Public tenders for energy in Frankfurt-am-main Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyGermanyfrankfurt-am-main

Electrical wiring and fitting work

Ingelheimer Kultur und Marketing GmbH | Published January 25, 2017  -  Deadline February 20, 2017
cpvs
45311000, 45312100, 45312310, 45231400, 45231000

The Ingelheim Culture and Marketing GmbH is building owner the points of Bingener Straße 16, Ingelheim am Rhein, property "Winzerkeller Ingelheim". The beginning of the last century, built from the Winzerkeller cooperative wine cellar is to become a focal point for visitors to the wine town of Ingelheim.

1 safety light system with central battery;

about 130 pieces Safety and emergency luminaires;

1 LVMD with transformer measuring places, counters and smoke evacuation.

approx 12 pieces distributions;

about 2 piece data network cabinet;

about 150 meters fiber optic cabling;

about 7 400 meters EDP cabling;

1 piece door communication system with IP supported access control;

about 17 800 meters power cable and wires.

about 2 600 meters Low power cables and lines.

about 3000 meters MSR cabling;

90 core drillings;

about 400 meters cable trays, duct;

about 80 meters from trunking;

about 200 meters underground passage;

800 piece installation equipment;

about 534 pieces LED lights;

about 110 pieces LED floor lights;

about 380 meters of LED strip lights and busbars.

about 6 pieces LED floor lamps;

15 pieces LED building, mast and bollard lights;

about 4 pieces Energy pillars grounds;

about 1 piece KNX and Dali conditioning;

about 1 Each fire alarm system;

about 290 pieces Fire alarm installation equipment;

about 1 piece wiring smoke extraction;

about 1 piece wiring of ventilation and cooling systems;

about 1 piece wiring of lift systems;

about 2 200 meters integrity cable E30 u E90.

about 50 pieces of fire protection measures;

1 piece lightning protection system (building footprint approximately 946 m 2 ).

Ash disposal services

GML Abfallwirtschaftsgesellschaft mbH | Published October 12, 2016  -  Deadline November 16, 2016
cpvs
90513400

The contractor (AN) takes the energy from waste plant (MHKW) GML Waste Management mbH (AG) slag produced by the detailed provisions of the Specifications. The Contractor shall provide an integrated service, belong to the Bunker Management, loading and transport, processing of slag, recovery or disposal of waste materials and the documentation.

Among the benefits of AT in particular include:

Basics:

- Expected amount, about 65 000 t / a - 72 000 t / a (waste code number 19 01 12) "rust and ash and slag other than those mentioned in 19 01 11 *", as the "slag";

- Collection usually Monday to Friday, if necessary, on Saturdays, Sundays and public holidays and at night;

- Contract Period: performance over 5 or 10 years (depending on the award of the contract) from 04.01.2017;

- Disposal of mineral beneficiation residues: own landfill and / or use GML quota

Bunker Management:

- Free attitude of Intercept and drainage points in the slag bunker

Loading and transport:

- Loading by crane the AG and qualified and trained personnel of the contractor;

- Transportation by truck and transported further with defined transport for slag treatment plant

Treatment of slag:

- Providing a readily available buffer capacity of at least 7 500 tonnes (approximately 1 month of operation MHKW at full load);

- Treatment of slag in a slag treatment plant;

- Recycling of secondary raw materials by the contractor;

- Disposal / recovery of the mineral beneficiation residues by the Contractor

Documentation:

- Review of the Mengenstrukuren and recycling methods, documentation of the fate.

Schön Klinik München Harlaching - enlargement surgery.

Schön Klinik München-Harlaching | Published February 26, 2016
Winner
Caliqua-Bormann GmbH & Co. KG
cpvs
45331100, 42511100, 42122000, 44163000

Schön Clinic Munich-Harlaching, extension OP - heating / refrigeration.

The construction project is divided into 2 phases of construction

- Phase 1 - Construction of Nov. 2015 until Aug. 2016th

The extension is a connection to the existing heating system with max. Output of 460 kW supplies.

From the substation in the 1st basement of the heat distribution in the building by means of 2 distributors (Stat. Heating, air conditioning systems and air conditioning systems U1 3rd floor).

