Public tenders for energy in Trier Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Electricity

Zweckverband Wasserwerk Kylltal | Published October 2, 2015  -  Deadline November 10, 2015
cpvs
09310000

Supply of electricity from renewable energy sources (green power) (power and work) with Registrant performance measurement for water supply systems of the Zweckverband Wasserwerk Kylltal (9 in total delivery points). The delivery of the electrical energy to the 9 Abnahmestellen takes the form of three-phase from the medium-voltage network with a voltage of 20 kV and a frequency of 50 Hz. There is a power supply including power usage.

Electricity

SWT Anstalt des öffentlichen Rechts der Stadt Trier (SWT-AöR) | Published October 4, 2016  -  Deadline November 10, 2016
cpvs
09310000

Supply of electricity from renewable energy sources (green power) for public street lighting in the city of Trier for the years 2017 and 2018th

Electricity

SWT Anstalt des öffentlichen Rechts der Stadt Trier (SWT-AöR) | Published February 3, 2017
Winner
SWT Stadtwerke Trier Versorgungs-GmbH
cpvs
09310000

Supply of electricity from renewable energy sources (green power) for the street lighting of the SWT-AöR for the years 2017 and 2018th

Supply of electricity from renewable energy sources (green power) for public street lighting in the city of Trier for the years 2017 and 2018th

The delivery to 2 delivery points with-registering performance measurement.

Electricity

LBB Niederlassung Trier | Published March 25, 2016
Winner
Energieversorgung Mittelrhein AG
cpvs
09310000

Delivery Electric Power - "100% green"

Vergabeunterlagen can be loaded up to the submission deadline without free from Vergabemarktplatz Rheinland Pfalz www.vergabe.rlp.de immediately. For applicable terms and conditions of procurement marketplace.

Electricity

LBB Niederlassung Trier | Published September 2, 2015  -  Deadline October 21, 2015
cpvs
09310000, 65310000

Supply of electricity - "100% green electricity". Vergabeunterlagen can be loaded up to the submission deadline for free download from Vergabemarktplatz Rheinland Pfalz www.vergabe.rlp.de immediately. For applicable terms and conditions of procurement marketplace.

Electricity

Stadtverwaltung Trier | Published December 15, 2015
Winner
SWT Stadtwerke Trier Versorgungs-GmbH
cpvs
09310000

Supply of electricity from 100% renewable energy at a fixed price to all listed in the bill of delivery points of the city of Trier with and without registering performance measurement. Delivery period 01.01.2016 until 31.12.2017. Electricity supply including power usage (all-inclusive electricity supply), contain about 7.8 million kWh per year.

Architectural, construction, engineering and inspection services

SWT – Anstalt des öffentlichen Rechts der Stadt Trier | Published March 18, 2017  -  Deadline April 13, 2017
cpvs
71000000, 71320000

The qualitative evaluation of the proposed solutions will be done by a selection committee of the client.

Supply of electricity for the years 2016-2017.

Zweckverband Wasserwerk Kylltal | Published February 19, 2016
cpvs
09310000

Supply of electricity for the years 2016-2017.

Electricity

Stadtverwaltung Trier | Published August 19, 2015  -  Deadline October 6, 2015
cpvs
09310000

Supply of electricity from 100% renewable energy at a fixed price to all listed in the bill of delivery points of the city of Trier with and without registering performance measurement. Delivery period January 1 2016 to December 31, 2017. Power supply, including network usage (all-inclusive electricity supply), contain about 7.8 million kWh per year.

Electricity

LBB Niederlassung Trier | Published December 12, 2015
Winner
Stadtwerke Neuwied GmbH
cpvs
09310000

Supply of electricity to counties and municipalities in association Rheinland-Pfalz - Lot 1 to Lot 4. tender documents can be loaded up to the submission deadline for free download from Vergabemarktplatz Rheinland Pfalz www.vergabe.rlp.de immediately. For applicable terms and conditions of procurement marketplace.

Electricity

LBB Niederlassung Trier | Published August 22, 2015  -  Deadline October 9, 2015
cpvs
09310000, 65310000

Supply of electricity to counties and municipalities in association Rheinland-Pfalz - Lot 1 to Lot 4. tender documents can be loaded up to the submission deadline for free download from Vergabemarktplatz Rheinland Pfalz www.vergabe.rlp.de immediately. For applicable terms and conditions of procurement marketplace.

