Call +44 800 9755 164

Public tenders for energy in Laufach Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Architectural and related services

Gemeinde Laufach, vertreten durch Bürgermeister Herr Friedrich Fleckenstein | Published October 31, 2015
Winner
Lengfeld + Wilisch Architekten
cpvs
71200000

The municipality plans to build a new Laufach fire station with 7 plots in Laufach, together with a town hall extension. The new fire station is to be built at the same location as the stock. The demolition of the best. Firehouse done separately. As a basis for decision, a feasibility study was carried out planning services according to HOAI were not listed. The future fire station should be included 7 pitches great. All the necessary functions and utility rooms in accordance with DIN. The town hall extension with 350 m2 of floor space is to connect both buildings functionally and structurally to each other and adjacent office space as a synergistic effect also shared spaces such. B. contained classroom for firefighters and boardroom for the community. The overall budget is currently estimated at about 4 million EUR gross (KGR 200-700 DIN 276, without land costs): The following criteria are particularly relevant for the new building: - functionality / readiness firefighters; - Profitability; - Low maintenance costs; - Accessibility; - Energy-optimized, energy-efficient construction; - Modern, compact, attractive architectural design. Futures Foresight: - Project start immediately after completion VOF / Preliminary design for 3rd quarter 2015; - Filing planning application in December 2015; - Construction of spring 2016; - Completion autumn 2017; - Construction period 1.5 years.

Architectural and related services

Gemeinde Laufach, vertreten durch Bürgermeister Herr Friedrich Fleckenstein | Published July 1, 2015  -  Deadline July 28, 2015
cpvs
71200000

The municipality is planning to build a Laufach fire station with 7 parking spaces in Laufach, together with a town hall extension. The new fire station is to be built on the same site as the inventory. The demolition of the best. Fire Station carried out separately. As a basis for decision, a feasibility study was carried out, planning services according to HOAI were not listed. The future fire station should be included 7 pitches great. All the necessary functions and utility rooms in accordance with DIN. The town hall extension with 350 m2 of floor space is to connect both buildings functionally and structurally with each other and next to office space as a synergy effect also shared spaces such. B. contained classroom for firefighters and boardroom for the community. The overall budget is currently estimated at about 4 million EUR gross (KGR 200-700 DIN 276, without land costs): The following criteria are particularly relevant for the new building: - functionality / readiness firefighters, - profitability, - low maintenance costs - Accessibility , - Energy-optimized, energy-efficient construction, - modern, compact, attractive architectural design. Appointment Foresight: - Project start immediately after completion VOF / Preliminary design for 3rd quarter 2015 - Submission planning application in December 2015, - Construction Spring 2016 - completion autumn 2017 - construction period 1.5 years.
  • 1