Call +44 800 9755 164

Public tenders for energy in Poing Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Architectural, construction, engineering and inspection services

Gemeinde Poing | Published June 10, 2016
Winner
DU Diederichs & Partner GmbH
cpvs
71000000

The town Poing, distr. Ebersberg is planning to build a primary school including single and gym

all associated outdoor facilities. In addition, ideas for the surrounding Staßenräume for good design integration are sought. For this purpose, an architectural competition is gem as not open design competition. RPW 2013 performed.

The 3-sized primary school is required to replace the already existing on the site school buildings. The existing building will be completely terminated before the new building.

At school a lunchtime supervision for up to 5 groups and a canteen is provided with output cuisine. The recreation hall is to be designed as an auditorium for a venue use and requisite ancillary spaces and stage. For physical education a single gym is planned.

As outdoor enclosures an action area with playground, sports fields, bike Activate setting and car parking spaces are required. The Pitch planning is necessary to consider the needs of the adjacent Town Hall and the adjacent nursery school with.

The handover of the system to the user is provided before the start of the school year 2019/2020.

The building of the primary school should be designed so that high energy levels can be achieved.

The measure is sponsored by the Free State of Bavaria under the FAG promotion.

Engineering design services

Gemeinde Poing | Published November 20, 2015
Winner
Sailer Stepan und Partner GmbH
cpvs
71320000

The town Poing, Ebersberg, planning to replace the new 3-sized primary school with Ganztageszug and Easy gym at the Karl Sittler Street and all associated outdoor facilities. For this purpose, an architectural competition is conducted. A renovation of the existing building would be because of structural shortcomings and deficiencies under long-term, been an economic point of not purposeful. The existing building will be completely terminated before the new building. And situated in the existing building, disused school swimming pools will not be replaced in the new school, but through a medium term planned elsewhere indoor pool. In school, a lunch-time supervision and a canteen is provided with output cuisine. The teaching area is to be divided into learning clusters. In school, a meeting place and a platform for municipal and civic uses and requisite ancillary spaces to be designed. The building should be designed so that high energy levels can be achieved. The groundwater conditions have to be observed. To strengthen the town center parking spaces are inter alia required that also z. T. can be accommodated in the planning area. As outdoor enclosures an action area with playground, sports fields, a bicycle Activate setting and Recycling island also required. Construction is beginning the second half of 2015. The handover of the system to the user is provided before the beginning of the school year 2019/2020. The measure is funded by the Free State of Bavaria as part of the FAG-promotion.

Engineering design services

Gemeinde Poing | Published November 19, 2015
Winner
PLANPlus Technische Gebäudeplanung GmbH & Co. KG
cpvs
71320000

The town Poing, Ebersberg, planning to replace the new 3-sized primary school with Ganztageszug and Easy gym at the Karl Sittler Street and all associated outdoor facilities. For this purpose, an architectural competition is conducted. A renovation of the existing building would not have been purposeful because of structural shortcomings and deficiencies under long-term economic considerations. The existing building will be completely terminated before the new building. And situated in the existing building, disused school swimming pools will not be replaced in the new school, but through a medium term planned elsewhere indoor pool. In school, a lunch-time supervision for up to 5 groups and a canteen is provided with output cuisine. The school has a Ganztagszug. The teaching area is to be divided into learning clusters. In school, a meeting place and a platform for municipal and civic uses and requisite ancillary spaces to be designed. The building of the primary school should be designed so that high energy levels can be achieved. To strengthen the town center parking spaces are inter alia required that also z. T. can be accommodated in the competition area. As outdoor enclosures an action area with playground, sports fields, a bicycle Activate setting and Recycling island also required. The handover of the system to the user is provided before the beginning of the school year 2019/2020. The measure is funded by the Free State of Bavaria as part of the FAG-promotion.

Engineering design services

Gemeinde Poing, vertreten durch Herrn Bürgermeister Albert Hingerl | Published June 6, 2015  -  Deadline July 3, 2015
cpvs
71320000

The town Poing, Ebersberg, planning to replace the new 3-class primary school with Ganztageszug and Simple gym at the Karl Sittler Street and all its leisure facilities. To this end, an architectural competition is conducted. A renovation of the existing building would not have been purposeful because of structural deficiencies and shortcomings under long-term, economically viable. The existing building will be completely terminated before the new building. And situated in the existing building, disused school swimming pools will not be replaced in the new school, but through a medium term planned elsewhere indoor pool. At school, a lunch-time supervision for up to 5 groups and a canteen is provided with output cuisine. The school has a Ganztagszug. The teaching area is to be divided into learning clusters. At school, a meeting place and a platform for municipal and civic uses and requisite ancillary spaces to be designed. The building of the primary school should be designed so that high energy levels can be achieved. In order to strengthen the town center parking spaces are necessary inter alia to be accommodated also partly in the competition area. As outdoor enclosures an action area with playground, sports fields, a bike-adjusting and Recycling island also required. The handover of the system to the user is provided before the beginning of the school year 2019/2020. The measure is funded by the Free State of Bavaria as part of the FAG-promotion.

Engineering design services

Gemeinde Poing | Published June 6, 2015  -  Deadline July 3, 2015
cpvs
71320000

The town Poing, Ebersberg, planning to replace the new 3-class primary school with Ganztageszug and Simple gym at the Karl Sittler Street and all its leisure facilities. To this end, an architectural competition is conducted. A renovation of the existing building would not have been purposeful because of structural deficiencies and shortcomings under long-term, economically viable. The existing building will be completely terminated before the new building. And situated in the existing building, disused school swimming pools will not be replaced in the new school, but through a medium term planned elsewhere indoor pool. At school, a lunch-time supervision and a canteen is provided with output cuisine. The teaching area is to be divided into learning clusters. At school, a meeting place and a platform for municipal and civic uses and requisite ancillary spaces to be designed. The building should be designed so that high energy levels can be achieved. The groundwater conditions must be observed. In order to strengthen the center are required, inter alia, car parking spaces, which are also partly to accommodate the planning area. As outdoor enclosures an action area with playground, sports fields, a bike-adjusting and Recycling island also required. Construction is beginning the second half of 2015. The handover of the system to the user is provided before the beginning of the school year 2019/2020. The measure is funded by the Free State of Bavaria as part of the FAG-promotion.

Architectural services for buildings

Gemeinde Poing | Published June 14, 2016
Winner
Lohrer Hochrein Landschaftsarchitekten und Stadtplaner GmbH
cpvs
71221000, 71222000

The town Poing, distr. Ebersberg is planning to build a primary school including single and gym

all associated outdoor facilities. In addition, ideas for the surrounding Staßenräume for

good design integration wanted. For this purpose, an architectural competition is a not open

Planning Competition acc. RPW 2013 performed.

The 3-sized primary school is required to replace the already existing on the site school buildings.

The existing building will be completely terminated before the new building.

At school a lunchtime supervision for up to 5 groups and a canteen is provided with output cuisine.

The recreation hall is an auditorium for a venue use and requisite ancillary spaces

and stage are designed. For physical education a single gym is planned.

As outdoor enclosures are an action area with playground, sports fields, bike Activate setting and car parking spaces

required. The parking space is also planning the needs of the adjacent Town Hall and the adjacent

Include nursery school with.

The handover of the system to the user is provided before the start of the school year 2019/2020.

The building of the primary school should be designed so that a high-energy standard can be achieved

can.

The measure is sponsored by the Free State of Bavaria under the FAG promotion.

  • 1