For the heating of the staircase column radiators are provided.

All rooms of the extension, except equipment rooms and interior Outbuildings, such. As toilets, storage rooms and operating rooms are equipped with a combined underfloor heating / cooling.

The supply of the cleaning / disinfection and sterilization equipment in the 1st basement of the extension with saturated steam about 1000 kg / h is done by the existing

Steam boiler system in the existing heating system BT. 2

The extension is primarily "quaritären" with cold energy through the thermal use of shallow groundwater supplies (270 kW).

- Phase 2 - Reconstruction Surgical Outbuildings BT 1 from Feb. 2017 to Aug. 2017..

In the areas 2nd Floor BT 1 conversions are planned in the portfolio.

To reinstall the altered spatial and installation assembly power plants and heating must be dismantled and neumontiert.

Schön Klinik München Harlaching, enlargement surgery, sanitary engineering.

Schön Klinik München-Harlaching | Published February 25, 2016
Winner
Stingl GmbH Gebäudetechnik
cpvs
45232460, 42131400, 44411000, 44163110, 44162500

The construction project is divided into 2 phases of construction

- Phase 1 - Construction of Nov. 2015 until Aug. 2016th

The SW-disposal building the extensions via 2 new channel connections to an already verlegtenSW Channel south of the building for public SW channel in Grünwalder Street.

The lying below the backflow level discharge points in the basement are 2 SW Dual Hebeanlagenentwässert.

The RW disposal of roof surfaces via outer lying down pipes and an RW channel to a rain water tank with filtering.

The entire rain water is to serve as a wetting medium for the adiabatic evaporative cooling of exhaust inden central energy recoveries of HVAC systems.

The extension is powered via a connection to the existing TW-supply (KW + WW and VE + EH) in BT.

As sanitary objects come wall toilets, sinks in various versions, mitWandabläufen showers, sinks in plaster rooms and a combination care in unclean workspace sowieTWS-off valves for on-site work desk units with built-in basin for execution.

For firefighters by firefighters are in all levels hydrants "wet" provided with zugehörigemeigenständigem pipeline system.

The connection is made to the existing fire-fighting barriers in the UG BT. 1

- Phase 2 - Reconstruction Surgical Outbuildings BT 1 from Feb. 2017 to Aug. 2017th

In the areas 2.OG BT 1 conversions are planned in the portfolio.

To reinstall the altered spatial and installation order power plants undSanitärobjekte must be dismantled and neumontiert.

Sanitary works

Schön Klinik München-Harlaching | Published August 22, 2015  -  Deadline September 22, 2015
cpvs
45232460, 42131400, 44411000, 44163110, 44162500

Schön Clinic Munich-Harlaching, extension OP - Plumbing Equipment The construction project is divided into 2 phases of construction - Phase 1 - New from November 2015 to August 2016, the SW-disposal of the extension building is via 2 new channel connections to an already laid SW Channel south the building for public SW channel in the Green Walderstrasse. The lying below the backflow level flow bodies in the basement are dehydrated over 2 SW Double-lifting plants. The RW disposal of roof areas is done via external downpipes and an RW channel to a rainwater tank with filtering. The entire rain water to serve as a wetting medium for the adiabatic evaporative cooling of exhaust air to the central energy recoveries of HVAC systems. The extension is powered by a connection to the existing TW-supply (KW + WW and VE + EH) in BT. As sanitary objects come wall toilets, washbasins in different versions, with wall showers processes, sinks in plaster rooms and a combination of care in unclean work space and TWS-off valves for on-site work bench systems with built-in basin for execution. Fire-fighting by the fire brigade are in all levels hydrants "wet" provided with associated an independent pipeline system. The connection is made to the existing fire-fighting separating station in the basement BT 1 - Phase 2 - Reconstruction Surgical Outbuildings BT 1 from Feb. 2017 to Aug. 2017 in the areas 2.OG BT 1 conversions are planned in stock.. To reinstall the altered spatial and installation order power plants and sanitary objects should be disassembled and neumontiert.

Architectural, engineering and planning services

Deutsche Bundesbank, Beschaffungszentrum | Published May 11, 2017  -  Deadline June 8, 2017
cpvs
71240000

The residential complex (Schwabstraße 167-169) was built from 1952-1954 as a 5-storey building with plastered façades and saddle roof.

