Public tenders for energy in Oschersleben Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyGermanyoschersleben

Electricity

Landkreis Börde, Zentrale Vergabestelle | Published November 24, 2015
Winner
E.ON Energie Deutschland GmbH
cpvs
09310000

Power supply for 63 delivery points in the district Borde.

Electricity

Landkreis Börde, Zentrale Vergabestelle | Published July 21, 2015  -  Deadline September 8, 2015
cpvs
09310000

Power supply for 63 delivery points in the district Borde.

Architectural, construction, engineering and inspection services

Landkreis Börde, Zentrale Vergabestelle | Published February 7, 2017  -  Deadline March 6, 2017
cpvs
71000000, 71300000, 71321000

Project planning including structural, physical and fire protection plan, planning of building services and the free system planning for energy and general refurbishment of the sports hall in Erxleben.

Here all the documents for applying for funding from the program are to create "STARK III EAFRD".

A claim for Beau-transfer does not exist.

Here all the documents for applying for funding from the program are to create "STARK III EAFRD".

A claim to commissioning does not exist.

Here all the documents for applying for funding from the program are to create "STARK III EAFRD".

A claim to commissioning does not exist.

Here all the documents for applying for funding from the program are to create "STARK III EAFRD".

A claim to commissioning does not exist.

Architectural, engineering and planning services

Landkreis Börde, Zentrale Vergabestelle | Published October 27, 2016
Winner
Ingenieurbüro Kunhart
cpvs
71240000, 71300000, 71330000

As part of the funding Strong III of Saxony-Anhalt intended the Börde district in the 2nd application period for the Joachim-Elector Gymnasium in Wolmirstedt submitted a funding proposal. Taking into account the already published EAFRD Directive, the Community School is energetically to rehabilitate. The energy refurbishment measures should firstly include the replacement of the existing wooden frame Thermal windows through windows with aluminum frame and multi-scheibenisolierverglasung with a minimum U-value of 0.95 Wm²K and secondly, the renewal and expansion of the existing sun protection devices. Replacing the existing slices in the glass-aluminum facade is provided. Des Weitern are ancillary construction under art trades required. The existing heat generators are to renew. The central domestic hot water supply is to renew and optimize. The existing insulation must be replaced in some areas. The existing heating control (lead room) is optimized. The teaching and administrative offices of the school are to be ventilated by means of decentralized ventilation systems with heat recovery. The emergency lighting system must be replaced. A partial replacement of lamps to energy-efficient LED lighting is provided. The installation of a photovoltaic system is planned as part of the overall concept. The fire alarm system is to be implemented according to the requirements of the fire protection concept. The burglar alarm system and the existing PA system must be adjusted or replaced. The existing technical control system is to be extended or renewed. The planning task and the extent of planning can be modified at any time physically, structurally and temporally by the contracting authority. The project will be realized by means of conveying the middle of the EAFRD program.

Architectural, engineering and planning services

Landkreis Börde, Zentrale Vergabestelle | Published July 23, 2016  -  Deadline August 19, 2016
cpvs
71300000

As part of the funding Strong III of Saxony-Anhalt intended the Börde district in the 2nd application period for the Joachim-Elector Gymnasium in Wolmirstedt submitted a funding proposal. Taking into account the already published EAFRD Directive, the Community School is energetically to rehabilitate. The energy refurbishment measures should firstly include the exchange of pre-existing wooden frame Thermal windows through windows with aluminum frame and multi-scheibenisolierverglasung with a minimum U-value of 0.95 Wm²K and secondly, the renewal and expansion of the existing sun protection devices. Replacing the existing slices in the glass-aluminum facade is provided. Des Weitern are ancillary construction under art trades required. The existing heat generators are to renew. The central domestic hot water supply is to renew and optimize. The existing insulation must be replaced in some areas. The existing heating control (lead room) is optimized. The teaching and administrative offices of the school are to be ventilated by means of decentralized ventilation systems with heat recovery. The emergency lighting system must be replaced. A partial replacement of lamps to energy-efficient LED lighting is provided. The installation of a photovoltaic system is planned as part of the overall concept. The fire alarm system is to be implemented according to the requirements of the fire protection concept. The burglar alarm system and the existing PA system must be adjusted or replaced. The existing technical control system is to be extended or renewed. The planning task and the extent of planning can be modified at any time physically, structurally and temporally by the contracting authority. The project will be realized by means of conveying the middle of the EAFRD program.

  • 1