Public tenders for energy in Frankfurt-am-main Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyGermanyfrankfurt-am-main

Repair and maintenance services of electrical building installations

Technisches Gebäudemanagement / Facility Management | Published October 6, 2017
Winner
Apleona HSG Rhein-Main GmbH
cpvs
50711000

Mainova AG plans the technical building management, which so far has been done in its own direction, to tender and to outsource. These are 5 locations within Frankfurt with a total of 41 buildings of various uses. The definitions of the tender for the TGM services are based on DIN 32736. Technical building management is divided into the following areas: operation, including maintenance, documentation, energy management, information management, modernization, renovation and reconstruction. The technical fields are: plumbing, ventilation, heating and electrical engineering.

Parts of electricity distribution or control apparatus

DB Energie GmbH (Bukr 31) | Published April 16, 2016  -  Deadline May 11, 2016
cpvs
31230000

is (current status) for secondary technical equipment of 110kV and 15kV 16.7Hz traction power switchgear in central or side body structure based on the IEC 61850 which to link the process side of multivendor, standardized handover interfaces substation automation under "Specifications - - Station control for traction power supply systems of DB Energie GmbH" ,

Requirements of the specifications at:

DB Energie GmbH;

Energy distribution systems and process control (I.ETZ 22);

Pfarrer-Perabo-Platz 2;

60326 Frankfurt am Main.

Railway construction works

BASF SE | Published April 29, 2017  -  Deadline June 9, 2017
cpvs
45234100

Dismantling and new construction of railways according to EBO on a length approx. 3.6 km.

- deep building measures (excavation, pile construction, protective layer PSS, drainage;

- approx. 4.3 km Rebuilding of the superstructure, incl. Points and a crossing;

- Construction of a platform, extension of two further, platform equipment;

- New construction of 4 railway junctions. Including technical assurance;

- measures on PBX systems, object protection;

- measures on electrical energy systems (point heating, power supply);

- construction work;

- Construction of the overhead contact line.

Electronic equipment

DB Regio AG (Bukr 12) | Published May 6, 2017  -  Deadline May 18, 2017
cpvs
31710000, 48810000

DB Regio plans to set up a multifunctional telematics system for large parts of its rail vehicle fleets.

The multifunctional telematics system (MTS) is an IT process. It consists of a telematics server including applications (short TS) to which a large number of on-board telematics systems (BTS for short) are connected by mobile phone connection on the vehicle side.

The procurement project for the establishment of the MTS comprises the procurement of the BTS and the procurement of the technical management services for MTS and BTS.

The on-board telematics systems are to be purchased and made available to the supplier as a service provider.

With the acquisition of the MTS, DB Regio pursues the following objectives:

Reduction of energy consumption and CO2 emissions,

Satisfaction of customers and employees,

Operational excellence

The number of BTS to be delivered can only be determined after the contract has been awarded, as it depends on the achievement and acceptance of the MTS.

The DB Regio plans to install up to 1,200 BTS by the end of 2017 and is therefore dependent on short delivery times.

The total procurement value over the contract period is planned to be between EUR 0 and EUR 8 million.

Purchase of on-board telematics systems and their technical operation management.

Construction work

Nassauische Heimstätte GmbH als Treuhänder der Stadt Rüsselsheim | Published March 30, 2016
Winner
Bauunternehmung Albert Weil AG
cpvs
45000000, 34993000, 45100000, 45111290, 45112400, 45112700, 45113000, 45222000, 45231000, 45232000, 45233120, 45233222, 45247110, 45310000

The city of Rüsselsheim am Main, amidst the Rhein-Main area (60 000 pe) is location

the Hessentagsarena 2017. The city council of the city of Rüsselsheim am Main

decided that the slamming by awarding the Hessen day in 2017 the city

Investment grants should be used to, in particular to develop the downtown

and modernize. In this course are among others the construction of

Redesign of the Peace Square, the rejuvenation of the Frankfurter Straße and the

Transformation of the marketplace are realized until Hessentag in June 2017th simultaneously

are in this area the necessary work for the rehabilitation / modernization of the urban

performed channel lines and the supply lines of Stadtwerke Rüsselsheim GmbH

will.