1,708 m².

The main goal of the renovation is the optimization of the housing stock by energetic, techn. And constructional measures with improvement of fire, sound and heat protection.

In addition to a "1: 1 refurbishment of the full floors without the expansion of the attic storey", the decision-making process for "overcompletion in the attic" and "expansion of the existing attic floor" are part of the Lph 2; In the sense of a feasibility study regarding construction law, rough cost estimates and construction work.

There is no legal claim for further commissioning.

Project language: german.

The construction project concerns the property "Schwabstraße 167-169" in Stuttgart.

Depending on the concept, the following measures are necessary:

Roofing / Insulation:

- Demolition work in the attic (pointed floor and converted attic.

- Insulation of the top floor.

- Insulation of the cellar ceiling.

- External wall insulation in accordance with the energy concept.

- alternative LP 2, elaboration of the decision form "Nachverdichtung im Dachgeschoss"

- alternative LP 2, elaboration of the decision-making template "expansion of the existing attic storey".

Facade work:

Projections, balconies, loggias according to EnEV in the version valid at the time of the planning or alternative planning-dependent concepts;

- Renovation of the windows / windows, including roller shutters in accordance with EnEV, possibly taking account of additionally required noise protection requirements;

- new concept of staircase windows, also with regard to fire protection concept;

Railings / balustrades;

- repair of damaged KG outer panels, basement outer walls and home entrance;

- Check for sealing of basement exterior walls.

stairways

Fire safety regulations;

- fire protection partition of the installation shafts;

Painting;

- renewal of the electrical system;

- processing of existing staircases, platforms and railings;

- renovation of the entrance doors;

- renewal of mailboxes;

- Installation of a RWA system.

Apartments:

- fire protection partition of the installation shafts;

- renovation or reprocessing of the floor covering, plastering and painting work, also ceiling plastering, renewal of electro / HLS;

- refurbishment of bathrooms (tiles, objects, fittings, installation);

- refurbishment of kitchen installations;

- renovation or refurbishment of interior doors;

- 1 residential unit is to be planned as a barrier-free option (costs must be shown separately).

House measures:

Insulation of non-insulated parts, etc.

- renewal of main electrical distribution and electrotechnical basic installation in the general areas (also open spaces) and in apartments, including antenna cables, telephone, door intercom systems, etc.

New installation of a lifting facility in the basement, fire protection technology of the shafts and examination of the requirement of an automatic backwashing filter for drinking water).

Renewal of the drainage channels Wastewater and rainwater.

- dismantling of the gas supply.

Also included in the planning are:

- outdoor facilities;

- Replace plates, cover a damp retaining wall, repair the greenery.

The exact scope of services is defined as part of the planning phase and should be an overall concept taking into account the cost frame.

Construction costs gross 2 300 000 EUR

KG 300 gross 1 500 000 EUR

KG 400 gross 800,000 EUR

Building costs EUR 2 300 000

Household costs 800 000 EUR

A separate office is bound by the bank in the framework of a competition for the domestic technical measures.

Central-heating installation work

Schön Klinik München-Harlaching | Published July 25, 2015  -  Deadline September 15, 2015
cpvs
45331100, 42511100, 42122000, 44163000

Schön Clinic Munich-Harlaching, extension OP - heating / cooling technology The construction project is divided into 2 phases of construction - Phase 1 - New from November 2015 to August 2016 The extension is a connection to the existing heating system with max. Output of 460 kW supplies. From the substation in 1.UG from the heat distribution in the building is via 2 distributor (Stat. Heating, air conditioning systems U1 and HVAC systems 3rd floor). For the heating of the staircase column radiators are provided. All rooms of the extension, except equipment rooms and interior Outbuildings, such. As toilets, storerooms and operating rooms are equipped with a combined underfloor heating / cooling. Quaritären The supply of the cleaning / disinfection and sterilization equipment in 1.UG the extension with saturated steam about 1000 kg / h is done from the existing steam boiler system in the existing heating system BT 2. The extension will primarily with cold energy through the thermal use of near-surface " "groundwater supplies (270 kW). - Phase 2 - Reconstruction Surgical Outbuildings BT 1 from Feb. 2017 to Aug. 2017 the areas 2.OG BT 1 conversions are planned in stock.. To reinstall the altered spatial arrangement and installation power systems and radiators must be dismantled and neumontiert.

