Call +44 800 9755 164

Public tenders for energy in Stuttgart Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!


AOK Baden-Württemberg Hauptverwaltung | Published September 24, 2016  -  Deadline October 26, 2016
is put out to tender the supply of electricity from renewable energy sources (green power) for the AOK Baden-Württemberg in the period 1.1.2017 - 31.12.2017. The total annual electricity consumption is 4.47 million kWh and distributed to 19 load-metered delivery points.

Engineering services

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Universitätsbauamt Stuttgart und Hohenheim | Published October 19, 2016  -  Deadline November 21, 2016
The buildings of the University of Hohenheim are supplied from a heating plant via a district heating network with heat. In heating 3 hot water boilers and a cogeneration unit installed. Under an already completed preliminary design has been established, to the use of an additional cogeneration module to further improve the efficiency of heat and electricity supply and to reduce the primary energy factor of the district heating supply considerably.
  • 1