Call +44 800 9755 164

Public tenders for energy in Freiburg Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

University of Freiburg: Sports institute, sports hall I, energy renovation, earthworks

Vermögen und Bau Baden-Württemberg Amt Freiburg | Published February 16, 2017  -  Deadline March 8, 2017
cpvs

University of Freiburg: Sports institute, sports hall I, energy renovation, earthworks

University of Freiburg: Sports institute, sports hall I, energy renovation, demolition work

Vermögen und Bau Baden-Württemberg Amt Freiburg | Published February 23, 2017  -  Deadline March 16, 2017
cpvs

University of Freiburg: Sports institute, sports hall I, energy renovation, demolition work

University of Freiburg: Sports institute, sports hall I, energy renovation, structural work

Vermögen und Bau Baden-Württemberg Amt Freiburg | Published February 23, 2017  -  Deadline March 16, 2017
cpvs

University of Freiburg: Sports institute, sports hall I, energy renovation, structural work

Electricity

Studierendenwerk Freiburg AöR | Published July 1, 2015  -  Deadline August 14, 2015
cpvs
09310000, 65310000

Delivery of approximately 3.3 GWh / year at 27 delivery points (9 points with an enrollee performance measurement / RLM and 18 points with standard load profile / SLP) of students Freiburg for the operation of buildings and premises. The contract will be awarded in one lot, this need 100% of the electrical energy comes from renewable energy sources. In the calendar year 2015 and 2016 interactive shopping done instead. The pricing is done with binding to the EEX.

Electricity

Studierendenwerk Freiburg AöR | Published October 7, 2015
Winner
LichtblickSE
cpvs
09310000

Supply of electricity of 1 400% renewable energy.

Engineering design services for mechanical and electrical installations for buildings

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Freiburg | Published August 14, 2015
Winner
m+p consulting Nord GmbH
cpvs
71321000

77652 Offenburg, Badstr. 24, Hochschule Offenburg, Regional Innovation Center (RIZ), construction, engineering services according to Part 4, Section 2 (Technical equipment) HOAI. The new building includes space program with a floor space of 1 500 m2 NF 1-6 and total construction costs of 8.5 million EUR (cost ceiling). The share of total construction costs for the technology be 1.9 million EUR. The space program is divided into 550 m2 of office space and 950 m2 of research space in a test hall. The office part is to be highly energy-efficient as possible as a plus energy house built. The construction site is located on the main campus of the University of Offenburg.

Scaffolding work

Vermögen und Bau Baden-Württemberg Amt Karlsruhe | Published May 13, 2015  -  Deadline August 1, 2015
cpvs
45331

KIT Campus South, construction of the Materials Science Center for Energy Systems (MIE) Type of service: scaffolding DIN 18451 Scope of Services: 3,460 sqm façade scaffolds, 700 m³ of space frames, 4 St. staircases, 1 St. Bauaufzug 2 t

Architectural services for buildings

Stadt Freiburg im Breisgau | Published April 8, 2016
Winner
Sutter³KG
cpvs
71221000

The city of Freiburg is the owner of the listed room area, Blumenstraße 9, 79111 Freiburg. In this building complex, consisting of a restaurant, club rooms and the church secretary, is a cultural monument of particular importance according to § 12 Denkmalschutzgesetz (DSchG). The "room" in the district of Freiburg St. Georgen is not just a restaurant with a bowling alley, but the former commune office, so the town hall of the formerly independent municipality of St. Georgen. The room was of 1574 at the headquarters of the St. Georgen bailiff. The back arranged in a U shape and the flower road building tract with outbuildings currently use different. In the rear region is an open space, which identifies a building window in the southern part; in the northern part of the city has created a children's playground. For the building of the barn a change of use is provided, as a central center for associations, citizens and with commercial space on the ground floor making best use of the historic holdings. As the core is to be built here a new meeting room with about 175 seats. It is planned to modernize and expand the existing dining options, and the Municipality Secretariat. The city followed in the operation constitutes a high energy standard of the building envelope which is completely refurbished and is planning an advanced energy supply concept. In addition to in a scientifically monitored Monitoring in one section the options of energy renovation tested in conservation and different material variants of interior insulation are documented for the purpose of imitation. The energy concept is therefore attached particular importance. The complex has a total gross floor area of ​​around 2 400 meters 2 , Completion is scheduled for the 1st half of 2019.

Heating installations

Staatliches Hochbauamt Freiburg | Published August 27, 2015  -  Deadline November 18, 2015
cpvs
45262

Rubbish home, Robert Schuman barracks, property-related energy concept (LEK heat) Type of service: heating installations scope of services: exchange gas / oil boiler 700 kW, install CHP 200 kW wood pellet plant 400 kW with conveyor and storage, buffer memory 9000 Ltr., heat distribution with approximately 270 m of pipeline, including maintenance. Review body pursuant to § 21 VOB / A: Regional Finance Karlsruhe, Department Bundesbau management

Ventilation and air-conditioning installation work

Stadt Freiburg im Breisgau | Published August 29, 2015
Winner
MBW Lüftung + Klimatechnik GmbH
cpvs
45331200

New Administration Center Level 1, Fehrenbachallee 12, 79106 Freiburg i Br.Zentrale climate or partial air conditioning systems for the mechanical ventilation of all areas. Fat exhaust air from kitchen; increased demands on energy efficiency of the central area, and the distribution system; Volume flow 110 000 m³ / h; GFA above ground approximately 19 300 m²; BGF underground about 5 000 m² of.

