Public tenders for energy in Mainz Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

7200061116 delivery of training systems in the renewable energy incl. Accessories, South Africa

Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH | Published August 1, 2016  -  Deadline August 22, 2016
cpvs

File by the contracting authority: Training Systems Renewable Energy - 7200061116, South Africa

Electricity

Berufsgenossenschaft Holz und Metall | Published January 28, 2016  -  Deadline March 17, 2016
cpvs
09123000

The professional association wood and metal (BGHM) requires natural gas and electricity for their

Real estate and other business premises. It is internally between the administration and the property

Studies differed.

The delivery of the two media is advertised in different lots. Lot 1 includes the supply

electrical energy in various control areas. Lots 2 and 3 contain the gas supply in each

a market area. Part of the supply is to be realized for 1.1.2017. The remaining Abnahmestellen

come to 1.1.2018 to.

Petroleum products, fuel, electricity and other sources of energy

ZDF, Zweites Deutsches Fernsehen, Anstalt des öffentlichen Rechts, HA Rechtemanagement und Zentraleinkauf, Abt. Produktions-, Verwaltungs- und Baueinkauf | Published January 22, 2016
Winner
Fritz Wahr Minerlöle Spedition, Saarbrücken; J. Knittel Söhne Handels GmbH, Fulda; Thelen GmbH & Co. KG, Gustavsburg; Mineralölvertrieb Rhein-Main, Fulda; Mobene GmbH & Co. KG, Hamburg
cpvs
09000000, 09132000, 09134200

Supply of operating gas station with gasoline and diesel fuel. Delivery Carriage by road tankers with the product recognition device "Nomix". Each year, a fuel quantity of approximately 3 000 000 liters of petrol E5 and 1 600 000 liters of diesel fuel is likely to be needed.

Petroleum products, fuel, electricity and other sources of energy

ZDF, Zweites Deutsches Fernsehen, Anstalt des öffentlichen Rechts, HA Rechtemanagement und Zentraleinkauf, Abt. Produktions-, Verwaltungs- und Baueinkauf | Published November 28, 2015  -  Deadline January 8, 2016
cpvs
09000000, 09132000, 09134200

Supply of operating gas station with gasoline and diesel fuel. Delivery Carriage by road tankers with the product recognition device "Nomix". Each year, an amount of fuel of about 3 million liters of petrol E5 and 1.6 million liters of diesel fuel is likely to be needed.

Mudra Kaserne Wiesbaden - consulting services in the implementation of an energy supply contracting process

Land Hessen vertreten durch den Landesbetrieb Bau und Immobilien Hessen (LBIH), Niederlassung Mitte, Zentrale Vergabe | Published November 29, 2016
cpvs
71300000, 71318000

Electricity

Stadtverwaltung Mainz | Published September 22, 2015  -  Deadline October 27, 2015
cpvs
09310000

Supply of electric green energy for various properties of the economic operation Mainz AöR.

Other community, social and personal services

Bundesnetzagentur | Published May 2, 2015
Winner
ressourcenmangel GmbH
cpvs
98000000

Creating movies for a better understanding of the topic "Network expansion and energy policy" for citizens / and media representatives / inside.

Quadrupole for Linear Accelerator MESA.

Johannes Gutenberg-Universität Abt. Finanzen und Beschaffung FIN1 | Published February 16, 2016  -  Deadline May 10, 2016
cpvs
31630000, 31643000

In the context of the Cluster of Excellence PRISMA an energy back winning electron accelerator (MESA) is built at the Institute for Nuclear Physics in Mainz. The accelerator operating with currents up to 10 mA at a maximum energy of up to 155 MeV. He is expected to be completed in 2020, with preliminary tests to be carried out at the 5 MeV beam guidance in the next two years. For this magnetic quadrupoles are required for purposes of beam focusing.

Advice on potential further national or cross-border gas market area integration As well as the associated impact on the gas market.

