University of Hohenheim, Ext. U.Ausbau of energy supply, laying of district heating pipes

Staatliche Vermögens- und Hochbauverwaltung Baden-Württemberg | Published December 1, 2016  -  Deadline December 22, 2016
University of Hohenheim, Ext. U.Ausbau of energy supply, laying of district heating pipes

Electricity supply installations

Universität Stuttgart, Zentrale Beschaffungsstelle | Published December 7, 2016  -  Deadline January 16, 2017

On the grounds of the University of Stuttgart, Campus Vaihingen, 70569 Stuttgart is at the Institute for Electrical Energy Conversion (IEW), Pfaffenwaldring 47, a new DC power supply (DC power) installed.

This consists of a two-channel DC source (DC 1 and 2) and four single-channel DC sources 3-6.

On the grounds of the University of Stuttgart, Vaihingen campus, is a new DC power supply (DC power) installed at the Institute for Electrical Energy Conversion (IEW).

The software is installed in the converter room, U1.325.

15 m on the raised floor, with area load 38,000 N / m 2 , Point load 6750 N

This electrical equipment room is only trained personnel available.

40 m.

Power is provided in accordance with the existing installation.

Lot 1: DC 1 and 2:

DC source / sink power range 120kw

This remote control and programming needs of both the location of the connected terminal table as well - be possible from any location via an Ethernet interface - within the project an inter-university test networking.

The tender documents consist of:

Bid document, layout, leaflet contractors undertaking (LTMG) ZVB-BW, offer characteristic list, Eigenerklärung suitability, conditions of the University of Stuttgart, Form grouping form bidders structure.

On the grounds of the University of Stuttgart, Vaihingen campus, is a new DC power supply (DC power) installed at the Institute for Electrical Energy Conversion (IEW).

The software is installed in the converter room, U1.325.

15 m on the raised floor, with area load 38 000 N / m 2 , Point load 6750 N

This electrical equipment room is only trained personnel available.

40 m.

Power is provided in accordance with the existing installation.

Lot 2: DC 3 to 6:

DC source / power range 30kW

This remote control and programming needs of both the location of the connected work table as well - be possible from any location via an Ethernet interface - within the project an inter-university test networking.

The tender documents consist of:

Bid document, layout, leaflet contractors undertaking (LTMG) ZVB-BW, offer characteristic list, Eigenerklärung suitability, conditions of the University of Stuttgart; Form grouping form bidders structure.

Support services for water transport

EnBW AG | Published December 2, 2016  -  Deadline January 13, 2017

Planning, construction and operation of a "Marine Coordination Office" during the deployment phase of the offshore wind farms High Seas / optional Albatros. The construction and operation carried out in accordance with legal requirements, including the implementing Directive Seeraumbeobachtung ", the" Offshore Wind Energy - Security Framework "1 and the" G9 Offshore Wind Good Practice Guidelines ". The contractor shall provide all personnel (MarineCoordinator) as well as the associated VTMS software and hardware.

Marine Coordinator in 1- to 3-shift operation incl. Assistance and the necessary VTMS software and hardware.

Preparatory work from mid-2017 shifts from early February 2018 to the end of 2019 (with option to extend).

Repair, maintenance and associated services related to railways and other equipment

Schienenfahrzeuge Baden-Württemberg AöR | Published November 22, 2016

The client is considering operating a partially electrified network to provide about 10-15 rail vehicles with innovative propulsion technologies. For this to be carried out at a later date, a technology open negotiation process, that is, the customer is the driving technology not before but wants this to select the competition. Suitable examples include fuel cell unit trains, trains arrive with fast charging technology, battery powered or hybrid trains. The list is not exhaustive.

The manufacturer shall be responsible for the long term availability of the vehicles and their energy supply. The vehicles are to be approved in December 2021 and used.

1. Implementation of expert talks.

The principal charge under this expression of interest procedure, interested vehicle manufacturers have to be discussions with experts on innovative drive technologies. The talks are to be held in late November in Stuttgart. The customer also reserves the right to invite him known and suitable company to the talks.

2. Expressions of Interest.

Interested companies are asked to apply to the notified I.1) point for participation in the expert interviews.

3. Time limit for receipt of expressions of interest.

The expressions of interest to participate in the expert meetings must be submitted immediately to the address specified in point I.1).

  • 1