Public tenders for energy in Frankfurt-am-main Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyGermanyfrankfurt-am-main

Electronic equipment

DB Regio AG (Bukr 12) | Published May 6, 2017  -  Deadline May 18, 2017
cpvs
31710000, 48810000

DB Regio plans to set up a multifunctional telematics system for large parts of its rail vehicle fleets.

The multifunctional telematics system (MTS) is an IT process. It consists of a telematics server including applications (short TS) to which a large number of on-board telematics systems (BTS for short) are connected by mobile phone connection on the vehicle side.

The procurement project for the establishment of the MTS comprises the procurement of the BTS and the procurement of the technical management services for MTS and BTS.

The on-board telematics systems are to be purchased and made available to the supplier as a service provider.

With the acquisition of the MTS, DB Regio pursues the following objectives:

Reduction of energy consumption and CO2 emissions,

Satisfaction of customers and employees,

Operational excellence

The number of BTS to be delivered can only be determined after the contract has been awarded, as it depends on the achievement and acceptance of the MTS.

The DB Regio plans to install up to 1,200 BTS by the end of 2017 and is therefore dependent on short delivery times.

The total procurement value over the contract period is planned to be between EUR 0 and EUR 8 million.

Purchase of on-board telematics systems and their technical operation management.

Heating, ventilation and air-conditioning installation work

Hochbauamt | Published November 14, 2017  -  Deadline December 13, 2017
cpvs
45331000

Heater.

Production of a gas supply system for heating the school and for the new kitchen to be constructed on the ground floor with a gas connection value with a total nominal load of approx. 265 kW.

Gas condensing boiler plant for the supply of the central ventilation unit, the fresh water station and for heating (nominal heat input 186 kW).

- Exhaust system with chess system F-90 for condensing boilers Length approx. 17 m

- Heating buffer 1 500 liters

- Split-type compact distributor for 6 heating groups with fittings and pumps

- Distribution lines Basement and risers made of black steel pipe.

- Connecting pipes and distribution pipes Bullets in C-steel pipe system.

- Approx. 93 pieces of radiators as heating plates and tubular radiators

- Approx. 8 pieces of energy-saving radiant ceiling panels for the sports hall.

Railway construction works

DB Netz AG (Bukr 16) | Published November 16, 2017
Winner
Vergabekammer des Bundes
cpvs
45234100

Breisgau S-Bahn 2020, line 4300 - Höllentalbahn West, Bautechnik.

- Barrier-free extension of 6 stations (platform length: 210 m, height: 55 cm above rail level, platform equipment),

- 50Hz in the stations (proportionate lighting and power supply of lighting),

- Structural engineering on the open track 4 300 W (culverts) and in the railway stations (pedestrian underpass, elevator shafts, roof and staircase adjustments),

- superstructure, roadbed and underground cable including cable laying on the open track (about 300m) and in the stations (7 stations affected),

- construction technique for level crossings incl. Roads, civil engineering and superstructure services (7 affected level crossings),

- Construction engineering for the LST systems (foundations and posts for signals, outdoor facilities for 3 modular buildings - access roads, parking lots, etc.),

- Decommissioning of the signal external systems and proportionately the electr. Energy systems (point heating).

Multifunctional telematics system for DB Regio AG rail vehicles

Deutsche Bahn AG TEE - Beschaffung Schienenfahrzeugersatzteile | Published May 5, 2017  -  Deadline May 18, 2017
cpvs
31710000, 48810000

DB Regio plans to set up a multifunctional telematics system for large parts of its rail vehicle fleets. The multifunctional telematics system (MTS) is an IT process. It consists of a telematics server including applications (short TS) to which a large number of on-board telematics systems (BTS for short) are connected by mobile phone connection on the vehicle side. The procurement project for the establishment of the MTS comprises the procurement of the BTS and the procurement of the technical management services for MTS and BTS. The on-board telematics systems are to be purchased and made available to the supplier as a service provider. DB Regio is pursuing the following objectives with the procurement of the MTS: reduction of energy consumption and CO2 emissions, satisfaction of customers and employees, operational excellence The number of BTS to be delivered can only be determined after the contract has been awarded, as it depends on the achievement and acceptance of the MTS is. The DB Regio plans to install up to 1,200 BTS by the end of 2017 and is therefore dependent on short delivery times. The total procurement value over the term of the contract is planned to be between € 0 and € 8 million. Germany

Railway construction works

DB Netz AG (Bukr 16) | Published October 27, 2017  -  Deadline December 20, 2017
cpvs
45234100, 45213321, 45234116

Routes and station extension of route 4300 between Neustadt and Donaueschingen.