Bundesnetzagentur für Elektrizität, Gas, Telekommunikation, Post und Eisenbahnen | Published February 17, 2016
cpvs
75131000

For the further development of the German and European natural gas market, it is also in view of the published by ACER paper, "Energy Regulation: A Bridge to 2025" and the on 01/16/2015 Publish Gas Target Models II (GTM II, "target model gas market II") of be increasingly important to strengthen the liquidity of the wholesale markets. Failure to accomplish the liquidity criteria of the GTM II is as a way to further development of trade markets merging of market areas (target model gas market - review and update Annex 6) proposed. Cross-border, European projects could provide further competition, increase liquidity and help boost the security of supply in Germany (and in Europe). Under certain circumstances, such projects could have advantages over national approaches. At the same time they could also be associated with higher economic, legal, technical and organizational barriers. It is therefore important to assess cross-border approaches and national options taking into account aspects of security of supply and to provide in relation to each other. The aim of the report is to derive criteria for the evaluation of national and cross-border market area integrations. In addition, to be discussed on the basis of these criteria, the potentials of other national or cross-border market area integrations and the associated effects on the natural gas market. Further market area internal measures should be analyzed and evaluated. In consideration also aspects of security of supply are to be included. For orientation, the indicators of the target model to gas market serve (Cf. GTM -. Review and update - Annex 3). Finally, the potential of further national or cross-border market area mergers and their impact on the gas market at the current time from a German perspective must be assessed.

Government services

Bundesnetzagentur für Elektrizität, Gas, Telekommunikation, Post und Eisenbahnen | Published May 16, 2015  -  Deadline July 7, 2015
cpvs
75131000

For the further development of the German and European natural gas market, there is also given the published by ACER paper, "Energy Regulation: A Bridge to 2025" and the on 16/01/2015 publish gas Target Models II (GTM II, "target model gas market II") of its increasing importance to strengthen the liquidity of the wholesale markets. Failure to comply with the liquidity criteria of GTM II is as a way to further develop the commercial markets merging of market areas (target model gas market - Review and update Annex 6) proposed. Cross-border, European projects could create further competition, increase liquidity and help boost the security of supply in Germany (and in Europe). Under certain circumstances, such projects could have advantages compared to national approaches. At the same time they could also be associated with higher economic, legal, technical and organizational barriers. It is therefore important to assess cross-border approaches and national options taking into account aspects of security of supply and to provide in relation to each other. The aim of the report is to derive criteria for the evaluation of national and cross-border market area integrations. In addition, to be discussed on the basis of these criteria, the potential of other national or cross-border market area integrations and the related impact on the natural gas market. Further market area internal measures should be analyzed and evaluated. In consideration also aspects of security of supply are to be included. For orientation, the indicators of the target model to gas market serve (Cf. GTM -. Review and update - Annex 3). Finally, the potential of other national or cross-border market area mergers and their impact on the gas market at the current time from a German perspective must be assessed.

Software programming and consultancy services

Landesamt für Umwelt Rheinland-Pfalz | Published August 13, 2016  -  Deadline September 12, 2016
cpvs

The specialized application MIP Promoting Water Management Authority of Rhineland-Palatinate was first taken in 2010. It is a workflow-based web application for planning and allocation of funds. The specialized application covers all conveying relevant technical processes, from application through allocation and disbursement through to proof of use, including the measure carrier, the regional offices of the Structural and Approval Directorates and the Ministry of Environment, Energy, Food and Forestry.

Internet and intranet software development services

Bundesnetzagentur für Elektrizität, Gas, Telekommunikation, Post und Eisenbahnen | Published January 9, 2016
Winner
regiocom GmbH
cpvs
72212220, 72415000

With the present invitation to tender, the implementation of the Market Master Data register (software development, hosting, operation and development) is to take place. The Mastr is a central register for the master data of the systems and players of the energy market, which brings together the regulatory reporting obligations and which is made available to the market as a single data source. With the introduction of the register, the other previously existing regulatory reporting obligations train should be able to be replaced by train from registration in Mastr.

Internet and intranet software development services

Bundesnetzagentur | Published October 10, 2015  -  Deadline December 7, 2015
cpvs
72212220, 72415000

With the present invitation to tender, the implementation of the Market Master Data register (software development, hosting, operation and development) is to take place. The Mastr is a central register for the master data of the systems and players of the energy market, which brings together the regulatory reporting obligations and which is made available to the market as a single data source. With the introduction of the register, the other previously existing regulatory reporting obligations train should be able to be replaced by train from registration in Mastr.

