Call +44 800 9755 164

Public tenders for energy in Neu-ulm Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Electricity

Vertragseinrichtungen der Prospitalia GmbH, Ulm | Published October 11, 2016
Winner
Drewag – Stadtwerke Dresden GmbH
cpvs
09310000, 09123000, 09120000

Delivery of electrical energy and energy in the form of natural gas.

Electricity

Vertragseinrichtungen der Prospitalia GmbH, Ulm | Published April 13, 2016  -  Deadline May 24, 2016
cpvs
09123000, 09120000

Delivery of electrical energy and energy in the form of natural gas.

Electricity

Einkaufsgemeinschaft Strom Neu-Ulm, bestehend aus der Stadt Neu-Ulm und dem Landkreis Neu-Ulm | Published October 30, 2015
Winner
SWU Stadtwerke Ulm/Neu-Ulm GmbH
cpvs
09310000

24-month supply of electricity for various delivery points with a total of about 32 936 MWh.

Electricity

Einkaufsgemeinschaft Strom Neu-Ulm, bestehend aus der Stadt Neu-Ulm und dem Landkreis Neu-Ulm | Published June 27, 2015  -  Deadline August 17, 2015
cpvs
09310000

24-month supply of electricity for different delivery points with a total of about 32 936 MWh.

Construction-site supervision services

SWU Verkehr GmbH | Published July 18, 2015  -  Deadline August 25, 2015
cpvs
71521000

Site supervision energy and driving power.

District-heating plant construction work

Bundesrepublik Deutschland, vertreten durch das BMVg, dieses vertreten durch die Oberfinanzdirektion Karlsruhe – Bundesbau BW, diese vertreten durch das Staatliche Hochbauamt Ulm | Published April 13, 2017  -  Deadline May 18, 2017
cpvs
45251250, 45331000, 45231112, 45251141, 51100000

88630 Pfullendorf, Kasernenstraße 20, Staufer barracks -GBM- pilot geothermal (LEK), plant geothermal energy days.

Engineering services

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Ulm | Published November 6, 2015  -  Deadline December 2, 2015
cpvs
71300000

89075 Ulm, Albert-Einstein-Allee, Ulm, Hochschule OE, replacement construction, engineering services according to Part 4, Section 2 HOAI. The new college building is to be built within the development area "Science Park II / college" in the western part of the Science City on the Upper Eselsberg in Ulm. Obtained and used is the future building of the Departments of Electrical Engineering and Informationstechik, mathematics, natural sciences and economics as well as production technology and production management with their institute for communication technology for automation systems and for power generation and drives. The new building is intended to enable around 140 researchers in a modern, ergonomic teaching and research building with laboratories and electronics or similar with lecture halls, seminar rooms and office space necessary for professors and teachers a constructive work also on the individual institutes and faculties also. Designed in massive construction new buildings is sustainable and energy-efficient plan. The aim is to make optimum use of available resources and characteristics of the building. In particular, internal heat gains and the existing district heating network should be integrated here. Individual technical building research institutions of the University in the field of energy and drive technology must be integrated hydraulically and control technology. The annual primary energy demand for the building must be at least the EnEV 2013 comply with the specified requirement from 01/01/2016 level. In addition, the building envelope to passive house standards must be carried out. Where possible, a Effizienzhaus Plus Standard is sought. At the same time the criteria of the evaluation system Sustainable Building (BNB) to consider and comply with the planning and execution of the measure. Expected eligible costs: KG 410-700000 EUR, KG 420-1100000 EUR, KG 430-1900000 EUR, KG 440-2300000 EUR, KG 450-1500000 EUR, KG 460-300000 EUR. Adv. GBK 35 000 000 EUR.

Architectural, engineering and planning services

Bundesrepublik Deutschland, vertreten durch das BMVg, dieses vertreten durch die Oberfinanzdirektion Karlsruhe – Bundesbau BW, diese vertreten durch das Staatliche Hochbauamt Ulm | Published October 30, 2015
Winner
hochstrasser.architekten
cpvs
71240000

