Call +44 800 9755 164

Public tenders for energy in Munich Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Awarding a consultancy service in the field of near-surface geothermal and freezing of the soil

Hochschule für Angewandte Wissenschaften München | Published January 5, 2017  -  Deadline January 26, 2017
The University Munich intends to award a consultancy service in the field of near-surface geothermal and freezing of the soil in the research project Erdei memory and shallow geothermal energy.

Electricity

Ausschreibende Stelle: Bayerischer Gemeindetag für Auftraggeber der Strombündelausschreibung „Oberbayern, Oberpfalz, Schwaben, Niederbayern, Ökostrom, öffentliche Auftraggeber“ gemäß Leistungsverzeichnis | Published December 17, 2016  -  Deadline February 8, 2017

Supply of electricity from renewable energy sources for buildings and street lighting outsourcer according Leistungsverzeichnis:

Total: about 8,865,040 kWh / year;

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for the property of the client according to the service directory:

Total: about 505,448 kWh / year;

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for buildings and street lighting outsourcer according Leistungsverzeichnis:

Total: about 7,558,393 kWh / year;

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for the property of the client according to the service directory:

Total: about 434,071 kWh / year;

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for street lighting outsourcer according Leistungsverzeichnis:

Total: about 367,128 kWh / year;

Delivery period: from 01/01/2018 to 31/12/2020.

Electricity

Ausschreibende Stelle: Bayerischer Gemeindetag für Auftraggeber der Strombündelausschreibung „Mittelfranken, Ökostrom, öffentliche Auftraggeber“ gemäß Leistungsverzeichnis | Published December 16, 2016  -  Deadline February 7, 2017

Supply of electricity from renewable energy sources for buildings and street lighting outsourcer according Leistungsverzeichnis:

Total: approximately 30,683,069 kWh / year.

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for the property of the client according to the service directory:

Total: about 4,220,341 kWh / year.

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for buildings and street lighting outsourcer according Leistungsverzeichnis:

Total: approximately 18,244,722 kWh / year.

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for the property of the client according to the service directory:

Total: about 4,336,238 kWh / year.

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for street lighting outsourcer according Leistungsverzeichnis:

Total: about 3,646,453 kWh / year.

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for the property of the client according to the service directory:

Total: about 235,315 kWh / year.

Delivery period: from 01/01/2018 to 31/12/2020.

Architectural and related services

Fraunhofer Gesellschaft zur Förderung der angewandten Forschung e. V. | Published December 24, 2016  -  Deadline January 27, 2017
Creating an application and design and manufacturing schedules and perception of a concept conversation with the funding agencies. 

Honorary zone (§ 35 HOAI): IV, fee rate (§ 35 HOAI): minimum rate.

The planned research projects in RESET are supported by the following 5 areas of work.

* Non-thermal medium-energy electron radiation for environmental and pharmaceutical technology

* Microdisplays & sensors

* Roll-to-roll technologies

* Coating of components

* Medical Applications

1,650 m 2 Usable area (DIN 277, NF 1-6), consisting of classic office use with a meeting room, dayroom, and sanitary facilities, as well as from Technikas, chemical laboratories and a clean room.

Construction phase.

420 m2 for the FEP.

In principle, the Fraunhofer-Gesellschaft attaches great importance to the implementation of an innovative and sustainable building and energy concept.

Engineering services

Fraunhofer Gesellschaft zur Förderung der angewandten Forschung e. V. | Published January 20, 2017  -  Deadline February 21, 2017
Creating an application and design and manufacturing schedules and perception of a concept conversation with the funding agencies. 

Honorary zone (§ 52 HOAI): III, fee rate (§ 52 HOAI): minimum rate.

The planned research projects in RESET are supported by the following 5 areas of work.

* Non-thermal medium-energy electron radiation for environmental and pharmaceutical technology.

* Microdisplays & sensors.

* Roll-to-roll technology.

* Coating of components.

* Medical Applications.

To 1 650 m 2 Usable area (DIN 277, NF 1-6), consisting of classic office use with a meeting room, dayroom, and sanitary facilities, as well as from Technikas, chemical laboratories and a clean room.

Construction phase.

420 m² for the FEP.

In principle, the Fraunhofer-Gesellschaft attaches great importance to the implementation of an innovative and sustainable building and energy concept.

