Call +44 800 9755 164

Public tenders for energy in Hamburg Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Research, Development and Supply of 1 High-energy-pulsed high-average-power diffraction-limited laser amplifiers (HEP HAP DiLiLA)

Deutsches Elektronen- Synchrotron DESY in der Helmholtz Gemeinschaft | Published June 18, 2016
Winner
MAGiC Laser Technologies
cpvs
42990000, 38000000

Research, Development and Supply of 1 High-energy-pulsed high-average-power diffraction-limited laser amplifiers (HEP HAP DiLiLA).

Energy and related services

Hamburger Stadtentwässerung AöR | Published January 8, 2015
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>Hamburg Energie GMBH</OFFICIALNAME></ORGANISATION><ADDRESS>Billhorner Deich 2</ADDRESS><TOWN>Hamburg</TOWN><POSTAL_CODE>20539</POSTAL_CODE><COUNTRY VALUE="DE"/></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
71314000

The Shopping Community Hamburg Harbour Werke GmbH, Hamburg water ipc, Bäderland Hamburg GmbH and ice rink Hamburg (Sprinkenhof AG) intends a contract for the energy sector cooperation - tender and balancing Netznutzungsmanagement-. The buying group is represented by the Hamburg water ipc. The duration of the framework contract is 3 years. The contract includes, for example, change processes, such as logging on and off the network operators, network utilization management and market communication, balancing group management, billing, data preparation, counseling and preparation of energy data.

Energy meters

Stromnetz Hamburg GmbH | Published May 11, 2017  -  Deadline May 26, 2017
cpvs
38551000, 38550000

Framework contract for the supply of modern measuring devices in the form of eHZ acc. "TB-0104" V1.1 and "FNN-Load Stft Basic Counter - Functional Features" V1.3

(Available at: https://shop.vde.com/en/fnn-hinweis-lastenheft-basisz%5%Affhler-funktionale-merkmale-3)

Procurement of traction power incl. Balancing energy in the 16.7 Hz / 110kV traction network of DB Energie 2017 ff. By a particular supplier.

BeNEX GmbH | Published February 25, 2016
cpvs
09310000

Procurement of traction power incl. Balancing energy in the 16.7 Hz / 110kV traction network of DB Energie 2017 ff. By a particular supplier.

Wind-energy generators

EnBW Energie Baden-Württemberg AG | Published June 18, 2016  -  Deadline June 30, 2016
cpvs
31121300, 45262210, 31121320, 31121330, 45251160, 51133000, 45255120, 45255410, 45262421, 45262424, 45262426

Turnkey planning (incl. Project certification / Project Certification), manufacture, supply, transportation, installation, commissioning, trial operation and Documentation for up to 19 wind turbines on monopile. (On the location of variants defined by the client) and associated offshore substation on monopole including wind farm SCADA , service / maintenance contract and Grid code compliance for Kombinationslos.

The final award of the contract is dependent inter alia on the legal framework, permits and grid connection. The contract is for the 2016th

Construction offshore must under approval in Q2 2018 take place. The completion expected by the end of 2019 at the latest.

The handover of certified planning documents (WTG / FOU) to 2. BSH release (acc. Approval) to EnBW AG must be made by 11.01.2016.

Energy and related services

IBA Hamburg GmbH | Published May 9, 2015
Winner
Hamburg Energie GmbH
cpvs
71314000

Service concession for heat supply for a branch of the newly constructed district Fischbeker Heidbrook in Hamburg-Neugraben. Construction and operation of plants for heat supply and heat free delivery. Max. Heat demand ca. 4500 MWh / a. In adherence to set economic and ecological criteria is under consideration of boundary conditions choice for various technical alternatives for heat generation (Variant Restricted procedure).

Petroleum products, fuel, electricity and other sources of energy

DAK – Gesundheit | Published December 31, 2015
Winner
Stadtwerke Gießen
cpvs
09000000, 09300000, 09310000

The contractor supplies the bodies of the DAK health with electricity.

Petroleum products, fuel, electricity and other sources of energy

DAK-Gesundheit | Published August 25, 2015  -  Deadline September 30, 2015
cpvs
09000000, 09300000, 09310000

The contractor supplying the bodies of the DAK health with electricity. The contract will be tendered separately into 3 lots.

