Call +44 800 9755 164

Public tenders for energy in Halle-saale Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyGermanyhalle-saale

Energy-efficient renovation of heat supply

ST_ZooHalle | Published April 10, 2017  -  Deadline May 12, 2017
cpvs

Lieferun of electronic energy and gas

Sachsen-Anhalt Oebisfelde-Weferlingen | Published September 24, 2016  -  Deadline October 26, 2016
cpvs

Electricity

Leibniz-Institut für Pflanzenbiochemie (IPB) | Published October 31, 2015
Winner
EVH GmbH
cpvs
09310000

Supply of 100% green electricity in the form of three-phase at a frequency of 50 Hz to 2 delivery points of the client in the period: 1.1.2016-31.12.2017. The annual consumption is estimated at around 5.1 million kWh in the future. In addition: pricing on the stock exchange after the auction date.

Electricity

Leibniz-Institut für Pflanzenbiochemie (IPB) | Published September 1, 2015  -  Deadline October 13, 2015
cpvs
09310000

Supply of 100% green electricity in the form of three-phase at a frequency of 50 Hz to 2 delivery points of the client in the period: 1.1.2016-31.12.2017. The annual consumption is estimated at around 5.1 million kWh in the future. In addition: pricing on the stock exchange after the auction date.

Implementing energy audit according to DIN EN 16247-1

Land NRW | Published June 16, 2015  -  Deadline June 24, 2015
cpvs

Durchführung Energieaudit nach DIN EN 16247-1

Laboratory, optical and precision equipments (excl. glasses)

Martin-Luther-Universität Halle-Wittenberg, Abt. 4 Referat 4.3. – Bauangelegenheiten | Published September 27, 2016  -  Deadline October 25, 2016
cpvs
38000000

The new junior research group "light for the high-voltage photovoltaic" ( "Light for high-voltage photovoltaics") invites you to do for the procurement of a system for pulsed laser deposition (PLD), which with a device for the in situ high-energy -Reflexions electron diffraction (RHEED) is to be coupled.

BLB D / Dusseldorf / Ministry of Economy, Energy, Building, Housing and Transport: GLT modernization - 065-15-00721

BLB NRW Düsseldorf | Published August 6, 2015
cpvs

BLB D/Düsseldorf/Ministerium für Wirtschaft, Energie, Bauen, Wohnen und Verkehr: GLT-Modernisierung - 065-15-00721

Occupational health and safety services in the Ministry of Economy, Energy, Industry, Trade and Crafts of North Rhine-Westphalia (MWEIMH)

 | Published October 6, 2014  -  Deadline October 29, 2014
cpvs

Arbeitsmedizinische und sicherheitstechnische Betreuung im Ministerium für Wirtschaft, Energie, Industrie, Mittelstand und Handwerk des Landes Nordrhein-Westfalen (MWEIMH)

BLB D / Dusseldorf / Ministry of Economy, Energy, Industry, SMEs and craft NRW: Air conditioning server room - 065-14-01207

 | Published December 9, 2014  -  Deadline January 13, 2015
cpvs

BLB D/Düsseldorf/Ministerium für Wirtschaft, Energie, Industrie, Mittelstand und Handwerk NRW: Klimatisierung Serverraum - 065-14-01207

Architectural services for buildings

Stadt Halle (Saale), Rechtsamt, Zentrale Vergabestelle Team VOL | Published September 23, 2015  -  Deadline October 19, 2015
cpvs
71221000

Renovation Primary School Glaucha Already in 2012 the City Council of the City of Halle (Saale) decided due to the increasing numbers of children in the urban area Glaucha that the former school building of Glauchaschule to be taken in the Heinrich-Pera-Straße 13 back into operation. Before use as a school building, the object must be fully sanieret. The requirements of fire safety, accessibility, heritage protection and energy requirements must be met in accordance with current regulations. For this purpose, the project in the investment plan of the city of Halle (Saale) was taken and should therefore be financed from own resources. It is envisaged that a 3-sized primary school and a nursery are housed in the building. For this renovation project construction costs amounting to 5.3 million EUR are gross estimates including incidental costs. Subject of the tendered contract are services the planning stage of the power phases 5 to 9 in accordance with § 34 HOAI 2013. Optional be gradually commissioned the work phases, the phases are commissioned 5-7 in the first step.

