Call +44 800 9755 164

Public tenders for energy in Marburg-an-der-lahn Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyGermanymarburg-an-der-lahn

Energy and related services

Philipps-Universität Marburg | Published December 23, 2016  -  Deadline January 26, 2017
cpvs
71314000, 09000000, 09300000, 65000000, 65400000

Energy supply contracting with modernization of the district heating plant Lahnberge the University of Marburg.

Energy and related services

Philipps-Universität Marburg | Published November 26, 2016  -  Deadline December 23, 2016
cpvs
71314000, 09000000, 09300000, 65000000, 65400000

Energy supply contracting with modernization of the district heating plant Lahnberge the University of Marburg.

Description of the situation: The above mentioned location of the University of Marburg (UMR) is supplied by a heating plant at Lahnberge with heat. The district heating plant (FHW) is operated on its own the UMR. The heat is supplied via an existing district heating network. These district heating lines, the properties of the UMR campus Lahnberge are exclusively connected. Through planned extensions of the heat, the cold and the power requirements of the client would rise, but old buildings are demolished in return, meaning in sum, that energy demand remains roughly the same.

Contract description: The contractor is building for the new base load plant a new building next to the existing district heating plant. For this leaves the UMR to the contractor a parcel with dimensions 33.8 mx 49.0 m, an area of ​​about 1 650 meters 2 equivalent. The base load plant is integrated into the building to be erected and supplies the heat to the district heating duct where the transfer station is located. The supply of heat and the operation of the base load plant should be made by the future contractor.

From a previous energy concept study a 5.5 MW biomass plant emerges as to favorisierende conditioning.

Investments of about 3,000,000 EUR gross (5.5 MW biomass plant; the client does not plan to participate in the investment); Projected heating costs during the contract period: about 1.5 million EUR / year.

EIFS, energy renovation, BImA, KS (VG-0454-2016-1102)

LBIH NL Nord | Published June 23, 2016  -  Deadline July 13, 2016
Winner
E. Burk - Gerüstbau An der Mühle 10 35466 Rabenau Hess.
cpvs

EIFS, energy renovation, BImA, KS (VG-0454-2016-1102)

- Improving the energy efficiency of the overall school Niederwalgern.

Kreisausschuss des Landkreises Marburg-Biedenkopf | Published March 12, 2016  -  Deadline May 3, 2016
cpvs
45331100

The Marburg-Biedenkopf district intends to energy renovation with Passive House components and renewal of the building perform at the comprehensive school Niederwalgern.

The complex comprises 4 storeys and consists of 2 buildings which were built in different phases. Construction period 1972-1978. The parts of the building are connected by a staircase tower.

The complex has a gross floor area 8698 m 2 , BRI 37 855 m 3 u. NGF 7928 m 2 ,

to the stock radiator for improving the energy efficiency, are lacking in heating pipes incl. insulation dismantled and disposed of. New installation of heating distribution, insulation and heaters.

Improving the energy efficiency of the overall school Niederwalgern.

Kreisausschuss des Landkreises Marburg-Biedenkopf | Published March 12, 2016  -  Deadline May 10, 2016
cpvs
45331210

The Marburg-Biedenkopf district intends to carry out an energy renovation with Passive House components and renewal of the building at the comprehensive school Niederwalgern.

The complex comprises 4 storeys and consists of two buildings, which were built in different phases. Construction period 1972-1978. The parts of the building are connected by a staircase tower.

The complex has a gross floor area 8698 m 2 , BRI 37 855 m 3 u. NGF 7928 m 2 ,

For the energy efficiency, the lacking in ventilation technology is replaced. In the outlying classrooms decentralized ventilation units are to be supplied with heat recovery incl. Supply u. Abluftgitter. The inner core of the building is to be supplied by the central ventilation units with heat recovery incl. Ventilation ducts.

Improving the energy efficiency of the overall school Niederwalgern.

Kreisausschuss des Landkreises Marburg-Biedenkopf | Published March 19, 2016  -  Deadline May 17, 2016
cpvs
45311200

The Marburg-Biedenkopf district intends to carry out an energy renovation with Passive House components and renewal of the building at the comprehensive school Niederwalgern.

The complex comprises 4 storeys and consists of 2 buildings, which were built in different phases. Construction period 1972-1978. The parts of the building are connected by a staircase tower.

The complex has a gross floor area 8698 m 2 , BRI 37 855 m 3 u. NGF 7928 m 2 ,

For the renovation electrical installation are to be established.

Petroleum products, fuel, electricity and other sources of energy

LRA Dillingen an der Donau | Published May 8, 2015  -  Deadline June 29, 2015
cpvs
09000000, 09310000, 65310000

Subject of the tender is the supply of electricity (green energy) for various delivery points of the district Dillingen, the Kreiskliniken Dillingen-Wertingen profit organization and the KDL municipal enterprises of the district Dillingen than full power. Delivery period is 1/1/2016, 0:00 clock until 31.12.2017, 24:00 clock.

