Call +44 800 9755 164

Public tenders for energy in Schweinfurt Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyGermanyschweinfurt

Load-bearing structure design services

Staatliches Bauamt Schweinfurt | Published December 3, 2016  -  Deadline January 2, 2017

Fachplanung structural engineering according to § 49-52 HOAI 2013

BA New

8th

BGF 10 000m 2 without underground; BRI 28 000 m 3 (Without underground car park)

Underground 24,590,000 EUR (gross).

These costs include the cost group 200-600 DIN 276th

1 HOAI classified.

BA remediation historic main building and former accounts office

8th

GFA: 9600 m 2 (Historic main building) + 2 300m 2 (Bursary) = 11 900 m 2

BRI 42 000m 3 (Historic main building) + 8 600m 3 (Bursary) = 50 600 m 3

Cost ceiling 12,560,000 EUR (gross).

These costs include the cost group 200-600 DIN 276th

1 HOAI classified.

General:

Visit VgV-F negotiated procedure is planned by the Bavarian State Ministry of Justice accommodating the courts and judicial authorities in Schweinfurt.

Linked to this is in the wake of the reconstruction / modernization of existing buildings historic building with former bursary.

BA renovation / modernization of the listed existing building (historic main building and former accounts office).

This architectural competition for the building design according to § 34 HOAI is not part of this negotiation process.

Information about Fachplanung:

Such invitations to tender for the structural design § 49-52 HOAI for the new building with garage of the justice center and the renovation / modernization of existing buildings.

The planned renovation / modernization and new construction, the Justice intends to house the courts and judicial authorities in Schweinfurt at one site, and therefore linked to adapt the current space requirements in compliance with the current safety aspects.

By taking place in the wake of reconstruction / modernization of the existing buildings (historic main building and former accounts office) is a compact Justice Center in the downtown area of ​​Schweinfurt be created.

In addition, a spatial separation of the offices of the employees and the public sector to bring about.

Due to the possible with the construction of concentration of all judicial office employees in a building (new construction, historic main building and former accounts office), all existing human resources can be used efficiently and without frictional losses.

4300 m 2 (NUF 1-6) planned.

4000 m 2 (NUF 1-6).

The new building is to be designed as energy-efficient building with passive energy-saving measures are to take precedence.

A conventional and economic planning by many solid components are an essential contribution to energy saving.

All structural measures, standards and user requirements are kept to the minimum necessary.

Engineering design services for mechanical and electrical installations for buildings

Staatliches Bauamt Schweinfurt | Published November 26, 2016  -  Deadline January 2, 2017

Fachplanung technical equipment (plant Group 4, 5 and 6) by

§ 53-56 HOAI 2013

2, 3, 5, 6, 7, 8

BA extension (new building)

BGF 10 000m 2 without underground; BRI 28 000 m 3 (Without underground car park)

BA remediation historic main building and Rentamt

GFA: 9600 m 2 (Historic main building) + 2 300m 2 (Bursary) = 11 900 m 2

BRI 42 000m 3 (Historic main building) + 8 600m 3 (Bursary) = 50 600 m 3

Cost ceiling 38.1 million EUR (gross).

These costs include the cost group 200-600 DIN 276

Cost group 400: 9600 00 EUR (gross).

Honorary zones:

Investment group 4, 6: II

Investment group 5: II / III

1 HOAI agreed.

The Free State of Bavaria, represented by the State Building Authority Schweinfurt is planning to house the courts and judicial authorities in Schweinfurt the remodeling and expansion of the existing building for Justice Justice Center Schweinfurt.

With the measure, the accommodation of the courts and judicial authorities in Schweinfurt is to be implemented at a site taking into account the current security aspects.

The Justice Center is being built on the site of the former tax office and the current judicial grounds.

For the measure three construction phases (BA) are planned:

BA demolition of a former tax office with underground parking

BA creation of a new building with underground parking (165 spaces) and

BA refurbishment of the listed existing building (historic main building and former accounts office).

For the implementation of the design concept, an architectural competition was conducted.

This requires that all meeting areas for the courts to be accommodated in the new building.

4000 m 2 (NUF 1-6).

The new building is to be designed as energy-efficient building with passive energy saving measures have priority.

  • 1