Instruments for checking physical characteristics

Max-Planck-Gesellschaft zur Förderung der Wissenschaften e. V., Max-Planck-Institut für Mikrostrukturphysik Halle | Published June 5, 2015
Winner
FEI Company
cpvs
38400000

In the "SuperX retrofit" is a newly developed EDX spectrometer the Dutch company FEI, which is to be installed as an additional component in the existing high-resolution transmission electron microscope "TITAN 80/300" (STEM) of the same company. It will replace an outdated EDX system for quantitative analysis elements. Due to its innovative design and improved software it is an approximately 10-fold improvement in energy-sensitivity have (element detection limit

Instruments for checking physical characteristics

Max-Planck-Gesellschaft zur Förderung der Wissenschaften e. V. Max-Planck-Institut für Mikrostrukturphysik Halle | Published July 18, 2015  -  Deadline August 12, 2015
cpvs
38400000

Delivery, installation and commissioning of an ion beam and -Ätz- -Depositions system. Delivery includes here also the transfer of a factory acceptance test protocol a in which the guaranteed performance parameters (see B-criteria) are documented. Proof of delivery of the full payment, a final payment, with the specified factory acceptance protocol parameters are repeated. General requirements. The unit is a complete system from one company to provide the necessary control software and install, including commissioning and training. The functionality of the built equipment system, including system-specific software must be the contractor guaranteed. The service and warranty for all delivered components must be carried out or to be organized by the contractor. At least 5 reference customers must be available in Europe and approachable for obtaining a reference statements. The installation requirements must be submitted separately together with the offer. The client provides only the electrical and other connections, according to installation requirements. Technical description of the components and performance parameters (specification): ion beam etching and -depositions system - A-criteria 90 ° C); 90 ° C); - All other flanges sealed metal - vacuum pump configuration for process chamber: turbo molecular pump> 1700 l / s, with Dry Backing pump> 25 m³ / h; N2 refrigerant - vacuum pump configuration for loadlock chamber: turbo molecular pump> 160 l / s, with Dry Backing pump> 10 m³ / h - 2 ion beam sources, depending on a) etching process and b) deposition process: Ø 120 mm minimum, metal sealed, 3- Grid extraction; compatible for reactive gases; 300 W; 0.05-10 mA / cm²; 300 W; - Plasma bridges neutralizer: maximum electron emission current of at least 0.5 A; - Multi target holder: a minimum of 6 targets, each with at least Ø 102 mm; automatic switching between various targets; Sputterwinkel variable and variable Sputterposition on target for optimal sputtering removal; 20 UPM; He rear-cooling; - 8 MFC controlled gas supply lines 60 l / s and Dry Pump); 300 amu mass range; Energy filter range 100 eV; Energy bandpass 0.5 eV; - Layer thickness control means 2 quartz crystal oscillators for etching and deposition processes; - System integration through cleanroom wall: opening to the loadlock-loading station and monitor with keyboard inside the clean room; - Computer control of processes: PC + Monitor + keyboard in the gray room; various administrative levels; Process parameter storage for fully automated operation;

Engineering services

Stadt Halle (Saale), Rechtsamt, Zentrale Vergabestelle Team VOL | Published April 21, 2016
Winner
Obermeyer Planen+Beraten GmbH
cpvs
71300000

With STARK III of Saxony-Anhalt has started one of the key investment projects for municipalities and also for the regional economy in this decade. The program includes about 380 million euros, to be invested until 2020th All schools and daycare centers in the country to be energetically renovated and modernized with IT - inasmuch as they are the Demography check.

The city of Halle (Saale) will provide funding requests for a total of 6 campuses, 3 gym and 1 Kita. As part of the preliminary studies on the energy improvement opportunities, accessibility and the current valid fire protection regulations have been carried out. These form a first basis for further planning.

The planning services of heating, ventilation and sanitary facilities to assist in the preparation of the application for the school site Hanoi Road is EU-wide level. Following a positive funding decision, the reaction of the redevelopment projects.