Heat supply contracting Marburg University, Lahnberge

LBIH Zentrale Vergabe Fulda | Published November 22, 2016  -  Deadline December 23, 2016
cpvs
71314000

Energy supply contracting with modernization of the district heating plant Lahnberge the University of Marburg

Guttering work

Landkreis Marburg-Biedenkopf | Published April 23, 2016
Winner
Schinder Haus- u. Dachpflege GmbH & Co. KG
cpvs
45261320, 45261410

The Marburg-Biedenkopf district intends to energy renovation with Passive House components and renewal of the building perform at the comprehensive school Niederwalgern.

Woodwork

Landkreis Marburg-Bieder | Published April 23, 2016
Winner
Rubner Holzbau GmbH
cpvs
45422100, 44221100, 45212190, 45262100, 45443000

The Marburg-Biedenkopf district intends to energy renovation with Passive House components and renewal of the building perform at the comprehensive school Niederwalgern.

GS Niederwalgern / Rohbauarbeiten BA1_GS Niederwalgern "ESP".

Landkreis Marburg-Bieder | Published March 1, 2016
Winner
RBW Bau GmbH
cpvs
45223220, 45112420, 45233222, 45262210, 45262310

The Marburg-Biedenkopf district intends to carry out an energy renovation with Passive House components and renewal of the building at the comprehensive school Niederwalgern.

Rohbauarbeiten BA1_GS Niederwalgern "ESP".

Landkreis Marburg-Biedenkopf | Published February 23, 2016
Winner
RBW Bau GmbH
cpvs
45223220, 45233222, 45262210, 45262310, 45112420

The Marburg-Biedenkopf intends an energy renovation with Passive House components and renewal of the building at the comprehensive school Niederwalgern durchzuführen.Der building complex comprises 4 storeys and consists of 2 buildings, which were built in different phases. Construction period 1972-1978. The parts of the building are connected by a staircase tower. The complex has a gross floor area 8698 m², BRI 37,855 m³ u. NGF 7,928 m².Für energy rehabilitation structural work, excavation, foundations and paving works are to be established. Rohbauarbeiten KG 300- ca. 310 m³ Fundamentaushub- 80 m Stahlbetonfertigteil- Fundamentbalken- 70m Ortbetonfundamente- approximately 116 m² supplementing Bodenplatte- 270 m² paving u. Plattenbelagsarbeiten- 1 Psch. Various demolition and dismantling work.

Roof insulation work

Kreisausschuss des Landkreises Marburg-Biedenkopf | Published December 1, 2015  -  Deadline January 12, 2016
cpvs
45261410, 45261320

The Marburg-Biedenkopf district intends to energy refurbishment with Passive House components and renewal of the building perform at the comprehensive school Niederwalgern. The complex comprises 4 storeys and consists of two buildings which were built in different phases. Construction period 1972-1978. The building parts are connected by a staircase tower. The complex includes a 698 m2 BGF 8, BRI 37 855 m3 u. NGF 7928 m2. For the energy efficiency is provided a new facade in timber frame construction, insulated with cladding u. Window before the old existing façade to build before the supporting steel framework. During the construction of the new building envelope the existing flat roofs are renovated incl. Roof drainage and upgraded energetically.

Structural shell work

Kreisausschuss des Landkreises Marburg-Biedenkopf | Published October 10, 2015  -  Deadline December 1, 2015
cpvs
45223220, 45112420, 45233222, 45262210, 45262310

The Marburg-Biedenkopf district intends to carry out an energetic renovation with Passive House components and renewal of the building at the comprehensive school Niederwalgern. The complex comprises 4 storeys and consists of two buildings, which were built in different phases. Construction period 1972-1978. The building parts are connected by a staircase tower. The complex includes a 698 m2 BGF 8, BRI 37 855 m3 u. NGF 7928 m2. For the energy efficiency Rohbauarbeiten, excavation, foundation work and paving are erect.

Supply of electricity (green energy) for various delivery points of the district Dillingen, the Kreiskliniken Dillingen-Wertingen.

LRA Dillingen an der Donau | Published March 16, 2016
Winner
Energie Südbayern GmbH
cpvs
09000000, 09310000, 65310000

Supply of electricity (green energy) for various delivery points of the district Dillingen, the Kreiskliniken Dillingen-Wertingen and the

KDL communal enterprises of the district Dillingen than full power (2 year contract); Delivery period 1/1/2016, 0:00 to 31.12.2017, 24:00.

Plumbing and drain-laying work

Kreisausschuss des Landkreises Marburg-Biedenkopf | Published April 19, 2016  -  Deadline June 7, 2016
cpvs
45332000, 45332200, 45332300, 45332400

The Marburg-Biedenkopf district intends to energy renovation with Passive House components and renewal of the building perform at the comprehensive school Niederwalgern.

The complex comprises 4 storeys and consists of 2 buildings which were built in different phases. Construction period 1972-1978. The parts of the building are connected by a staircase tower.