Ventilation and air-conditioning installation work

Stadt Freiburg im Breisgau – Vergabemanagement | Published March 7, 2015  -  Deadline April 16, 2015
cpvs
45331200

New administration center stage 1, Fehrenbachallee 12, 79106 Freiburg i Br.Zentrale climate or partial air conditioning systems for mechanical ventilation of all areas. Grease exhaust air from the kitchen; increased demands on energy efficiency of central controllers, as well as the distribution system; Flow approximately 110,000 m³ / h; GFA above ground approximately 19,300 m²; BGF underground approximately 5,000 m².

Instrumentation and control equipment

Stadt Freiburg im Breisgau – Vergabemanagement | Published May 5, 2015  -  Deadline June 2, 2015
cpvs
31682210

Building automation, administrative center city of Freiburg, Fehrenbachallee 12, 79106 Freiburg.Zentrale building automation to visualize, control and management of all technical systems. Integration of a measured value and energy acquisition system. Cross-BUS system.The building automation system comprises about 5 HVAC systems, about 2 heat generators, 1 water heater, about 2 refrigerating plants, 1 cooling tower, heat and Kälteverteilnetze.BGF overground approximately 19,300 m² GFA underground approximately 5000 m² ,

Architectural services for buildings

Stadt Freiburg i. Br. – Vergabemanagement | Published July 25, 2015  -  Deadline August 25, 2015
cpvs
71221000

The city of Freiburg is the owner of the listed room area, flowers Straße 9, 79111 Freiburg. In this ensemble of buildings, consisting of a restaurant, club rooms and the community secretariat, it is a cultural monument of particular importance according to § 12 Denkmalschutzgesetz (DSchG). The "room" in the district of Freiburg St. Georgen is not just a restaurant with a bowling alley, but the former rural community facility, so the town hall of the formerly independent municipality of St. Georgen. The room was of 1574 at the headquarters of the St. Georgen bailiff. The back arranged in a U shape and Blumenstraße building tract with outbuildings is currently used differently. In the rear area there is an open space that identifies a building window in the southern part; in the northern part of the city has created a children's playground. For the building of the barn a conversion is provided, as a central center for associations, citizens and with commercial space on the ground floor making best use of the historical inventory. As the core is to be built here, a new event room with about 175 seats. It is planned to modernize and expand the existing gastronomic area and the municipality secretariat. The city followed in the operation constitutes a high energy standard of the building envelope which is completely refurbished and is planning an advanced energy supply concept. In addition to in a scientifically monitored Monitoring in a subregion, the possibilities of energetic refurbishment tested in conservation and various material variants of the interior insulation will be documented for the purpose of imitation. The energy concept is therefore attached particular importance. The complex has a total gross floor area of ​​approximately 2400 m². The costs are provisionally budgeted at around 4.5 million EUR. Completion is scheduled for the 1st half 2019.

Architectural and related services

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Freiburg | Published June 2, 2015  -  Deadline June 30, 2015
cpvs
71200000

As part of the forthcoming reform is possible on Notary existing and widely listed Justizzentrum timber market in Freiburg extensive renovation and extension work on. Here, existing surface deficits balanced, eliminates organizational and safety deficiencies and the previously deployed housed areas are in future recognized the "Holzmarkt". The entire space program covers a floor space of approximately 6 500 m2 and mainly includes the construction of courtrooms and administrative and filing areas. The construction project is divided into 2 phases of construction. In a first construction phase, a new building will be built with an area of ​​approximately 5 200 m2 in the rear courtyard of the justice center. In a 2nd phase, the existing corner building Holzmarkt / Luisenstraße is to plan with an area of ​​approximately 1 300 m2. Of the selected candidates are proposed solutions for the planning task in the form of project outlines for the rear construction (1.BA) are developed with a connection to the landmarked old stock in the 2nd stage of the process which are decisive for the selection of the contractor. At the same time an urbanistic idea sketch for the corner building Holzmarkt / Luisenstraße (2nd phase) is expected with this project outline. The urban idea sketch is part of the project proposal. The new building is to be highly energy-efficient built as a zero-energy house. The total construction costs for the 1st phase of construction will be approximately 20.5 million EUR gross. The total construction costs for the 2nd phase of construction will be approximately 5.5 million EUR gross.