Electricity

BeNEX GmbH | Published July 18, 2015  -  Deadline July 30, 2015
cpvs
09310000, 65500000

Framework agreement for the purchase of traction current in full supply including balancing energy in the 16.7-Hz / 110 kV traction current network of DB Energie 2016 ff bandwidths of energy requirements of business:.. The energy requirements are spread relative to the BeNEX and the companies referred to in Annex A in amount and number as follows: 15-25 GWh - 2 companies (Cantus, nordbahn), 25-40 GWh - 1 Company (agilis). It results from a requirement of approximately 55 GWh to 90 GWh per year.

Electricity

BeNEX GmbH | Published February 15, 2017
cpvs
09310000

Procurement of traction power incl. Balancing energy in the 16.7 Hz / 110kV traction network of DB Energie 2017 ff by a particular supplier.

Petroleum products, fuel, electricity and other sources of energy

DAK-Gesundheit | Published October 2, 2015  -  Deadline October 12, 2015
cpvs
09000000, 09300000, 09310000

Mineralölerzeugnisse, Brennstoff, Elektrizität und andere Energiequellen

Petroleum products, fuel, electricity and other sources of energy

DAK-Gesundheit | Published September 23, 2015  -  Deadline October 5, 2015
cpvs
09000000, 09300000, 09310000

Mineralölerzeugnisse, Brennstoff, Elektrizität und andere Energiequellen

EO 020-15 — PETRA III Extension Design, manufacture, delivery, installation, and briefing of one non-magnetic diffractometer.

Deutsches Elektronen-Synchrotron DESY | Published October 29, 2015  -  Deadline December 14, 2015
cpvs
38430000

DESY is inviting tenders for a non-magnetic diffractometer to be used with a high field magnet of up to 14 T. The requested diffractometer consists of a sample- and a detector stage. The Swedish beamline, P21, located at the PETRA III extension, will accommodate a side-station for high energy x-ray diffraction at energies of 52, 85 and 100 keV. The exceptional beam quality and stability at the sample position of the experimental station require a highly precise and stable orientation of the sample and of the whole diffractometer setup.

EO 020-15 — PETRA III EXTENSION Design, manufacture, delivery, installation, and briefing of 1 non-magnetic diffractometer.

Deutsches Elektronen-Synchrotron DESY | Published March 11, 2016
Winner
Huber Diffraktionstechnik GmbH &amp; Co. KG
cpvs
38430000

DESY is inviting tenders for a non-magnetic diffractometer to be used with a high field magnet of

up to 14 T. The requested diffractometer consists of a sample- and a detector stage.

The Swedish beamline, P21, located at the PETRA III extension, will accommodate a sidesta-

tion for high energy x-ray diffraction at energies of 52, 85 and 100 keV. The exceptional beam

quality and stability at the sample position of the experimental station require a highly precise and

stable orientation of the sample and of the whole diffractometer setup.

Electricity

Hamburg Verkehrsanlagen GmbH | Published August 26, 2015
Winner
envia Mitteldeutsche Energie AG
cpvs
09310000, 65310000

Supply of electricity, in the form of a full electricity supply including power usage, from renewable energy sources (green power) at all points of use by the client. The expected electricity supply needs in 2016 is about 40 GWh, in 2017 approximately 38.5 GWh and in 2018 approximately 37 GWh.

EO 015-15 XFEL: Manufacture and supply of 4 units Beam dump power supplies for the European XFEL.

Deutsche Elektronen-Synchrotron DESY | Published August 29, 2015
Winner
EEI S.p.A
cpvs
31174000

A beam dump power supply consists of an input stage e.g. active front end with circuit breaker and contactor, a DC-link capacitor bank and three bipolar output stages with filters, measurement and redundancy/grounding switches. The output stages have to be bipolar with H-bridge design. The magnetic fields of the beam dump magnets are perpendicular to each other. By this the beam can be steered in a circular Lissajous curve. The magnet sinusoidal currents have a phase shift of 90°. Fig. 1 shows the principle schematic. The inverter plus filter and measurement is called power supply (PS). Inverter 1 corresponds to power supply 1 (PS_1) etc. The input is connected to the 400 V mains. It charges the DC link capacitor with constant power. The capacitor bank has to provide the energy for bipolar PS that supply the dump magnets with alternating sinusoidal currents. During the rising slope of the magnet current, the DC link will supply energy for the magnet. On the falling slope of the magnet current; the energy will be fed back into the DC link. The capacitance has to be chosen to more than 5 F in order to keep the voltage variation small. The capacitor current and voltage have to be measured. For the operation of the beam dump supply, two PS will be active and will feed the magnet loads. In case of a failure the broken PS will be disconnected from the load and the third PS will be switched onto the magnet and activated. The switches are called redundancy switches. They will contain also a grounding switch that short circuits the output of the supply to ground to allow save work at the magnets. Nominal output current: +/- 140 A Nominal output voltage: +/- 130 V Operation frequency of magnet current 0.3 to 0.4 Hz Adjustable frequency steps 0.01 Hz Output ripple max at PWM frequency: 1.0 V pp Other frequencies < 0.1 V for higher frequencies see EMC Standards Power input voltage 400 V 3~ +/- 10 %, 50 Hz Auxiliary supply voltage: 400 V 3~+neutral and PE +/- 10 %, 50 Hz, with CEE connector Output ripple frequency > 22 kHz Insulation voltage of the power part to ground: 2.5 kVrms Insulation resistance to ground: > 10 M Ambient temperature: 10 — 50 °C MTBF >70 000 hrs.