Construction work for school buildings

Landratsamt Landsberg am Lech | Published November 25, 2017
Winner
Schmitt + Sohn Aufzüge GmbH & Co. KG
cpvs
45214200, 45313100

The Wolfgang Kubelka secondary school in Schondorf am Ammersee is extended and rehabilitated.

As part of the overall project, a new 3-fold sports hall will be built, an existing gymnasium removed and replaced by an extension with natural science rooms and a cafeteria. In the existing building conversions, fire protection measures and energy improvements are carried out. Finally, the outdoor facilities are adjusted.

Allocation unit 200-2 passenger lift sports hall:

Lift system for 3-speed school sports hall

- Elevator suitable for disabled persons according to EN81-70 - Load capacity 630 kg or 8 persons

- 2 stops, one-sided access, doors unilaterally opening

- Portal extensions and wall enclosure frames at both entrances.

Architectural, engineering and planning services

Senckenberg Gesellschaft für Naturforschung | Published October 11, 2017  -  Deadline November 10, 2017
cpvs
71240000, 71320000

Renovation and modernization measures in the building stock.

The Senckenberg Gesellschaft für Naturforschung intends to carry out a complex reconstruction work at the research station in Weimar. The building complex consists of two interconnected houses (House A and B) as a single monument with a total area of ​​use (DIN 277: 2016) of approx. 1 900 m 2 , The planned construction measures are intended to remedy building deficiencies that directly affect the structure of the building (moisture, mold, fire protection) and measures for energy saving (roof house B, window house A, annex house A, house B) according to EnEV as well as crime prevention requirements for the protection of buildings worldwide unique collections. In addition, it is planned to modernize existing expansion areas of the collection magazines in order to create the necessary absorption capacity for the new additions of scientifically important find complexes.

Services of the object planning LPH 1 to 9 acc. § 34 HOAI 2013 as well as any special services.

Fire protection planning services LPH 1 to 9 according to AHO issue no. 17 as well as any special services.

The respective power phases according to FIG. HOAI and / or AHO of the planning services are assigned step by step in packages or individually, without any legal claim for further subcontracting. The subcontracting for single or several objects as well as single or several performance phases is subject to the availability of investment / subsidies, as well as a positive decision by the building owner on the planning design, a positive decision on the construction and the continuation of the contractual relationship. The first stage includes the LPH 1 to 3 (up to the application ZBau) and is in the position indicated in point. II.2.7).

Architectural and related services

Stadt Weil am Rhein | Published September 15, 2016
Winner
bffgmbh Architekten & Fassadenplanung
cpvs
71200000

Community school (formerly Werkrealschule) at the site Egerstraße 1 in Weil am Rhein, modernization of the overall façade. The new facade is to be brought energetically to nearly zero energy standard (vote / Default AG). Here physics and ventilation planning must be closely linked to the facade design. The constructive solution is interpreted to develop that a systematized and optimized workflow and thus the restoration are ensured during operation. The aim is the technically competent and professionally technically coordinated development of a remediation variant that can be guided by the preliminary study. It is the contractor, however, free to propose its own optimized version.

Architectural, construction, engineering and inspection services

Stadt Osterode am Harz | Published October 19, 2017  -  Deadline November 14, 2017
cpvs
71000000

The object of the contract is to award the services of the

- Object planning for buildings and interiors (§§ 33 ff. HOAI),

Performance phases 1 to 9.

The Schachtgruppenvilla is to be redesigned in the context of the municipal promotion program "Smaller Cities and Municipalities". In this process, a fundamental reconstruction of the building is aimed at in order to ensure a sustained secure use of a valuable individual feature.

Significant aspects of the renovation will be accessibility, fire safety, energy issues and compatibility with the monument protection.

Further details can be found in the document "From the History of the Schachtrupp-Villa in Osterode am Harz" and the enclosed pictures.

