Public tenders for energy in Stadtallendorf Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyGermanystadtallendorf

Wind-energy generators

Windpark Hopfenberg GmbH | Published November 14, 2015
cpvs
31121300, 31121340, 45251160, 45259000

Windenergieerzeuger

Wind-energy generators

Windpark Hopfenberg GmbH | Published August 29, 2015  -  Deadline September 24, 2015
cpvs
31121300, 31121340, 45251160, 45259000

The contractor is responsible for the supply, erection, commissioning and maintenance for a period of at least 15 years of 4 wind power plants for the site between Neustadt and Stadtallendorf. The Contractor shall ensure that the production, supply, installation, commissioning and maintenance in accordance with the legislation in force and the current technical standard. The wind turbines offered should meet the following minimum criteria: delivery capacity of 4 wind turbines for IEC Wind Class IIIa with the following characteristics: - Suitable power curve for low-wind locations (planned for use at an average wind speed of 6.2 to 6.6 m / s), - nominal capacity of 2.3 to 3.2 MW (alternatives allowed) - hub heights at least 135 m, - tubular steel tower, concrete tower or hybrid tower (concrete and steel), - rotor diameter of at least 115 m, - power limitation: pitch control of the rotor blades, - location-optimized construction way for forest sites ( possible small crane Pitch and assembly and warehouse space as well as single-sheet assembly), - unit In compliance with SDLWindV, - Type Certificate IEC WT01, as amended, created by an accredited institution such as GL Wind, TÜV Nord and TÜV Süd, - Required foundations for soils up to soil class 5 , - wind turbine transformer 20 kV, - medium-voltage switchgear SF6.
  • 1