EO 015-15 XFEL: Manufacture and supply of 4 units Beam dump power supplies for the European XFEL.

Deutsche Elektronen-Synchrotron DESY | Published May 15, 2015  -  Deadline June 30, 2015
cpvs
31174000

A beam dump power supply consists of an input stage e.g. active front end with circuit breaker and contractor, a DC-link capacitor bank and 3 bipolar output stages with filters, measurement and redundancy/grounding switches. The output stages have to be bipolar with H-bridge design. The magnetic fields of the beam dump magnets are perpendicular to each other. By this the beam can be steered in a circular Lissajous curve. The magnet sinusoidal currents have a phase shift of 90°. Fig. 1 shows the principle schematic. The inverter plus filter and measurement is called power supply (PS). Inverter 1 corresponds to power supply 1 (PS_1) etc. The input is connected to the 400 V mains. It charges the DC link capacitor with constant power. The capacitor bank has to provide the energy for bipolar PS that supply the dump magnets with alternating sinusoidal currents. During the rising slope of the magnet current, the DC link will supply energy for the magnet. On the falling slope of the magnet current; the energy will be fed back into the DC link. The capacitance has to be chosen to more than 5 F in order to keep the voltage variation small. The capacitor current and voltage have to be measured. For the operation of the beam dump supply, 2 PS will be active and will feed the magnet loads. In case of a failure the broken PS will be disconnected from the load and the third PS will be switched onto the magnet and activated. The switches are called redundancy switches. They will contain also a grounding switch that short circuits the output of the supply to ground to allow save work at the magnets. Nominal output current: +/- 140 A Nominal output voltage: +/- 130 V Operation frequency of magnet current 0.3 to 0.4 Hz Adjustable frequency steps 0.01 Hz Output ripple max at PWM frequency: 1.0 V pp Other frequencies < 0.1 V for higher frequencies see EMC Standards Power input voltage 400 V 3~ +/- 10 %, 50 Hz Auxiliary supply voltage: 400 V 3~+neutral and PE +/- 10 %, 50 Hz, with CEE connector Output ripple frequency > 22 kHz Insulation voltage of the power part to ground: 2.5 kVrms Insulation resistance to ground: > 10 M Ambient temperature: 10 – 50 °C MTBF >70 000 hrs.

Energy-saving renovation of the high school - Special inception in 39606 Hansestadt Osterburg

Landkreis Stendal Hochbauamt und Gebäudemanagement/Vergabestelle | Published March 30, 2017  -  Deadline April 26, 2017
cpvs

Optics for PP-laser production systems.

European X-Ray Free-Electron Laser Facility GmbH | Published February 18, 2016
Winner
Layertec GmbH
cpvs
38600000

The European XFEL GmbH will commence installation of 3 high power optical lasers and 6 subsequent optical beam lines to experimental end-stations in 2016. Installation and full commissioning will require up to 3 years. At 1 030nm and 515nm, these lasers will emit millisecond-long bursts of pulses with up to 50mJ single pulse energy. Pulses have a duration ranging from 800fs to 1/2 a ns and occur with repetition rates between 0-5MHz within the burst. At 800nm, similar conditions prevail with single pulse energies up to 5mJ and pulse durations as short as 10fs. This contract is for the equipment of the actual laser systems and the according beam lines with suited laser optics. The scope of supply comprises the manufacturing, testing, documentation, packaging and delivery of optics (Conversion 800 nm; Conversion 1 030 nm) for the laser systems and beam lines.

Switching station installation work

Hamburger Hochbahn AG | Published March 31, 2017
cpvs
45315700, 45315400, 45315300

Qualification System "Energy Technical plant design and construction substations".