Architectural and related services

Markt Willanzheim | Published December 5, 2015  -  Deadline January 7, 2016
cpvs
71200000

The market town Willanzheim plans to remodel the existing primary school and expand. The extension is in addition to two classrooms, include a group room, a multipurpose room, a space for the open day care, a small kitchen and utility rooms. Already present planning results of Phases 1 and 2 will be the basis for further planning. Task form also assist with the preparation of the grant application to the government of Lower Franconia and the Participation in the preparation of the used list. Architectural services (Building design) the following criteria: - functionality; - Economy; - Maintenance costs; - Energy efficiency; - Accessibility. During construction, no use of the school is provided. Total cost estimated at about 2.5 million EUR gross (KGR 200-700 DIN 276). Futures Foresight: - Project start early in 2016; - Building permit / application for funding before the summer recess 2016; - Planned construction autumn 2016; - Construction period approximately 1 year.

Architectural and related services

Markt Willanzheim | Published May 4, 2016
Winner
Konopatzki & Edelhäuser Architekten und Beratende Ingenieure GmbH
cpvs
71200000

The market town Willanzheim plans to convert the existing primary school and to expand. The extension is in addition to two classrooms, include a group room, a multipurpose room, a space for the open day care, a small kitchen and utility rooms.

already present planning results of Phases 1 and 2 will be the basis for further planning.

Task form also assist with the preparation of the grant application in the government of Lower Franconia and assist with the preparation of the used list.

Architectural services (Facility Planning Building) the following criteria:

- Functionality;

- Economics;

- Maintenance costs;

- Energy efficiency;

- Accessibility.

During construction, no use of the school is provided.

Total cost is estimated at about 2.5 million EUR gross (KGR 200-700 DIN 276)

Appointment Foresight:

- Project start early in 2016;

- Building permit / grant application before the summer recess 2016;

- Planned construction Autumn 2016;

- Construction period approximately 1 year.