Houses construction work

Gewofag Wohnen GmbH | Published January 5, 2017

Arnulfstraße 21 WA - Arnulfstraße in Munich's Neuhausen - Nymphenburg.

to build New condominium with about 132 subsidized rental apartments (EOF and MMM), a daycare with 3 kindergarten and 2 crèches groups, a tenant center and underground parking. This measure comprises according to development plan total approximately 13 000 m² of floor area. The development plan provides for a U-shape with partially 6 full floors. The necessary according to the usage pitches can be detected in the underground garage.

The buildings must meet the minimum standard of EnEV, 2014. In addition, the energy standard of KfW Efficiency House 70 (EnEV 2014) must be respected. The cost limit is in accordance with current housing assistance determining the Bavarian Sta.

New condominium.

Electricity

Ausschreibende Stelle: Bayerischer Gemeindetag für Auftraggeber der Strombündelausschreibung „Oberfranken, Unterfranken, Ökostrom, öffentliche Auftraggeber“ gemäß Leistungsverzeichnis | Published December 17, 2016  -  Deadline February 9, 2017

Supply of electricity from renewable energy sources for buildings and street lighting outsourcer according Leistungsverzeichnis;

Total: about 3,959,640 kWh / year;

Delivery period: 01/01/2018 to 31/12/2020.

Supply of electricity from renewable sources for the property of the client according to the service directory;

Total: about 1,000,060 kWh / year;

Delivery period: 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for buildings and street lighting outsourcer according Leistungsverzeichnis;

Total: about 682,155 kWh / year;

Delivery period: 01/01/2018 to 31/12/2020.

Supply of electricity from renewable sources for the property of the client according to the service directory;

Total: about 778,970 kWh / year;

Delivery period: 01/01/2018 to 31/12/2020.

Supply of electricity from renewable sources for street lighting outsourcer according Leistungsverzeichnis;

Total: about 1,020,169 kWh / year;

Delivery period: 01/01/2018 to 31/12/2020.

Supply of electricity from renewable sources for the property of the client according to the service directory;

Total: about 478,286 kWh / year;

Delivery period: 01/01/2018 to 31/12/2020.

Engineering services

GWG Städtische Wohnungsgesellschaft München mbH | Published January 4, 2017  -  Deadline February 7, 2017
53 residential units with a common underground parking and daycare in Munich, Karwendelstraße. 39 

2-9, investment group 4 - 5, gradually contracting.

The buildings are in energy efficiency house 55 - implemented standard.

GF for area: 4784 m 2

GF Kita area: 1 008 m 2

Kita-storey) house A and B; 3 storeys House C.

115-127 m 2 arise.

Construction and façade design:

Cellar, stairwell and elevator: reinforced concrete; Structure: Massive construction; bearing walls / columns: reinforced concrete; External walls: monolithic construction with aerated concrete blocks and plaster for interior and exterior of the upper floors, ventilated timber formwork with large windows elements in wood on the ground and Kita;

non-bearing interior walls: drywall, party walls in solid construction; Ceiling: reinforced concrete ceiling surfaces; Facade construction inputs: wood / aluminum-glass elements; Window Kita: wood-aluminum, Housing: Plastic; Balconies as reinforced concrete cantilever slabs with shelter.

Solar thermal energy, drainage Outboard

representational planning Starting immediately after contract conclusion

June 2017

July 2017

August 2018

May 2020th

Painting work

Mietmanagement Heimag GmbH & Co. KG | Published January 21, 2017  -  Deadline February 17, 2017

The maintenance / repair action in connection with energy-efficient modernization measure with the project name "Wastl-Witt-Str. 17-27.

The rental management Heimag GmbH & Co. KG represented by Gewofag Holding GmbH in Munich intends to conduct District Hadern with 2 existing buildings a comprehensive maintenance / repair action in connection with energy-efficient modernization measure. The buildings are owned by the rental management Heimag GmbH & Co. KG. All Mietwohnblöcke are during the operational implementation in full inhabited state.

The project area includes the following buildings:

- Wastl-Witt-Str. 17, 19, 21 with 88 residential units and approximately 6074 m² of living space;

- Wastl-Witt-Str. 23, 25, 27 with 88 residential units and approximately 6074 m².

The buildings are in typical construction time - built in 1964 - construction of solid brick masonry with integrated concrete supports and stiffening components in concrete, concrete ceilings.

Approximately 8 000 m 2 Wall and ceiling surfaces in individual areas from. about 5 m 2 ;

about 7 000m 2 Wall and ceiling surfaces in connection with the mold remediation;

about 5 500 meters 2 Wall and ceiling surfaces in stairwells.