Railway construction works

BASF SE | Published April 29, 2017  -  Deadline June 9, 2017
cpvs
45234100

Dismantling and new construction of railways according to EBO on a length approx. 3.6 km.

- deep building measures (excavation, pile construction, protective layer PSS, drainage;

- approx. 4.3 km Rebuilding of the superstructure, incl. Points and a crossing;

- Construction of a platform, extension of two further, platform equipment;

- New construction of 4 railway junctions. Including technical assurance;

- measures on PBX systems, object protection;

- measures on electrical energy systems (point heating, power supply);

- construction work;

- Construction of the overhead contact line.

Repair and maintenance services of electrical building installations

KfW | Published June 24, 2016
Winner
Rud. Otto Meyer Technik Ltd. & Co. KG
cpvs
50711000

The KfW Bankengruppe in Frankfurt intends to employ external services maintenance services for its electrical properties. KfW performs a negotiated procedure after the VOL / A EC by for awarding maintenance services of building management with respect to the electrical engineering. The objectives associated with the legal transfer of benefits to the AN shall be as follows: obtaining the proper functioning of the contractual technical installations throughout the entire life cycle period (= life) within the contract period, full and permanent guarantee of operational reliability, safety and optimization of the quality of service from owner - and the user's perspective, sustainability of all services provided by the aN services with regard to a long life and economical operation of the technical systems, optimum energy efficiency of technical equipment.

Subject of the contract services of maintenance in and around buildings of KfW on campus in Frankfurt as well as parts in rented by the KfW buildings and land at a take care of total of currently approximately 140 000 m² of net floor area (NGF). Further information can be found on the website of KfW for sustainable office building management https://www.kfw.de/nachhaltigkeit/KfW-Konzern/Nachhaltigkeit/Nachhaltige-Unternehmensprozesse/Zentrale-Services/Facility-Management/index.htm

Engineering-design services for traffic installations

DB Netz AG | Published May 11, 2017
Winner
Inros Lackner SE
cpvs
71322500

Planning HOAI Performance phases 3, 4 according to HOAI, opt. 6, 7 for the trades Track surface construction, civil engineering, cable construction, drainage, overhead line, railway power system Berlin S-Bahn, LST, electrical energy systems, mechanical engineering, building construction engineering, construction engineering, surveying, constructional surveys, fire protection concept, sound and vibration assessments incl. Environmental protection, building technology, electromagnetic compatibility assessment.

Planning HOAI Performance phases 3, 4 according to HOAI, opt. 6, 7, PA 16 Bf. Köpenick, building project ABS Berlin- Frankfurt / O. Limit D / PL, MA1750, NT5.

Due to the changed number of passengers by the Land Berlin (customer) and the associated allocation to the planned accesses, essential planning parameters have been changed. As a result, the access situation planned in VP 2016 must be fundamentally revised. By arranging additional access in the form of a stairway system, a planning-conform planning is ensured. This additional facility is not part of the original HV performance.

Engineering services

DB Energie GmbH (Bukr 31) | Published November 9, 2017  -  Deadline December 5, 2017
cpvs
71300000

454 Aschaffenburg - Flieden, (BA 1- 4).

It is located in the federal states of Hesse and Lower Saxony.

Furthermore, the BL 456 is affected by the Thoms steel problem.

Here, the operationally required conductor cable temperature of 80 ° C + creep elongation 15 ° C should be used.

With this tender, the construction supervision services, specifically

- Construction contract / technical construction supervision engineering structures / traffic facilities / equipment technology for traffic facilities,

- Services according to construction site regulations (during execution) and

- Support for the Ecological Construction Surveillance is procured.

It is located in the federal states of Bavaria and Hesse.

Due to its age and the associated technical design to a conductor end temperature of 60 ° C, it is currently no longer the current state of the art and represents an energy supply bottleneck for the operation management.

Here, the operationally required conductor cable temperature of 80 ° C + creep elongation 15 K should be used.

With this tender, the construction supervision services, specifically

- Construction contract / technical construction supervision engineering structures / traffic facilities / equipment technology for traffic facilities,

- Services according to construction site regulations (during execution) and

- Support for the Ecological Construction Surveillance is procured.