Architectural, construction, engineering and inspection services

Cusanus Trägergesellschaft Trier mbH | Published February 26, 2015
Winner
W+P Ingenieure GmbH
cpvs
71000000, 71200000, 71300000, 71240000

The client intends in several stages for the organization of energy, building services and fire protection renovations at Caritas Hospital Lebach: - Moving endoscopy of the 4th floor in empty rooms on the ground floor; - Roof restoration; - Window Restoration; - Connection SV-sockets of the patient's room to new SV distributions; - Renovation lighting corridors; - Renovation of water pipes in shafts and corridors; - During construction activities in shafts and corridors; - Manufacture of fire protection detached storage rooms with elevator cores; - Accompanying fire Renovations; - Renovation visitors toilet first floor and 6 are not yet renovated bathrooms patients; - Renovation of kitchen and dishwasher; - Locking system; - Patient call system and television equipment; - Separation station drinking water.

Engineering design services

Handwerkskammer Trier | Published November 27, 2015
Winner
KREBS + KIEFER Ingenieure GmbH
cpvs
71320000

The existing administrative area, and the building of the German Welding Association are retained, all other existing parts of the building will be dismantled. The planned construction project is subsidized by federal and state funding construction project based on the "Common guidelines for the promotion of intercompany training centers and their further development into centers of competence (24.6.2009)" of the Federal Ministries of Education and Research and of Economics and Technology. The aim is the creation of an optimized in terms of energy efficiency and modern handicraft training project. 9700 m2 of floor space. 350 m2. The architectural integration of the building here has a high priority. This budget is mandatory as construction cost ceiling for the realization of the project. The frame schedule provides a brief familiarization phase from May 2015 for all those involved in the planning. The plan includes: - Creation HU-Bau until 30.9.2015; - Completion shell until spring 2017. For this reason, need to be started immediately after commissioning the plans. The following services are commissioned in stages on the basis of HOAI: HOAI only benefits the service phases 1 (Basic Data), 2 (planning) and 3 (design planning) are first commissioned.

Architectural, construction, engineering and inspection services

Handwerkskammer Trier | Published February 14, 2015  -  Deadline March 12, 2015
cpvs
71000000, 71300000, 71320000

The existing administrative area, and the building of the German Welding Association will be maintained, all existing parts of the building will be dismantled. The planned project is subsidized by federal and state funding construction project on the basis of the "common guidelines for the promotion of inter-company vocational training centers and their development into centers of excellence (24.6.2009)" of the Federal Ministry of Education and Research of Economics and Technology. The aim is to create an optimized in terms of energy efficiency and advanced craft training project. 9700 m2 of floor space. 350 m2. The architectural integration of building here has a high priority. This budget is mandatory as a construction cost ceiling for the realization of the project. The frame schedule provides a brief training period from May 2015 for all those involved in the planning. This will include: - Creating HU-building to 30.9.2015. - Completion shell until spring 2017. For this reason, must be started immediately after commissioning and planning. The following services are commissioned in stages on the basis of HOAI: HOAI only benefits the service phases 1 (Basic Data), 2 (forecast) and 3 (preliminary design) are first commissioned.

Architectural and related services

Handwerkskammer Trier | Published May 13, 2015
Winner
ARGE Michel + Wolf + Partner mit Glück+Partner GmbH Freie Architekten BDA mit IWP Ingenieurbüro für Systemplanung GmbH
cpvs
71200000, 71221000, 71300000, 71315000

The Promoter intends to use the following services gradually to commission: basic services of project planning for buildings in accordance with § 34 HOAI in conjunction with Annex 10.1 and basic services of professional planning Technical From Armor according to § 55 HOAI in conjunction with Annex 15.1, each power phase (LP) 1 9 and a PHPP-calculation to demonstrate the Passive House standard as a special achievement to accompany the work phases 2-8 and accompany the performance phase 9 in the form of monitoring. Here are entered approximately 6,900 companies with 39,000 employees and around 3900 students. The functionality of the premises and equipment should in this case be associated with a role model. Furthermore, the functional areas for management Hauslei-tung, for building equipment and IT are provided in the space program. The architectural integration of the building here has a high priority. The outdoor area should be designed taking into account the high-water problems. Competitors are encouraged by an appropriate building design, by compact construction-wise and by the choice of materials and energy concept prescribed by the Promoter construction costs a-hold and this is also already under the competitive performance "cost estimate for the competition entry" prove.

Architectural services for buildings

Stadt Trier | Published February 1, 2017  -  Deadline March 1, 2017
cpvs
71221000, 71320000

The client intends the gradual commissioning of the work phases 2-9 for the refurbishment Mehrzweckhalle Mäusheckerweghalle.

The following three stages are provided: Level 1 - LP 2-3, preliminary design and design planning, stage 2 - LP 4-5 approval, detailed design, stage 3 - LP 6-9 allocation, property supervision, site supervision and documentation.

Vote and Information Reporting to grant donor during the project period

A legal claim for transfer of other services or the special services does not exist.