The measures are in the redevelopment area "downtown Rüsselsheim", is from hence the

Tendering of services by Nassauische Heimstätte as fiduciary

Redevelopment agency. The ordering and invoicing of road and sewer services

is also responsible Nassauische Heimstätte as fiduciary redevelopment agency, the

Ordering and billing of services for the rehabilitation / renovation of

Supply lines of Stadtwerke Rüsselsheim GmbH carried out by the participating

Companies Stadtwerke Rüsselsheim GmbH, Energy Rüsselsheim GmbH,

Water supply Rüsselsheim GmbH, fiberglass SWR Rüsselsheim GmbH.

Repair and maintenance services of electrical building installations

Technisches Gebäudemanagement / Facility Management | Published April 19, 2016  -  Deadline July 11, 2016
cpvs
50711000

Mainova AG is planning the Technical Gebäuedemanagement which was previously provided on its own, tender and outsourced. It is at 5 locations within Frankfurt with a total of 41 buildings of different usage. The definitions to tender for the TGM services is done according to DIN 32736th

The technical building management is divided into the following performance areas:

Operate, incl. Maintenance, documentation, energy management, information management, modernization, renovation and remodeling.

The technical trades relate: plumbing, ventilation and air conditioning, heating and electrical engineering.

Schön Klinik München Harlaching, enlargement surgery, sanitary engineering.

Schön Klinik München-Harlaching | Published February 25, 2016
Winner
Stingl GmbH Gebäudetechnik
cpvs
45232460, 42131400, 44411000, 44163110, 44162500

The construction project is divided into 2 phases of construction

- Phase 1 - Construction of Nov. 2015 until Aug. 2016th

The SW-disposal building the extensions via 2 new channel connections to an already verlegtenSW Channel south of the building for public SW channel in Grünwalder Street.

The lying below the backflow level discharge points in the basement are 2 SW Dual Hebeanlagenentwässert.

The RW disposal of roof surfaces via outer lying down pipes and an RW channel to a rain water tank with filtering.

The entire rain water is to serve as a wetting medium for the adiabatic evaporative cooling of exhaust inden central energy recoveries of HVAC systems.

The extension is powered via a connection to the existing TW-supply (KW + WW and VE + EH) in BT.

As sanitary objects come wall toilets, sinks in various versions, mitWandabläufen showers, sinks in plaster rooms and a combination care in unclean workspace sowieTWS-off valves for on-site work desk units with built-in basin for execution.

For firefighters by firefighters are in all levels hydrants "wet" provided with zugehörigemeigenständigem pipeline system.

The connection is made to the existing fire-fighting barriers in the UG BT. 1

- Phase 2 - Reconstruction Surgical Outbuildings BT 1 from Feb. 2017 to Aug. 2017th

In the areas 2.OG BT 1 conversions are planned in the portfolio.

To reinstall the altered spatial and installation order power plants undSanitärobjekte must be dismantled and neumontiert.

Rescue and emergency equipment

Landratsamt Landsberg am Lech | Published April 8, 2016
Winner
Jerg Feuerwehrtechnik GmbH
cpvs
35112000

Procurement Abrollbehälter Einsatzleitung / Meeting, Abrollbehälter flood, Abrollbehälter Sandsackfüllanlage / energy Abrollbehälter care.

Electricity

Stadt Osterode am Harz | Published September 26, 2017  -  Deadline November 7, 2017
cpvs
09310000

Supply of electrical energy from renewable energies (green electricity) at consumption points in the city of Osterode am Harz for the city of Osterode am Harz as well as at facilities of the business enterprises of the city Osterode GmbH (WIBO).

Supply of electrical energy from renewable energies (green electricity) at consumption points in the city of Osterode am Harz. Duration 2 years, starting on 1.1.2018. The total reduction rate is approx. 1 780 000 kw / h.

Supply of electrical energy from renewable energies (green electricity) to consumption points of the business enterprises of the city of Osterode GmbH. Duration 2 years, starting on 1.1.2018. The total reduction rate in 2018 is about 741 000 kw / h and in 2019 about 161 200 kw / h.

Electricity, heating, solar and nuclear energy

DB Energie GmbH (Bukr 31) | Published October 18, 2016
cpvs
09300000, 09321000

Heat supply RZ Berlin Florastraße- DB Systel GmbH.