Sanitary fixture installation work

GEWOFAG Wohnen GmbH | Published December 29, 2016  -  Deadline February 7, 2017

New residential building with 66 residential units, a common room and an underground garage for 66

Car as individual Parker, under the conceptual rental housing (KMB).

The living area is 4 738 m 2 , The floor area of ​​6566 m 2 , Including at a gross volume. Underground of 30 001 m 3 ,

The energy standard meets the requirements of KfW70-2009 model. The U-shaped structure has a height development of E + 3 and E +. 4

The flat roofs are green, and include, for residents, usable terraces.

Approximately 950 m sewers with bends, tees, etc .;

about 1 750 meters drinking water pipes with bends, tees, etc .;

300 St. Pipe fittings, etc .;

230 St. sanitary equipment and accessories;

ca. 101 St. install Register with plumbing and ventilation installations;

about 1 St. lifting unit;

about 1 St. limescale.

Engineering services

Innung für Elektro- und Informationstechnik München | Published December 28, 2016  -  Deadline January 25, 2017

The Guild for electrical and information engineering München forgives services Structural engineering LPH 1-6 HOAI §§ 51 and Engineering controls during the performance of the object for the new training center in Munich-Riem.

The project is funded by the Federal Institute for Vocational Education (45%) and the Bavarian Ministry of Economic Affairs and Media, Energy and Technology (30%).

the benefits of structural design are according to the measures. § 51 HOAI and Engineering controls of the object to be charged.

The facilities planning is not part of the order, this will be awarded separately at a specialist's office.

An already approved by the funding provider space and function program is available to the client.

In planning points of ecological criteria catalog of the City of Munich should be observed.

The designed for that purpose and tailored to the requirements of use concept is based on an outline of the workshops and classrooms the following functional areas:

- Reception, course presentation, management, catering supplies;

- Workshops, practical lessons;

- Specialized theoretical lessons;

- Underground car park.

For the plot a supply is provided by district heating.

The cost limit is the basis for the subsequent approval of the grant giver.

The outdoor areas are to be planned according to the specifications of the development plan.

Job search services

Landeshauptstadt München, Direktorium-HA II/Vergabestelle 1, Abt. 2 | Published January 17, 2017  -  Deadline February 20, 2017

. Subject explained below measure according to § 45 para 1 sentence 1 SGB III is a combination of elements for:

- To bring the participants to the general training and labor market (§ 45 para 1 sentence 1 No. 1 SGB III..);

- Determination, reducing or eliminating placement constraints (§ 45 para 1 sentence 1 No. 2 SGB III..);

- Placement in a social security payments (§ 45 para 1 sentence 1 No. 5 SGB III..);

- Stabilization of employment Up (§ 45 para 1 sentence 1 No. 5 SGB III..).

The measure aims with mental health problems to enable clients through intensive individual discussions and individual support face to face to collaborate and attract. The establishment of a working alliance based on mutual trust is essential to reach the subscriber, and to cooperate in the cooperative relationship, and to permanently integrate him. Not the mitigating or even eliminating the psychological abnormality, but sustainable energy absorption despite the psychological deficit target of the action.

The aim of the measure is thus the long-term integration into a social security contributions in order here about bringing about the cessation or the maximum possible reduction in the need for assistance. The contractor has 117 delegate places that are occupied once reproach.

Architectural, construction, engineering and inspection services

Landeshauptstadt München, Baureferat | Published December 21, 2016  -  Deadline January 24, 2017

Project planning according to § 34 HOAI, LPH 5-9, for improving the energy efficiency of 3 rows of terraced houses in Strassfeld, 85386 Eching.

Retrofitting of 3 rows of terraced houses with 17 housing units, year 1989

The condominium was built in reinforced concrete wall construction with prefabricated insulated timber panel elements on the longitudinal sides and insulated wooden roof structure with rafters or purlins roof trusses. The façade is covered with a board and batten cladding.

The reorganization measures mainly include:

Dismantling conservatories and facade, install additional insulation.

Renovation facade in ground cover formwork.

Renewal of conservatories.

Dismantling tile roof, install additional thermal insulation.

Renewal of the tile roof.

Replacement doors and windows.

Dismantling of the welfare institutions in the basement, attaching a basement ceiling insulation and new connection of the supply lines.

Connecting the technical ventilation in existing fireplaces.

Establishment of a central boiler room in existing carport for installation of a CHP.

Conversions in existing electrical room.

The construction project includes the following areas:

BRI 7888 m 3

BGF 926 m 2

NF 1 421 m 2 ,

  • 1