88630 Pfullendorf, Kasernenstr., Staufer barracks -GBM- new Unterkunftsgeb. 53 + 54, architectural services under Part 3 section 1 HOAI. The measure comprises the construction of two identical accommodation buildings in the Staufer barracks in Pfullendorf. According to the user request the planning contract arising on the plot 2 accommodation buildings with 72 rooms and communal areas of functioning. The three-storey building is east-west oriented and full basement. Overall, the building dimensions are each 49 mx 14 m. For technical supply of building the technology and installation facilities are in the basement. There are two identical buildings, is assumed by an object and a case of recurrence. Planning basis is the accommodation standard according to planning aid from June 2012, which provides an accommodation in housing units of two single rooms with shared bathroom and toilet. By the decree of 01.12.2014 changed the accommodation standard. As part of the detailed design of the current planning of the new single standard should be adapted with private sanitary facility. Area per accommodation building: approximately 1 400m². The course of action is carried out according to the guidelines for construction of federal (RBBau). The building regulation treatment of the construction work is carried out acc. § 70 (3). The following deadlines must be met: creation of detailed design to: 5/2016; Start of construction: 6/2016; End of construction expected: 12/2017. Particular emphasis is placed on sustainable and energy-saving construction.

Engineering services

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Ulm | Published April 7, 2016
Winner
ProfessorPfeiferundPartner
cpvs
71300000

The new college building to "II / University Science Park" created within the development area in the west of the Science City on the Upper Eselsberg in Ulm, which is defined as building island by the Master Plan of 2009. The proposed plot is located east of the bestehenen university building at the Albert-Einstein-Allee 55 and is currently used for agriculture. The planned new building will replace the existing premises of the University of Ulm at the Eberhardt-Finck-road in the district Böfingen.

The design of the building is its environment and function adequately. The cube is designed as masonry and emphasizes with its clear, closed mold the autonomy of the university. Generous openings mark the entrances and set the reference is to the surrounding landscape (design idea VBV Office Ulm).

The building is planned in parallel with the Albert-Einstein-Allee as a compact, three-storey building in which the lecture halls and laboratory areas are grouped around landscaped courtyards. The overall dimensions of the building are approximately 60 x 60 m.

The selection of the supporting structure must be carried out in a sustainable and energy-optimized design. The building has a basement about 60%, which completely looking out the south facade of the lower floor of the premises due to the topography. On the roof surfaces for photovoltaic systems and other research projects are considered.

Mechanical and electromagnetic influences by the configured in the immediately adjacent Albert-Einstein-Allee 2 Staßenbahnlinie are reasonably excluded by selecting a suitable support system.

It is planned to realize a building according to the rating system Sustainable Building (BNB).

The currently vorraussichtlichen total construction costs amount to about 35 000 000 EUR.

Engineering services

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Ulm | Published November 6, 2015  -  Deadline December 3, 2015
cpvs
71300000

The new college building to "II / University Science Park" created within the development area in the western part of the Science City on the Upper Eselsberg in Ulm, which is defined as a building island by the Master Plan of 2009. The planned building plot is located to the east of your existing information building of the University at the Albert-Einstein-Allee 55 and is currently used for agricultural purposes. The planned new building will replace the existing premises of the University of Ulm at the Eberhardt-Finckh Street in the district Böfingen. The design of the building is its location and function adequately. The cube is designed as a solid construction and underlines with its clear, closed mold the autonomy of the university. Generous openings mark the entrances and set the reference is to the surrounding landscape (design idea VBV Office Ulm). The building is planned in parallel with the Albert-Einstein-Allee as a compact, three-storey building, where the classrooms and laboratory areas are grouped around landscaped courtyards. The overall dimensions of the building are approximately 60 x 60 m. The selection of the supporting structure must be carried out in a sustainable and energy-optimized design. The building has a basement about 60%, which fully looking out the south facade of the lower floor of the site due to the topography. On the roof surfaces for photovoltaic systems and other research projects have to be considered. Mechanical and electromagnetic influences by the configured in the immediately adjacent Albert-Einstein-Allee Staßenbahnlinie 2 are excluded as far as possible by selecting a suitable support system. It is planned to realize a building according to the rating system Sustainable Building (BNB). The total construction costs currently vorraussichtlichen be about 35 000 000 EUR.

Architectural, engineering and planning services

Bundesrepublik Deutschland, vertreten durch das BMVg, dieses vertreten durch die Oberfinanzdirektion Karlsruhe – Bundesbau BW, diese vertreten durch das Staatliche Hochbauamt Ulm | Published November 6, 2015  -  Deadline December 7, 2015
cpvs
71240000