The primary school Hanoi street located in the district of Silberhöhe Hall. The primary school is a four-storey Schultypenbau Erfurt in which a classroom tract already been canceled. The primary school is to be used after restoration of approximately 300 students. The GFA is approximately 4,420 m 2 and the NF 3,000 m 2 ,

Engineering services

Stadt Halle (Saale), Fachbereich Recht, Team Submission | Published April 21, 2016
Winner
Haupt Ingenieurgesellschaft mbH
cpvs
71300000

With STARK III of Saxony-Anhalt has started one of the key investment projects for municipalities and also for the regional economy in this decade. The program includes about 380 000 000 EUR to be invested to 2020th All schools and daycare centers in the country to be energetically renovated and modernized with IT - inasmuch as they are the Demography check.

The city of Halle (Saale) will provide funding requests for a total of 6 campuses, 3 gym and 1 Kita. As part of the preliminary studies on the energy improvement opportunities, accessibility and the current valid fire protection regulations have been carried out. These form a first basis for further planning.

The planning services of heating, ventilation and sanitary facilities to assist in the creation of STARK III application for the school Southtown be EU-wide level. Following a positive funding decision, the reaction of the redevelopment projects.

The school is located in Southtown Southtown area and is a four-storey Schultypenbau Erfurt, which was built as a dual site. In the school should be informed after the renovation about 920 students.

The GFA of the building is approximately 7300 m² and the NF is around 4600 m².

Engineering services

Stadt Halle (Saale), Fachbereich Recht, Team Submission | Published April 21, 2016
Winner
iproplan Planungsgesellschaft mbH
cpvs
71300000

With STARK III of Saxony-Anhalt has started one of the key investment projects for municipalities and also for the regional economy in this decade. The program includes about 380 000 000 EUR to be invested to 2020th All schools and daycare centers in the country to be energetically renovated and modernized with IT - inasmuch as they are the Demography check.

The city of Halle (Saale) will provide funding requests for a total of 6 campuses, 3 gym and 1 Kita. As part of the preliminary studies on the energy improvement opportunities, accessibility and the current valid fire protection regulations have been carried out. These form a first basis for further planning.

The planning services of heating, ventilation and sanitary facilities to assist in the preparation of the application for the second comprehensive school Halle (Saale) are EU-wide level. Following a positive funding decision, the reaction of the renovation project.

To cover the requirement for the type of school School is scheduled to open a comprehensive school. The building is a building type Erfurt. In the school building should be informed in the future about 800 students. The GFA is approximately 7300 m² and the NF is around 4600 m².

Engineering services

Stadt Halle (Saale), Rechtsamt, Zentrale Vergabestelle Team VOL | Published April 21, 2016
Winner
Obermeyer Planen+Beraten GmbH
cpvs
71300000

With STARK III of Saxony-Anhalt has started one of the key investment projects for municipalities and also for the regional economy in this decade. The program includes about 380 000 000 EUR to be invested to 2020th All schools and daycare centers in the country to be energetically renovated and modernized with IT - inasmuch as they are the Demography check.

The city of Halle (Saale) will provide funding requests for a total of 6 campuses, 3 gym and 1 Kita. As part of the preliminary studies on the energy improvement opportunities, accessibility and the current valid fire protection regulations have been carried out. These form a first basis for further planning.

The planning services of heating, ventilation and plumbing systems to assist in the preparation of an application for primary school Hans Christian Andersen are EU-wide level. Following a positive funding decision, the reaction of the redevelopment projects.

The primary school "Hans Christian Andersen" is the Seebener street in the district of North Hall. The school is a building type Trauzettel with integrated gym. In the school building should be informed in the future about 270 students. The school building is supplied with district heating.

The GFA of the building is approximately 5606 m 2 and the NF is about 2 800 meters 2 ,

Engineering services

Stadt Halle (Saale), Rechtsamt, Zentrale Vergabestelle Team VOL | Published April 21, 2016
Winner
Hyder Consulting GmbH Deutschland
cpvs
71300000

With STARK III of Saxony-Anhalt has started one of the key investment projects for municipalities and also for the regional economy in this decade. The program includes about 380 000 000 EUR to be invested to 2020th All schools and daycare centers in the country to be energetically renovated and modernized with IT - inasmuch as they are the Demography check.