The currently disused Dreifeld hall will be used again in full for school sports, for training and match high number of spectators as well as event hall accessible.

The functional areas should be brought to the state of technology and upgraded fire protection.

There is provided a radiant heater with integrated safe against ball throwing LED lighting.

In the vertical envelope surfaces inside and out are surface-finished components are used to shorten construction times.

The objective of planning and thus design task is to create a hybrid building that meets high energy requirements, due to prefabricated components allows rapid construction process and in view of a holistic design provides a positive contribution to building culture development of the public building.

Necessary documents and information to be provided by the contractor to the client to prompt.

3 150 m 2 ,

Total cost (construction cost):

2,950,000 EUR (gross)

1,600,000 EUR (gross)

Period of implementation:

According to information currently planning beginning 06/01/2017

Completion by the end of 2018

For this reason, the plans must be started immediately after commissioning.

Engineering design services

Stadt Trier | Published February 1, 2017  -  Deadline March 2, 2017
cpvs
71320000, 71321000

The client intends the gradual commissioning of the work phases 2-9 for the refurbishment Mehrzweckhalle Mäusheckerweghalle.

The following three stages are provided: Level 1 - LP 2-3, preliminary design and design planning, stage 2 - LP 4-5 approval, detailed design, stage 3 - LP 6-9 allocation, property supervision, site supervision and documentation.

Vote and Information Reporting to grant donor during the project period

A legal claim for transfer of other services or the special services does not exist.

The currently disused Dreifeld hall will be used again in full for school sports, for training and match high number of spectators as well as event hall accessible.

The functional areas should be brought to the state of technology and upgraded fire protection.

There is provided a radiant heater with integrated safe against ball throwing LED lighting.

In the vertical envelope surfaces inside and out are surface-finished components are used to shorten construction times.

The objective of planning and thus design task is to create a hybrid building that meets high energy requirements, due to prefabricated components allows rapid construction process and in view of a holistic design provides a positive contribution to building culture development of the public building.

Necessary documents and information to be provided by the contractor to the client to prompt.

3 150 m 2 ,

Total cost (construction cost):

2,950,000 EUR (gross)

1,600,000 EUR (gross)

Period of implementation:

According to information currently planning beginning 06/01/2017

Completion by the end of 2018

For this reason, the plans must be started immediately after commissioning.

Engineering services

Bundesrepublik Deutschland, vertreten durch das Bundesministerium der Verteidigung, vertreten durch dasAmt für Bundesbau, vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung Niederlassung Trier, vertreten durch den Niederlassungsleiter | Published July 4, 2015
Winner
Bietergemeinschaft Eepi GmbH – PCE GmbH
cpvs
71300000

Grounds for the operation: Based on the studies conducted so far, studies and preliminary planning (ES-construction) are to provide the services. Due to the more than 40 years of operation of the WTA reinforced concrete structures whose mechanical equipment and pipelines by defect, wear, damage, corrosion, etc. are abgängig. A further criterion of the safety status of the mechanical and electrical equipment is to be run, which is also not in line with current requirements. Measures description: implementation of the action for all the components and assemblies of water conditioning systems according to the following requirements: The planning of the technical installations shall be developed by the water legislation, the provisions of occupational safety and all environmental requirements. Water law needs to be agreed with the regional competent authorities. Development of the contributions for the water permit planning to WHG and LWG are just-if part of the task. The economic operation of the plant in terms of the economical use of resources in energy and personnel is to be considered as a top priority in the planning process. Planning is responsible for coordinating with the turned-planners for civil engineering structures (§ 41 HOAI). The plan is divided structurally into 3 sub-projects: - water technical system (WTA1). Treatment of dams waters (up to 700 m3 / d) with the system components Flake filtration, hardness increase (CO2 + Hydro-calcite) and sanitizing with chlorine bleach. - Wading, swimming and diving pools (WTS). Treatment plant with circulation mode (740 m3 / h) with plant parts Flake filtration and sanitizing with chlorine gas, as well as a coalescence separator. - Reinforced washer (PWA). All power installations and the entire electrical control, measurement and control technology are renewed. A variant of consideration in the form of a study is already available and will be provided by the client. 1,800,000 EUR (gross) estimated. Ordering: spring 2015. template ES construction: end of June 2015. Compilation of the individual technical contributions to an "overall" it-construction: the end of June 2015 presentation of the AFU construction (after approval) March 2016. Start of construction: July 2016. End of construction July 2018th

Bundeswehr Technical Center for motor vehicles and tanks (WTD 41), Trier / wastewater remediation testing range variant A, Technical equipment, plant groups 1-5 and 7-8.