Government services

Bundesnetzagentur | Published April 19, 2017  -  Deadline May 31, 2017
cpvs
75131000

Due to the adjustments of § 22 para. 1 ARegV as part of the revision of the incentive regulatory requirements have increased significantly to the implementation of an international benchmarking of efficiency and thus much more difficult to carry out. Since the capacity of an international efficiency comparison is impaired in the light of changed conditions resulting from the German energy transition also is for the third regulatory period at least in addition to carry out a relative reference network analysis of transmission system operators,

corresponding to the state of science.

Solid fuels

TVM Thermische Verwertung Mainz GmbH | Published April 19, 2016  -  Deadline May 23, 2016
cpvs
09110000, 51130000, 42162000, 42160000

The "Thermal utilization Mainz GmbH" intends a mono sludge incineration plant with energy at the site of the Central WWTP Mainz build.

In the complex are sludges are incinerated from the ZKW Mainz, the sewage treatment plant of the city of Kaiserslautern (dehydrated), the Wastewater Association Lower Selz (AVUS) and externally delivered sewage sludge (dehydrated) and Klärschlammtrockengut.

The sludge is burned energieautark means of a two-stage, stationary fluidized bed combustion. The burner is designed so that by primary measures (two-stage furnace, litigation burner management, structural and / or organizational measures) the formation of emissions is minimized.

The exhaust gases are cleaned with an electrostatic precipitator and a quasi-dry waste gas cleaning (with injection of lime HOK mixture), before they are discharged through a 41 m high chimney into the atmosphere.

The energy produced will be used in the form of electricity and heat for own use of ZKW or fed current surplus quantities into the public grid.

The transposing the required delivery and installation services are advertised in several lots.

The contract of the lot 4, the delivery and installation services for the fluidized bed combustor / boiler system and the steam cycle.

The services also include the commissioning of these systems in cooperation with the auxiliary equipment, the trial operation and documentation of the investment required to implement the project.

Travelling crane

TVM Thermische Verwertung Mainz GmbH | Published April 20, 2016  -  Deadline May 23, 2016
cpvs
42414210

The "Thermal utilization Mainz GmbH" intends a mono sludge incineration plant with energy at the site of the Central WWTP Mainz build.

In the complex are sludges are incinerated from the ZKW Mainz, the sewage treatment plant of the city of Kaiserslautern (dehydrated), the Wastewater Association Lower Selz (AVUS) and externally delivered sewage sludge (dehydrated) and Klärschlammtrockengut.

The sludge is burned energieautark means of a two-stage, stationary fluidized bed combustion. The burner is designed so that by primary measures (two-stage furnace, litigation burner management, structural and / or organizational measures) the formation of emissions is minimized.

The exhaust gases are cleaned with an electrostatic precipitator and a quasi-dry waste gas cleaning (with injection of lime HOK mixture), before they are discharged through a 41 m high chimney into the atmosphere.

The energy produced will be used in the form of electricity and heat for own use of ZKW or fed current surplus quantities into the public grid.

The transposing the required delivery and installation services are advertised in several lots.

The contract of the lot 2 the delivery and installation services are a bridge crane system.

The services also include the commissioning of these systems in cooperation with the auxiliary equipment, the trial operation and documentation of the investment required to implement the project.

Steam turbines

TVM Thermische Verwertung Mainz GmbH | Published April 19, 2016  -  Deadline May 23, 2016
cpvs
42112100

The "Thermal utilization Mainz GmbH" intends a mono sludge incineration plant with energy at the site of the Central WWTP Mainz build.

In the complex are sludges are incinerated from the ZKW Mainz, the sewage treatment plant of the city of Kaiserslautern (dehydrated), the Wastewater Association Lower Selz (AVUS) and externally delivered sewage sludge (dehydrated) and Klärschlammtrockengut.

The sludge is burned energieautark means of a two-stage, stationary fluidized bed combustion. The burner is designed so that by primary measures (two-stage furnace, litigation burner management, structural and / or organizational measures) the formation of emissions is minimized.