In the Bundeswehr estate Wilhelmsburg barracks Ulm is currently the GA Make Kieback & Peter installed. The condition of the building automation system is good, but does not meet the Handbvuch GA Bundeswehr, service and spare parts is guaranteed for the next few years. As part of 4 major new construction projects a complete renovation of the GA was contemplated. For this purpose, a GA-concept was created. As a result is a complete renovation within the next 10 years. The renovation of the building automation system is to be subjected to competition. The competition must take place in the coming year (2016) to provide for the new buildings (built 2016-2018) time the zukünftie GA Make available. Building on the GA concept is to create a pre- and design and implementation planning for the entire property. The specifications of the property Energy Concept (LEK) are to be integrated. The GA concept comprises a total of 39 buildings with 38 ISP (information centers) and 7075 physics. Data points. The design and manufacturing schedules to be created includes the island center and the GA for 8 other buildings. Deviating from manual building automation a framework contract-LV is created for the entire property that contains real mass information. In addition, the GA-plans of the 4 new buildings are to be integrated into the framework contract LV. This makes it possible to estimate the total cost of reorganization and GA to achieve a realistic competition. The framework contract LV should have a term of 10 years. Price increase clauses are to be integrated. After inventing the future GA manufacturer's island headquarters, as well as the GA for another 8 buildings commissioned from the master contract-LV. The island's central build turnkey until mid 2017th The GA-remediation of further 8 building completed by the end of 2018. The rehabilitation of all remaining GA building is not fixed in time and also not part of this VOF method.

Architectural, engineering and planning services

Bundesrepublik Deutschland, vertreten durch das BMVg, dieses vertreten durch die Oberfinanzdirektion Karlsruhe – Bundesbau BW, diese vertreten durch das Staatliche Hochbauamt Ulm | Published August 8, 2015  -  Deadline September 7, 2015
cpvs
71240000

88630 Pfullendorf, Kasernenstr., Staufer barracks -GBM- new Unterkunftsgeb. 53 + 54, architectural services under Part 3 section 1 HOAI. The measure comprises the construction of two identical accommodation buildings in the Staufer barracks in Pfullendorf. According to the user request the planning contract arising on the property two accommodation buildings, each with 72 rooms and communal areas of functioning. The three-storey building is east-west oriented and full basement. Overall, the building dimensions are each 49 mx 14 m. For technical supply of building the technology and installation facilities are in the basement. There are two identical buildings, it must be from an object and a case of recurrence. Planning basis forms of accommodation standard according to planning aid from June 2012, which provides an accommodation in housing units of 2 single rooms with shared bathroom and toilet. By the decree of 12.01.2014 changed the accommodation standard. As part of the detailed design of the current planning of the new single standard should be adapted with private sanitary facility. Area per accommodation building: approximately 1 400 m2 The course of action is carried out according to the guidelines for construction of federal (RBBau). The building regulation treatment of the construction work is carried out acc. § 70 (3). The following deadlines must be met: creation of detailed design to: 05/2016, construction: 6/2016, end of construction expected: 12/2017. Particular emphasis is placed on sustainable and energy-saving construction.

Engineering services

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Ulm | Published July 4, 2015  -  Deadline July 31, 2015
cpvs
71300000

The intention is the hiring of professional planning services under Part 4 Section 2 HOAI 2013 teaching building for the new medicine "ToTrainU" TTU the University of Ulm. The new energy-efficient teaching building to be built in the Institute area "Universität Ost" on the upper Eselsberg in Ulm. The plot is located next to the research building N27 for biochemical basic research at the James-Franck-Ring and is currently built on a partial area with a parking lot. The property includes the training rooms for students, with the auditorium for 400 people, as well as accommodating the Medical Deanery. In further development of pursued for several years idea individual medical skills ("skills") by practicing on simulators to learn with so-called. Simulation patient or practice models to be built in Ulm a complete workout Hospital. Analogous to the widely varying sectors of activity in a hospital the planned learning areas are divided according to the different medical tasks and requirements in individual teaching modules; At the same time the technical equipment offer the possibility to simulate specific emergency situations that may occur outside of the hospital. The Dean's Office is a service oriented for teaching and research services. Basically met the Dean's Office as the central institution of the Faculty tasks, which go beyond the student and teacher-care and require a high degree of confidentiality. There is an auditorium with about 400 seats (RISING. Stalls) are planned for lectures without experimental character. The current estimated proportionate cost (net) amounted to KG 410: 181 400 EUR, KG 420 272 000 EUR, KG 430 786 000 EUR, KG 440: 514 000 EUR, KG 450 423 000 EUR, KG 460: 121 000 EUR, KG 470 363 000 EUR, KG 480 363 000 EUR. The current estimated total gross construction costs are 14 000 000 EUR. Planned start of planning: 09/2015.

Industrial machinery

Handwerkskammer Ulm | Published January 27, 2016  -  Deadline March 2, 2016
cpvs
42000000

accessories

The tool presetter must be suitable for the tools measuring drilling, milling and turning tools for CNC machines and meet the following basic requirements.

  • 1