Excavating and earthmoving work

Deutsche Bundesbank, Beschaffungszentrum | Published April 11, 2017  -  Deadline May 10, 2017
cpvs
45112000, 45232100, 45232400, 45232440

Renovation and modernization of the condominium Allendorf Str. 1-23 and 18, 20, 20a, 20b, Reinhardstr. 1-19, Kirchhainerstr. 1-11, Ulrichstr. 39-49 and 42-50 and Langheckenweg 34 (276 apartments in 44 buildings of the 1950s and 60s) with garages, underground parking, two heating units and outbuildings in 60433 Frankfurt am Main.

Furthermore, an energy renovation to be carried out, both from a technical point of view and in terms of the building envelope.

The construction work is carried out in bauabschnittsweise uninhabited state.

As part of the construction project "Rehabilitation condominium Allendorf Str., Frankfurt a. M." are 276 apartments renovated. Focus is on improving the energy efficiency of the envelope, getting and working up of quality surfaces, as well as the renewal of sanitation including the building services installation, so that the existing residential use also ensures future.

The project is divided into four sections rehabilitation as follows:

Phase 1 divided into:

BA 1.1: 10/07/2017 to 01/15/2018,

BA 1.2: 15/11/2017 to 04/27/2018.

Phase 2 is divided into:

BA 2.1: 15/03/2018 to 09/13/2018,

BA 2.2: 17/07/2018 to 12/19/2018.

Construction phase 3 divided into:

BA 3.1: 20/11/2018 to 31/05/2019,

BA 3.2: 27/03/2019 to 04/09/2019.

Construction phase 4 divided into:

BA 4.1: 16/08/2019 to 25/02/2020,

BA 4.2: 12/11/2019 to 04/06/2020.

The following services are subject of the tender "sewer rehabilitation u YEARS excavation work..":

1. TV sewer inspection u. Cleaning about 3 330 m,

2. milling about 576 m,

3. inline process approximately 1,773 m,

4. Exchange d. Basic lines approximately 261 m,

5. earthworks about 585 m³.

Central-heating installation work

Wohnungsbaugesellschaft Ingelheim Projekt GmbH & Co. KG | Published September 29, 2015  -  Deadline October 22, 2015
cpvs
45331100, 45212000, 44621200

Neuer Markt Ingelheim (NMI). New construction of a training center with music school and a cultural event hall. Construction of new facilities of the WBR in the components Continuing Education Center (WBZ), cultural and entertainment venue (KVH) and underground (TG). This is to all networks of heating and cooling, the heating and cooling surfaces and the associated boiler systems, control panels and connection to the site mains of geothermal energy. The pipelines are to be executed in the qualifications structurally necessary for ensuring of fire and noise protection.

Electrical equipment and apparatus

DB Netz AG (Bukr 16) | Published October 12, 2017
Winner
Rail Power Systems GmbH
cpvs
31600000, 34632300, 45311200

ESTW-A Mecklenbeck and Bösensell; Complete design and delivery of the electrical power plants Mecklenbeck W15, W16; 16.7 Hz supply as well as power supply systems.

ESTW-A Mecklenbeck is located on the two-track route Appelhüsen-Mecklenbeck-Münstergeist (Route 2200) - Construction planning, complete delivery and installation of electrical switchgear heating systems, power supply systems and 50 Hz energy supply to the planned construction project ESTW Mecklenbeck / Bösensell incl. Coordination and coordination with ARGE Bau, Dates, interfaces to civil engineering, cable and electrical installation work. Construction of the 16.7 Hz WHz / W16 units in the Mecklenbeck area, including control and monitoring for operational and technical acc. DB guidelines, concrete switch cabinets, In the Bf Bösensell area new power connections are planned directly from the respective power supply network.

Electricity

Stadt Bad Münder – Der Bürgermeister | Published October 17, 2015
Winner
E.ON Energie Deutschland GmbH
cpvs
09310000

Conclusion of the supply contract for the property of the town of Bad Münder in the period 01.01.2016 to 31.12.2018.

Electricity

Stadt Bad Münder – Der Bürgermeister | Published July 21, 2015  -  Deadline September 8, 2015
cpvs
09310000

An electricity supply agreement for the property of the town of Bad Münder in the period 01.01.2016 to 31.12.2018.