Bundesrepublik Deutschland, vertreten durch das Bundesministerium der Verteidigung, vertreten durch das Amt für Bundesbau, vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung Niederlassung Trier, vertreten durch den Niederlassungsleiter | Published October 15, 2014  -  Deadline November 17, 2014
cpvs
71000000, 71300000

Reason for Action: Building on the research conducted to date, studies and preliminary planning (ES-construction) are to provide the services. Due to the more than 40 years of operation of the WTA reinforced concrete structures, their mechanical equipment and piping through defect, wear, damage, corrosion, etc. are abgängig. A further criterion of the safety status of the mechanical and electrical equipment is to be run, which also does not meet the current requirements. Measures Description: implementation of the action for all components and assemblies of water conditioning systems according to the following requirements: The planning of technical equipment shall be prepared by the water legislation, the provisions of the occupational safety and all environmental requirements. Water rights issues are coordinated with the regional competent authorities. Development of the contributions for the water permit planning to WHG and LWG are even-if part of the task. The economic operation of the plant with respect to the economical use of resources, energy and personnel must be considered as a top priority in the planning process. Planning is responsible to coordinate with the turned professional planners for civil engineering structures (§ 41 HOAI). The plan is divided structurally into three sub-projects: - Technical water system (WTA1). Treatment of dams waters (up to 700 m³ / d) with the plant parts flakes filtration, the hardening effect (CO2 + Hydro-calcite) and sanitizing with chlorine bleach. - Wading, swimming and diving pools (WTS). Treatment plant with recycle mode (740 m³ / h) with system components flakes filtration and sanitizing with chlorine gas, and a coalescence separator. - Tank washing system (PWA). Treatment plant with recirculation (125 m³ / h) with the parts of the plant flotation, UV sterilization, recycling tanks and coalescence separator. All power installations and all electrical control, measurement and control technology to be renewed. A variant of consideration in the form of a study is already available and will be provided by the client. 1.8 million EUR (gross) estimated. How to Order: spring 2015 presentation ES construction: end of June 2015 compilation of the individual technical contributions to a "total" -ES construction: end of June 2015 submission of the AFU construction (after approval): March 2016 Start of construction: July 2016 End of construction July 2018th

Consultative engineering and construction services

Bundesrepublik Deutschland, vertreten durch das Bundesministerium der Verteidigung, vertreten durch das Amt für Bundesbau, vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung Niederlassung Trier, vertreten durch den Niederlassungsleiter | Published July 4, 2015
Winner
Eepi GmbH
cpvs
71310000

Grounds for the operation: The equipment for the collection and treatment of surface water in the German army property "Bundeswehr Technical Center for motor vehicles and tanks WTD 41" no longer meet the requirements and are in need of rehabilitation. Due to the more than 40-year operating period of the WTA reinforced concrete structures whose mechanical equipment and pipelines by defect, wear, damage, corrosion, etc. are abgängig. Alsweiteres criterion is the safety status of the mechanical and electrical equipment necessary to state who also do not meet current requirements equivalent measures Description: Based on the studies conducted so far, studies and preliminary planning is the decision pad construction (ES-construction) in EW-building to create quality. Creation of decision support construction (ES-building) on ​​the basis of "3" already present decision documents for all components and assemblies of water technical system according to the following requirements: water rights issues must be approved by the competent regional SGD North. Development of the contributions for the water permit planning to WHG and LWG are just-if part of the task. The economic operation of the plant in terms of the economical use of resources in energy and personnel is to be considered as a top priority in the planning process. If further contributions of specialized experts or specialized planners necessary they should also be integrated into the ES-construction. The plan is divided into 3 sub-projects: Part 1: Rehabilitation of water technical system (WTA), consisting of 1 and WTA WTA WTA 2. 1: - Construction of a new treatment plant next to the pump house II, exclusively for dams waters. - De-acidification and hardening by gassing with carbon dioxide (CO2) and subsequent filtration of the water. WTA 2: - Construction of a new cycle-processing plant next to Wat-diving and swimming pool (WTS-basin), exclusively for WTS-pool water. - Water management through closed filter vessel. Part 2: redevelopment of wading, swimming, and diving basin (WTS Basin): - renovation of the pool (concrete repair) and replacement of equipment, mechanical engineering, electrical and measurement, and control technology. Part 3: Tank washer (PWA): - Construction of a circulatory treatment plant, exclusively for wash water from the tank washing system, in accordance with Annex 49 of the Waste Water Ordinance (AbwV). Production costs (eligible costs) is estimated at 12 million EUR (gross). Ordering: spring 2015. template ES construction: end of June 2015. Compilation of the individual technical contributions to a "total" - ES construction: end of June 2015 presentation of the AFU construction (after approval) March 2016. Start of construction July 2016th