Landeshauptstadt Stuttgart, Hochbauamt | Published March 15, 2017  -  Deadline April 11, 2017
cpvs
71200000

The district Neckar Park is urban redeveloped. For the NeckarPark area an energy center will be created, which will supply the entire area. In addition, to be built on the same grounds a neighborhood park.

The building will include the energy center, a neighborhood park with at least about 300 parking spaces, a bicycle station for about 100 bicycles with workshop and adjoining rooms as well as a free standing or building integrated gas transfer station and substation.

Special features of B-Plan include a noise barrier to the street with 16.5 m and a minimum of 30% vegetated facade without intensive care.

Since the power station has to go earlier in operation, the construction of the parking garage is drawn.

Building Design HOAI 2013 Part 3, Section 1 (architectural services in accordance with § 34 HOAI) for the new parking garage with power station in Stuttgart-Bad Cannstatt.

The cost of the technical equipment of the power station are not eligible costs of the building design.

The appointment is a function of the project approved by the City Council of the City of Stuttgart under a contract stages. The contractor is obliged to accept the power not power stage 9 HOAI if the project comes to realization. The client intends the power gradually to instruct.

A legal claim for the transfer of all power levels does not exist.

Load-bearing structure design services

Landeshauptstadt Stuttgart, Hochbauamt | Published March 15, 2017  -  Deadline April 11, 2017
cpvs
71327000

The district Neckar Park is urban redeveloped. For the NeckarPark area an energy center will be created, which will supply the entire area. In addition, to be built on the same grounds a neighborhood park.

The building will include the energy center, a neighborhood park with at least about 300 parking spaces, a bicycle station for about 100 bicycles with workshop and adjoining rooms as well as a free standing or building integrated gas transfer station and substation.

Special features of B-Plan include a noise barrier to the street with 16.5 m and a minimum of 30% vegetated facade without intensive care.

Since the power station has to go earlier in operation, the construction of the parking garage is drawn.

Benefits of structural engineering HOAI Part 4, Section 1, Phases 1-6, and 8 in accordance with

§ 49 et seq. For the project listed under II.2.4).

The cost of the technical equipment of the power station are not eligible costs of the building design.

The appointment is a function of the project approved by the City Council of the City of Stuttgart under a contract stages. The contractor is obliged to accept the power not power phase 6 HOAI if the project comes to realization. The client intends the power gradually to instruct.

A legal claim for the transfer of all power levels does not exist.