The complex has a gross floor area 8698 m 2 , BRI 37 855 m 3 u. NGF 7928 m 2 ,

For the renovation are canceled from waste water installations, sanitary installations and reassembly of wastewater u. Water plants to provide plumbing.

Engineering services

Philipps-Universität Marburg, Dezernat IV Gebäudemanagement und Technik | Published March 25, 2017  -  Deadline April 21, 2017
cpvs
71300000

OG and its related ventilation, electrical, fire protection and technical media distribution equipment.

In the large rooms is because of the right to energy conservation, a complete reorganization of the building be inevitable.

This also applies to the Café Leonardo ground floor and underground parking.

Meanwhile, the building was a single cultural monument conservation.

OG.

Bauabschnitt proposed reorganization of the sanitary tract runs in 2018th

OG and its related ventilation, electrical, fire protection and technical media distribution equipment.

Further, the ventilation systems at Café Leonardo and in the garage to be renewed.

The operation of the building, either partially or for completion of the action, is the date of each mandatory

Lecture commencement sure to ask.

Possibly. intervention required in these areas should be limited to the semester break.

The execution of the subsequent levels will be established in the context of further ordering and is intended to permit the ES building.

In the area of ​​GLT and MSR technology, the lecture hall is switched to the existing building control.

The energy saving is to provide evidence to program in the BMS system and after

All classrooms are equipped with sensitive measuring systems (CO2 sensors).

The existing plumbing, heating, cooling, ventilation and control technology is to reorganize and adapt to the latest technical state the requirements of restoration.

In Café Leonardo no meals are prepared, but only delivered and distributed.

The existing ventilation system here is completely dismantled and replaced.

Structural shell work

Landkreis Marburg-Biedenkopf | Published April 19, 2017  -  Deadline May 30, 2017
cpvs
45223220, 45262210, 45233222, 45262310, 45262520

Approximately 203 m 3 Foundation excavation;

about 96 m steel precast concrete foundation beam;

about 102 m 2 Supplementary bottom plate tr .;

1 PSCH. . Various demolition and dismantling work in the building;

about 142 m 2 Exposed brickwork;

about 1 psch. Create and Close breakthroughs for building services.

about 1 psch. Concrete repair of various components in the building;

150 m 2 Concrete slabs and concrete paving.

approximately 113 m 2 Supplementary cementitious screed as margins in the basement.

The Marburg-Biedenkopf intends to carry out an energy renovation with Passive House components and renewal of the building at the comprehensive school Niederwalgern.

The complex comprises 4 storeys and consists of two parts, which were built in different phases. Construction period 1972-1978. The parts of the building are connected by a staircase tower.

The complex includes a BGF 8698 m 2 , BRI 37,855 m 3 u. NGF 7928 m 2 ,

Structural work, excavation, foundation work, minor demolition-u are for energy-efficiency improvements. to build dismantling work, fretwork, minor concrete repair work, masonry and paving work.

Supply of electricity for 2015ff. - Green energy - for the county town of Limburg an der Lahn.

Magistrat der Kreisstadt Limburg an der Lahn | Published December 18, 2014
Winner
Energieversorgung Limburg GmbHSte.-Foy-Straße 36Limburg an der Lahn 65549 +49 64312903210 +49 6431290399210
cpvs
09310000

Supply of green power for the county town of Limburg an der Lahn; Delivery over 3 years with the possibility of renewal for 1 year, if the contract is not terminated by either party giving the notice given. The electricity supply contract expires at the latest after 5 years: Start of delivery: 1.1.2015. Divided into 4 lots; approximately 328 delivery points; approximately 3.25 GWh annually.

Plumbing and drain-laying work

Landkreis Marburg-Biedenkopf | Published July 21, 2016
Winner
O. & B. Weigand GmbH & Co. KG
cpvs
45332000, 45332200

The Marburg-Biedenkopf district intends to energy renovation with Passive House components and renewal of the building perform at the comprehensive school Niederwalgern. The complex comprises 4 storeys and consists of 2 buildings which were built in different phases. Construction period 1972-1978. The parts of the building are connected by a staircase tower. The complex has a gross floor area 8698 m², BRI 37,855 m³ u. NGF 7928 m². For the renovation are canceled from waste water installations, sanitary installations and reassembly of wastewater u. Water plants to provide plumbing. 580 m dismantling sewage system Faserzemtenrohren DN 100 to DN 250 acc. TRGS 519 about 980 m dismantling galvanized inventory management incl. Mineral insulation acc. TRGI 521 about 580 m reassembly sewage system u PP iron pipe about 1 120 m reassembly Wassverteillung DN 12 -. DN 65 240 m² wall installation - Dry 90 pcs. Sanitary objects, washstands, urinals, Ausgusbecken and toilet units about 4 pcs. Handicapped - sanitary objects: 2 times washbasins and 2 times WC unit with accessories..