The exhaust gases are cleaned with an electrostatic precipitator and a quasi-dry waste gas cleaning (with injection of lime HOK mixture), before they are discharged through a 41 m high chimney into the atmosphere.

The energy produced will be used in the form of electricity and heat for own use of ZKW or fed current surplus quantities into the public grid.

The transposing the required delivery and installation services are advertised in several lots.

Object of the contract this Lot 6, the delivery and installation services are available for a turbogenerator.

The services also include the commissioning of these systems in cooperation with the auxiliary equipment, the trial operation and documentation of the investment required to implement the project.

Desulphurisation plant construction work

TVM Thermische Verwertung Mainz GmbH | Published April 20, 2016  -  Deadline May 23, 2016
cpvs
45253200, 45262610, 42514200

The "Thermal utilization Mainz GmbH" intends a mono sludge incineration plant with energy at the site of the Central WWTP Mainz build.

In the complex are sludges are incinerated from the ZKW Mainz, the sewage treatment plant of the city of Kaiserslautern (dehydrated), the Wastewater Association Lower Selz (AVUS) and externally delivered sewage sludge (dehydrated) and Klärschlammtrockengut.

The sludge is burned energieautark means of a two-stage, stationary fluidized bed combustion. The burner is designed so that by primary measures (two-stage furnace, litigation burner management, structural and / or organizational measures) the formation of emissions is minimized.

The exhaust gases are cleaned with an electrostatic precipitator and a quasi-dry waste gas cleaning (with injection of lime HOK mixture), before they are discharged through a 41 m high chimney into the atmosphere.

The energy produced will be used in the form of electricity and heat for own use of ZKW or fed current surplus quantities into the public grid.

The transposing the required delivery and installation services are advertised in several lots.

The contract of the lot 5, the delivery and installation services are for the emission control system.

The services also include the commissioning of these systems in cooperation with the auxiliary equipment, the trial operation and documentation of the investment required to implement the project.

Sludge-drier installation

TVM Thermische Verwertung Mainz GmbH | Published April 20, 2016  -  Deadline May 23, 2016
cpvs
34951300

The "Thermal utilization Mainz GmbH" intends a mono sludge incineration plant with energy at the site of the Central WWTP Mainz build.

In the complex are sludges are incinerated from the ZKW Mainz, the sewage treatment plant of the city of Kaiserslautern (dehydrated), the Wastewater Association Lower Selz (AVUS) and externally delivered sewage sludge (dehydrated) and Klärschlammtrockengut.

The sludge is burned energieautark means of a two-stage, stationary fluidized bed combustion. The burner is designed so that by primary measures (two-stage furnace, litigation burner management, structural and / or organizational measures) the formation of emissions is minimized.

The exhaust gases are cleaned with an electrostatic precipitator and a quasi-dry waste gas cleaning (with injection of lime HOK mixture), before they are discharged through a 41 m high chimney into the atmosphere.

The energy produced will be used in the form of electricity and heat for own use of ZKW or fed current surplus quantities into the public grid.

The transposing the required delivery and installation services are advertised in several lots.

The contract of the lot 3, the delivery and installation services for a sludge drying and vapor condensation.

The services also include the commissioning of these systems in cooperation with the auxiliary equipment, the trial operation and documentation of the investment required to implement the project.

Steam turbines

TVM Technische Verwertung Mainz GmbH | Published January 18, 2017
cpvs
42112100

The "Thermal utilization Mainz GmbH" intends a mono sludge incineration plant with energy at the site of the Central WWTP Mainz build.

In the complex are sludges are incinerated from the ZKW Mainz, the sewage treatment plant of the city of Kaiserslautern (dehydrated), the Wastewater Association Lower Selz (AVUS) and externally delivered sewage sludge (dehydrated) and Klärschlammtrockengut.

The sludge is burned energieautark means of a two-stage, stationary fluidized bed combustion. The burner is designed so that by primary measures (two-stage furnace, litigation burner management, structural and / or organizational measures) the formation of emissions is minimized.

The contract of lot 6, the delivery and installation services are available for a turbogenerator.