Call +44 800 9755 164

Public tenders for energy in Mainz Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Architectural, engineering and planning services

Stadtverwaltung Mainz Abt. Vergabe und Einkauf | Published January 18, 2017  -  Deadline February 14, 2017

Objektplanung buildings - Energy renovation of cultural home Mainz-Weisenau (KI 3.0 measure) The Kulturheim Weisenau was built in 1949 by the cultural community Mainz-Weisenau e. V.. The complex consists of a two-storey building with a gabled roof at the Friedrich-Ebert-Straße and an adjoining hall building and a sports hall. Downstairs at the Friedrich-Ebert-School is a restaurant with adjoining rooms. On the 1st floor there is a club room, including sections of the hall and gallery in the attic, a caretaker's house and staff quarters. The buildings have been recently modernized 1977th The building is to be energetically renovated and upgraded fire protection. Under the measures, the barrier-free access to the building is to be prepared. The measure is sponsored by the federal government, and the state of Rhineland-Palatinate in part. A neighboring property can eingepla for infrastructural measures in the context of the reorganization measure.

The total cost of the construction project are estimated at around 3 million EUR gross. It is intended the work phases 1 to 9 object planning building HOAI 2013 part to forgive 3 section. 1

A present condition diagnosis and fire protection analysis determine the structural conditions and can be used as part of the further planning as a basis.

The building is to build barrier-free and energy in accordance with the passive house standard.

The appointment is in stages - first to the power stage 4 - and no legal claim on the commissioning of all work phases or power units based on the corresponding model contract.

Since there is a 3.0 KI measure funded by federal and state funds, the guidelines and restrictions contained in the grant and approval notice must be observed.

  • 1