Petroleum products, fuel, electricity and other sources of energy

Stadt Osterode am Harz | Published June 11, 2016  -  Deadline July 13, 2016
cpvs
09000000, 09123000

Supply of gas to consumption points in the territory of the town Osterode am Harz and the farms of the town of Osterode GmbH (Wibo). Duration 2 years, starting from 10/01/2016. The total purchase amount is approximately 11 500 000 kwh pa

Engineering design services

DB Energie GmbH (Bukr 31) | Published March 25, 2016
cpvs
71320000

New workshop building of DB Energie GmbH, Berlin, Markgrafendamm 24, planning services.

Construction work

Hochbauamt | Published December 16, 2016  -  Deadline February 7, 2017
cpvs
45000000, 45410000

Plaster and stucco work.

The existing school building is completely renovated. The renovation includes the fire protection and energy upgrading, renovating the entire interior area with the gym and the installation of an elevator. In the basement, the floor plate, the ceiling will be renewed in some areas, open to EC and built a staircase. The existing temporary roof will be canceled and replaced by a new attic in wood construction. Since the existing ceiling is not viable for a school use on the top floor (floor attic), a laminated timber ceiling is on a new steel girder grid mounted. The outbuilding is converted into a kiosk.

The existing school building is built in solid construction and has a floor area of ​​approximately 1 835 m 2 , The eave height is about 20.70 m; the new ridge height is approximately 28 m. The annexe has a floor area of ​​approximately 113 m 2 , The eaves height is approximately 3.50, the ridge height about 5 m.

The work will be in several sections, partly. With small surfaces, running on all floors (5 levels). The execution period extends over about 16 months.

Plaster and stucco work:

200m 2 Test the substrate and remove loose;

about 2 500 meters 2 Clean the surface;

approximately 11 000m 2 Paint grind;

close about 270 m wall slots;

about 3 000m 2 Bonding agents applied;

about 1 600 meters 2 Gipskalkputz;

about 2 800 meters 2 Cement plaster inside 2 layers;

150 m 2 Acoustic ceiling plaster;

approximately 470 m 2 RFP;

550 m edge profile steel / stainless steel;

ca. 320 m 2 Clean exposed brickwork and downstream / grouting;

300m 2 Interior insulation calcium silicate boards.

Engineering design services for the construction of civil engineering works

Stadt Ingelheim am Rhein | Published April 8, 2016  -  Deadline May 10, 2016
cpvs
71322000

There are also the result of an investigation for energy retrofit set.

Hot water

DB Energie GmbH (Bukr 31) | Published November 23, 2017
Winner
Vergabekammer des Bundes
cpvs
09321000, 09323000

DB Energie GmbH needs heating energy from a system to be constructed with a connected load of approx. 200 kW to heat a property in Stendal (D). Delivery object is the required heat, the type of heat generation is left to the contractor. Delivery period from 1.9.2017 to 31.8.2027. Other keywords: heat contracting, heat delivery, heating water.

DB Energie GmbH needs heating energy from a system to be constructed with a connected load of approx. 200 kW to heat a property in Stendal (D). Delivery object is the required heat, the type of heat generation is left to the contractor. Delivery period from 1.9.2017 to 31.8.2027.

IT services: consulting, software development, Internet and support

Süwag Grüne Energien & Wasser GmbH | Published January 18, 2017  -  Deadline February 14, 2017
cpvs
72000000, 72200000, 72210000, 72212100, 72212462, 72212519

The project Enervator must examine the objective, the integrated control and linking of electrical and thermal loads, electricity storage and local electricity and heat production in district power station "Am Main View" in Kelsterbach. Moreover, the economic potential will be evaluated by electricity procurement and marketing optimization of district power stations in the network.

For this, about 50 of the 180 households of the residential area be integrated based on intelligent predictions in the energy supply concept by active control. In the latest generation households digital electricity meters, including the communication unit Smart Meter Gateway (SMGW) be installed for data acquisition and control of loads. Moreover, these households are equipped with smart home system to allow the control of various devices.

