of the task. The economic operation of the plant with respect to the economical use of resources, energy and personnel must be considered as a top priority in the planning process. Planning is responsible to coordinate with the turned professional planners for civil engineering structures (§ 41 HOAI). The plan is divided structurally into three sub-projects: - Technical water system (WTA1). Treatment of dams waters (up to 700 m³ / d) with the plant parts flakes filtration, the hardening effect (CO2 + Hydro-calcite) and sanitizing with chlorine bleach. - Wading, swimming and diving pools (WTS). Treatment plant with recycle mode (740 m³ / h) with system components flakes filtration and sanitizing with chlorine gas, and a coalescence separator. - Tank washing system (PWA). Treatment plant with recirculation (125 m³ / h) with the parts of the plant flotation, UV sterilization, recycling tanks and coalescence separator. All power installations and all electrical control, measurement and control technology to be renewed. A variant of consideration in the form of a study is already available and will be provided by the client. 1.8 million EUR (gross) estimated. How to Order: spring 2015 presentation ES construction: end of June 2015 compilation of the individual technical contributions to a "total" -ES construction: end of June 2015 submission of the AFU construction (after approval): March 2016 Start of construction: July 2016 End of construction July 2018th

Consultative engineering and construction services

Bundesrepublik Deutschland, vertreten durch das Bundesministerium der Verteidigung, vertreten durch das Amt für Bundesbau, vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung Niederlassung Trier, vertreten durch den Niederlassungsleiter | Published July 4, 2015
Winner
Eepi GmbH
cpvs
71310000

Grounds for the operation: The equipment for the collection and treatment of surface water in the German army property "Bundeswehr Technical Center for motor vehicles and tanks WTD 41" no longer meet the requirements and are in need of rehabilitation. Due to the more than 40-year operating period of the WTA reinforced concrete structures whose mechanical equipment and pipelines by defect, wear, damage, corrosion, etc. are abgängig. Alsweiteres criterion is the safety status of the mechanical and electrical equipment necessary to state who also do not meet current requirements equivalent measures Description: Based on the studies conducted so far, studies and preliminary planning is the decision pad construction (ES-construction) in EW-building to create quality. Creation of decision support construction (ES-building) on ​​the basis of "3" already present decision documents for all components and assemblies of water technical system according to the following requirements: water rights issues must be approved by the competent regional SGD North. Development of the contributions for the water permit planning to WHG and LWG are just-if part of the task. The economic operation of the plant in terms of the economical use of resources in energy and personnel is to be considered as a top priority in the planning process. If further contributions of specialized experts or specialized planners necessary they should also be integrated into the ES-construction. The plan is divided into 3 sub-projects: Part 1: Rehabilitation of water technical system (WTA), consisting of 1 and WTA WTA WTA 2. 1: - Construction of a new treatment plant next to the pump house II, exclusively for dams waters. - De-acidification and hardening by gassing with carbon dioxide (CO2) and subsequent filtration of the water. WTA 2: - Construction of a new cycle-processing plant next to Wat-diving and swimming pool (WTS-basin), exclusively for WTS-pool water. - Water management through closed filter vessel. Part 2: redevelopment of wading, swimming, and diving basin (WTS Basin): - renovation of the pool (concrete repair) and replacement of equipment, mechanical engineering, electrical and measurement, and control technology. Part 3: Tank washer (PWA): - Construction of a circulatory treatment plant, exclusively for wash water from the tank washing system, in accordance with Annex 49 of the Waste Water Ordinance (AbwV). Production costs (eligible costs) is estimated at 12 million EUR (gross). Ordering: spring 2015. template ES construction: end of June 2015. Compilation of the individual technical contributions to a "total" - ES construction: end of June 2015 presentation of the AFU construction (after approval) March 2016. Start of construction July 2016th

Bundeswehr Technical Center for motor vehicles and tanks (WTD 41), Trier / wastewater remediation testing range variant A, Facility Planning, Engineering Structures.

Bundesrepublik Deutschland, vertreten durch das Bundesministerium der Verteidigung, vertreten durch das Amt für Bundesbau, vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung Niederlassung Trier, vertreten durch den Niederlassungsleiter | Published October 15, 2014  -  Deadline November 17, 2014
cpvs
71000000, 71300000

Justification of the measure: The equipment for the collection and treatment of surface water in the Bundeswehr property "Bundeswehr Technical Center for motor vehicles and tanks WTD 41" no longer meet the requirements and are in need of rehabilitation. Due to the more than 40-year operating time of the WTA reinforced concrete structures, their mechanical equipment and piping through defect, wear, damage, corrosion, etc. are abgängig. A further criterion of the safety status of the mechanical and electrical equipment is to be run, which also do not meet current requirements equivalent measures Description: Building on the research conducted to date, studies and preliminary planning is the decision Pad Construction (ES-construction) in EW-building to create quality . Creation of decision support construction (ES-construction) on the basis of "3" already present decision documents for all components and assemblies of the water conditioning system in accordance with the follow-requirements: water Legal issues must be agreed with the competent regional SGD North. Development of the contributions for the water permit planning to WHG and LWG are even-if part of the task. The economic operation of the plant with respect to the economical use of resources, energy and personnel must be considered as a top priority in the planning process. If additional contributions of specialized experts or planners required, these should also be integrated into the ES building. The plan is divided into three sub-projects: Part 1: Rehabilitation of Water Technology System (WTA), consisting of one WTA and WTA WTA second one: - Construction of a processing plant next to the pump house II, exclusively for dams waters. - Neutralization and hardening by gassing with carbon dioxide (CO2) and subsequent filtration of the water. WTA 2: - Construction of a new vascular treatment plant next to Wat-diving and swimming pool (WTS Basin), exclusively for WTS-pool water. - Water flow on closed filter vessel. Part 2: Rehabilitation of wading, swimming, and diving pool (WTS Basin): - Renovation of the pool (concrete repair) and replacement of equipment, mechanical engineering, electrical engineering and measurement, and control technology. Part 3: tank washing system (PWA): - Construction of a new vascular treatment plant exclusively for wash water from the wash tank, in accordance with Annex 49 of the Waste Water Ordinance (AbwV). The production costs (allowable costs) are estimated at 12 million EUR (Gross). How to Order: spring 2015 presentation ES construction: end of June 2015 compilation of the individual technical contributions to a "total" - ES construction: end of June 2015 submission of the AFU construction (after approval): March 2016 Start of construction: July, 2016th