The city of Halle (Saale) will provide funding requests for a total of 6 campuses, 3 gym and 1 Kita. As part of the preliminary studies on the energy improvement opportunities, accessibility and the current valid fire protection regulations have been carried out. These form a first basis for further planning.

The planning services of heating, ventilation and sanitary facilities to assist in the preparation of an application for primary, community and secondary Kastanienallee, EU-wide level. Following a positive funding decision, the reaction of the renovation project.

The primary, community and secondary school is the Kastanienallee in the district south of Neustadt Halle. In the school building should be informed in the future about 570 students. When the school is a four-storey school type "Erfurt", which was built as a dual site. The GFA is approximately 8 200 m 2 and NF around 4 200 meters 2 ,

Architectural services for buildings

Stadt Halle (Saale), Fachbereich Recht, Abteilung Vergabe und Versicherung, Team Submission | Published March 23, 2016
Winner
Obermeyer Planen + Beraten GmbH
cpvs
71221000

With STARK III of Saxony-Anhalt has started one of the key investment projects for municipalities and also for the regional economy in this decade. The program includes about 380 000 000 EUR to be invested to 2020th All schools and daycare centers in the country to be energetically renovated and modernized with IT - inasmuch as they are the Demography check.

The city will provide funding requests for a total of 6 campuses, 3 gym and 1 Kita. As part of the preliminary studies on the energy improvement opportunities, accessibility and the current valid fire protection regulations have been carried out. These form a first basis for further planning.

The planning services object planning to assist in the preparation of proposals for the school site Hanoi Road is EU-wide level. Following a positive funding decision, the reaction of the redevelopment projects. The GS Hanoi street located in the district of Silberhöhe Hall. The GS is a four-storey Schultypenbau Erfurt in which a classroom tract already been canceled. The GS is to be used after restoration of approximately 300 students. Currently, the gable rooms of the classroom tract can not be used for educational purposes due to the lack of structural 2. escape route. In addition, the school site is not accessible. These deficits must be eliminated iR new planning.

Architectural services for buildings

Stadt Halle (Saale), Rechtsamt, Zentrale Vergabestelle Team VOL | Published March 23, 2016
Winner
Auspurg Borchowitz + Partner GbR
cpvs
71221000

With STARK III of Saxony-Anhalt has started one of the key investment projects for municipalities and also for the regional economy in this decade. The program includes about 380 000 000 EUR to be invested to 2020th All schools and daycare centers in the country to be energetically renovated and modernized with IT - inasmuch as they are the Demography check.

The city of Halle (Saale) will provide funding requests for a total of 6 campuses, 3 gym and 1 Kita. During the preliminary investigations have been carried out on the energy improvement opportunities, accessibility and fire safety regulations currently in force. These form a first basis for further planning.

The planning services object planning to assist in the preparation of proposals for the school site gymnasium Southtown, Katowice Street 40a, EU-wide level. Following a positive funding decision, the reaction of the redevelopment projects.

The school is located in Southtown Southtown area and is a four-storey Schultypenbau Erfurt built as double location. In the school should be informed after the renovation about 920 students.

Facility Planning 2. Integrated Comprehensive School Hall.

Stadt Halle (Saale), Fachbereich Recht, Abteilung Vergabe und Versicherung, Team Submission | Published March 22, 2016
Winner
Obermeyer Planen + Beraten GmbH
cpvs
71221000

With STARK III of Saxony-Anhalt has started one of the key investment projects for municipalities and also for the regional economy in this decade. The program includes about 380 million euros, to be invested until 2020th All schools and daycare centers in the country to be energetically renovated and modernized with IT - inasmuch as they are the Demography check.

The city of Halle (Saale) will provide funding requests for a total of 6 campuses, 3 gym and 1 Kita. During the preliminary investigations have been carried out on the energy improvement opportunities, accessibility and fire safety regulations currently in force. These form a first basis for further planning.

The planning services object planning to assist in the creation of applications for the second comprehensive school Halle (Saale) are EU-wide level. Following a positive funding decision, the reaction of the redevelopment projects.

To cover the demand for school form comprehensive school it is planned to open another School. The building is a building type Erfurt. In the school building should be informed in the future about 800 students.