The objective is the development, testing and application of the following new technologies:

- Use of smart metering and SMGW in households for the acquisition and processing of high-resolution data. Providing more flexible tariff plans for consumers based on the individual site power generation.

- Testing of automated and encrypted data evaluation SMGW by BSI (Bundesamt für Sicherheit in der Informationstechnik) guidelines.

- Testing of active consumer control of a smart home system in households.

- Development of a higher-level controller architecture, the consumption and production in the district power station coordinates co (heat and electricity).

- Integration of E-Mobility in the concept Quartier power plant, evaluation of a bidirectional charging infrastructure.

- Conceptual testing of automated digital billing methods.

Hot water

DB Energie GmbH | Published April 27, 2016
Winner
Fernwärmeversorgung Niederrhein GmbH
cpvs
09321000

DB Energie GmbH is required for the heat supply of a site in Rostock (D) heating with a mobilized total capacity of approximately 1,195 kW. Supply object is the heat required, the manner in which the heat is up to the contractor. Delivery will start on 01.10.2014. More Tags: heat contracting, heat supply, steam supply, plant contracting, heating, district heating, district heating, oil heating, gas heating, renewable energy.

Research and development services and related consultancy services

Süwag Grüne Energien & Wasser GmbH | Published January 18, 2017  -  Deadline February 14, 2017
cpvs
73000000, 73100000, 73200000

The project Enervator must examine the objective, the integrated control and linking of electrical and thermal loads, electricity storage and local electricity and heat production in district power station "Am Main View" in Kelsterbach. Moreover, the economic potential will be evaluated by electricity procurement and marketing optimization of district power stations in the network.

For this, about 50 of the 180 households of the residential area be integrated based on intelligent predictions in the energy supply concept by active control. In the latest generation households digital electricity meters, including the communication unit Smart Meter Gateway (SMGW) be installed for data acquisition and control of loads. Moreover, these households are equipped with smart home system to allow the control of various devices.

As part of the accompanying scientific research applicability and effects of innovative technologies, protocols and billing models are analyzed and in particular the customer interaction are sociologically evaluated for consumer control and high-resolution data acquisition.

Lifts

Handwerkskammer Frankfurt-Rhein-Main | Published December 16, 2016
Winner
Thyssen Krupp Aufzüge GmbH
cpvs
42416100

The Chamber of Frankfurt-Rhein-Main has mandated the supply and installation of elevators for the new building of the boarding school for the training and technology center in Weiterstadt.

The elevators will be installed in the four-story building, the (66 mx 11 m) is planned in massive construction as bolt-like building.

Intended elevator work

- Site equipment, protective measures;

- 2 lifts, per 1 000 kg after earthquakes Category 1;

- An engine-less elevator concept;

- The drive motor is to be disposed within the shaft head;

- The assessment of the engine, at least 180 trips / hour;

- Electronic microprocessor control as one-button collective control;

- External operating caste / Service panel bottom landing;

- Fire control;

- Stand-by mode, and learning function of the controller;

- The energy efficiency class must be demonstrated.

Quantities:

- 2 lifts, per 1 000 kg after earthquakes Category 1;

- 1. PA: Delivery height: 3.50 m, Number of stop: 3, number of doors: 3 (2/1 opposite) control: one-button collective control;

- 2. PA: Delivery height: 9.80 m, Number Maintenance: 4, Doors: 4 (4 superimposed).

Construction work for school buildings

Landratsamt Landsberg am Lech | Published November 25, 2017
Winner
Schmitt + Sohn Aufzüge GmbH & Co. KG
cpvs
45214200, 45313100

The Wolfgang Kubelka secondary school in Schondorf am Ammersee is extended and rehabilitated.

As part of the overall project, a new 3-fold sports hall will be built, an existing gymnasium removed and replaced by an extension with natural science rooms and a cafeteria. In the existing building conversions, fire protection measures and energy improvements are carried out. Finally, the outdoor facilities are adjusted.

Allocation unit 200-2 passenger lift sports hall:

Lift system for 3-speed school sports hall

- Elevator suitable for disabled persons according to EN81-70 - Load capacity 630 kg or 8 persons

- 2 stops, one-sided access, doors unilaterally opening

- Portal extensions and wall enclosure frames at both entrances.