Interpretation services

Wasser- und Schifffahrtsamt Freiburg | Published December 26, 2015  -  Deadline January 28, 2016
cpvs
79540000

Conference Interpreting in technical working groups of the Permanent Commission and the Committee A of the German and French governments. About 30 to 50 working group meetings will be held per year. In the working groups, the interpreter ensures the consecutive translation into French and German alike from from French into German. At the meetings, the following topics are mainly discussed: Marine, lock operation, energy from hydropower, flood control, dikes or dams, hydrology, sediment and dredged material, maintenance of What-waterways, hydraulic engineering, administrative law, planning approval procedures in Germany or France and International relations.

Electrical installation and fire alarm system, emergency lighting, RWA

Staatliches Hochbauamt Freiburg | Published May 7, 2015  -  Deadline December 2, 2015
cpvs
45311, 45312, 45343

Customs establishment Freiburg, fire protection measures and energy-efficient renovation Type of service: electrical installation with fire alarm system, emergency lighting and RWA scope of performance: 36 St. safety lights DS / BS, 1 RWA system; 1 fire alarm system with FBF, FAT; 81 St. smoke detectors; 7 manual call points; 1100 m cable NYM; In addition to manufacturing plant maintenance services are also the subject of the procurement procedure. Review body in accordance with § 21 VOB / A. Oberfinanzdirektion Karlsruhe, Abt Bundesbau management

Engineering design services for mechanical and electrical installations for buildings

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Freiburg | Published April 29, 2015  -  Deadline May 22, 2015
cpvs
71321000

77652 Offenburg, Badstr. 24, Hochschule Offenburg, Regional Innovation Center (RIZ), construction, engineering services under Part 4 Section 2 (Technical equipment) HOAI The new building comprises the space program with a floor space of 1 500 m2 NF 1-6 and total construction costs of 8.5 million EUR (cost ceiling) , The share of total construction costs for the technology be 1.9 million EUR. The space program is divided into 550 m2 of office space and 950 m2 of research space in a test hall. The office part is to be highly energy-efficient as possible erected as Plusenergiehaus. The construction site is located at the main campus of the University of Offenburg.

Data Technical Connection of an electrolyser

Fraunhofer Gesellschaft e.V. | Published December 12, 2016  -  Deadline January 10, 2017
cpvs

At the site Straße 8, Freiburg will be built by the Fraunhofer ISE in coordination and cooperation with the bnNETZE GmbH and badenova AG an infeed hydrogen into the gas grid. The hydrogen is produced by means of an electrolyser, which is also the site Straße 8 befindet.Die in Freiburg entire system is to be implemented within the framework of a project funded by the State of Baden-Württemberg project to demonstrate power to gas in the distribution network and in validate the project developed algorithm (operating electrolysis in an energy network), demonstrate and bewerten.Der electrolyser has its own control, which provides the measurement data via Modbus. After the electrolyzer, a flow regulator and pressure sensors are installed, which is switched to an existing PLC. With the help of the flow regulator to the generating amount of hydrogen to be controlled "because the electrolyser does not have the possibility to be operated power controlled. In the infeed is also a PLC installed, which ensures the autonomous operation of the system. This is all provided on site.

Refuse and waste related services

Abfallwirtschaft Landkreis Breisgau-Hochschwarzwald (ALB) | Published November 20, 2015
Winner
REMONDIS GmbH & Co. KG – Region Süd
cpvs
90500000, 90510000, 90513000, 90513300

The scheduled services will be awarded in two lots, which comprise mainly the following individual services: lot 1: acquisition, sorting and recycling / disposal of bulky waste from the following municipalities of the southern and western county region. Lot 2: acquisition, sorting and recycling / disposal of bulky waste from the following municipalities in the northern and eastern county area. Essentially, the following benefits are awarded to in the lots: - acquisition of bulky waste (including waste wood.) At a transfer plant / water treatment plant of the bidder in the respective area of ​​Lot 1 or Lot 2 includes the city of Freiburg.. - If necessary, transportation of bulky waste to a sorting plant / mechanical treatment plant (incl. Provision of suitable vehicles). - Recycling of scrap (waste wood and possibly inert) and treatment of non-recyclable residues to substitute fuels. - Energy recovery of refuse derived fuels. - Handing over the sorted waste for thermal disposal in the TREA Breisgau.

Air conditioning systems

Vermögen und Bau Baden-Württemberg Amt Freiburg | Published June 25, 2015  -  Deadline October 16, 2015
cpvs
45261

Staatl. School for the Visually Impaired St. Michael Type of service: Air conditioning systems Scope of Services: Swimming pool ventilation system - central control unit with Vmin = 7000m ³ / h, energy efficiency class A + - air ducts up to 1000mm edge length, about 75m ² - air pipes DN 250, 35m - 15 x Ceiling swirl diffusers, each with 700m ³ / h (TO + AB) - Heating-side connection of the system - precision steel pipes, DN 32, about 30 are with mineral wool insulation and sheathing with plastic foil addition to the production of the plant and maintenance services object of the procurement procedure. Bidders and their post-hire and entrepreneurs have to tender to deliver the relevant undertakings in accordance with § 5 LTMG, accessible at "www.rp-stuttgart.de/servlet/PB/menu/1359260/index.html".