- barrier-free extension of 7 stations (platform length: 210m, height: 55cm above railroad platform, platform equipment)

- 50Hz in the stations (proportionate lighting and power supply of the lighting)

- Constructive engineering on the free section 4300O (8 passages, 2 support walls) and in the railway stations (2 elevator shafts, Bf Neustadt)

- superstructure, railway track and cable structure including cable laying on the open line (about 10 600 m) and in the railway stations (7 stations concerned)

- Construction technology for railway transitions including roads, civil engineering and superstructure services (8 affected railway transitions)

- Construction technology for the LST systems (foundations and posts for signals, outdoor installations for 3 modular buildings - access, parking lots, etc.)

- dismantling of the signaling systems and the proportion of the electr. Energy systems (point heating).

Construction supervision services

DB Netz AG (Bukr 16) | Published September 23, 2017  -  Deadline October 19, 2017
cpvs
71520000, 71311230, 71521000

S 6 first stage, 4 - track extension Frankfurt (M) West - Bad Vilbel (construction supervision services).

Track of the 12.6 km long track.

In the course of the 4-track development between Frankfurt (Main) West and Bad Vilbel the S-Bahnstrecke

3684 in parallel to the existing line 3900.

BÜW office, ...):

- Provision of BÜW office and premises over the entire construction period;

- civil engineering, superstructure 12 km extension of the line (2 suburban railroad tracks and 2 subway tracks), 25 turnout construction, installation of 15 construction points;

- Structural Engineering (EÜ Homburger Strasse, EÜ Niddabrücke, EÜ) At the Wiesengarten shares S6 and Brückenprogramm, temporary bridge over the Nidda in Harheim, EÜ BAB 661, FRÜ at the Grundig Graben, EÜ Weg am Friedhof, FRÜ Batschkap, EÜ Niedwiesenstraße S 6 and bridge construction program , EÜ Ginnheim Building, EÜ Woogstraße, EÜ Reichelstraße, EÜ Bockenheim, auxiliary bridge installation, new construction of the supporting walls 1 to 17 point heating stations W 1, W2, W301 and W 3;

- Preliminary measures Cable construction in the run-up to the start-up of the construction points 46 and 47 in Bad Vilbel in December 2017;

- Preliminary measures for the implementation of the construction of Softs 46 and 47 in Bad Vilbel in December 2017 and the construction of soils 78 and 79 in March 2018;

- noise barriers;

- traffic stations Bad Vilbel, Bad Vilbel South, Berkersheim, Frankfurter Berg, Eschersheim, HP Ginnheim, accesses and pedestrian underpass Bad Vilbel Süd;

- transmission of telecommunications lines;

- laying of Vodafone cables;

5 signal boom;

- Detention BÜ 101;

- Suspension 102 and replacement by EÜ Am Lachweg;

- System Agreement Thales;

- System contract Siemens;

- Overhead line overhaul to 12 km.

Scope Lot 1 = all services to be monitored which are not to be separated to lots 2-6.

Qualification / trades:

Head of Construction Supervision Center / Commissioning, Assistant and Documentation, Construction Operational Planning and Betra Applications, Waste / Ecology / Soil / Hydrology, Surveying, Planning / Planning / Eplass, Supplementary Management / Billing, SiGeKo and Welding Supervision.

In addition, the following functionalities are required for construction monitoring services:

MKS;

Security systems;

BÜB Elektrotechnik - Ril 046.2757 - Construction Supervision Railway Department Electrical engineering for railway power supply, OLA, 50Hz, E + M and electrical energy;

BÜB TK - Ril 046.2758 - Bauüberwacherbahn TK Subject area Telecommunications;

TK).

The application can be downloaded free of charge from DB AG's portal at: https://bieterportal.noncd.db.de/portal/.

Development of the LBP measures along the route (12 km):

Qualification / trades:

Head of Construction Supervision Center / Commissioning, Assistant and Documentation, Construction Operational Planning and Betra Applications, Waste / Ecology / Soil / Hydrology, Supplementary Management / Billing and SiGeKo.

In addition, the following functionalities are required for construction monitoring services:

TK);

The application can be downloaded free of charge from DB AG's portal at: https://bieterportal.noncd.db.de/portal/.

Construction of the EÜ Niedwiesenstraße within the framework of the LUV project (railway link) under the new S-Bahn railway lines:

Qualification / trades:

Head of Construction Supervision Center / Commissioning, Assistant and Documentation, Construction Operational Planning and Betra Applications, Surveying, Planning / Plan Inspection / Eplass, Supplementary Management / Billing, and SiGeKo.

In addition, the following functionalities are required for construction monitoring services:

MKS;

Security systems;

BÜB Elektrotechnik - Ril 046.2757 - Construction Supervision Railway Department Electrical engineering for railway power supply, OLA, 50Hz, E + M and electrical energy;

BÜB TK - Ril 046.2758 - Bauüberwacherbahn TK Subject area Telecommunications;

TK).

The application can be downloaded free of charge from DB AG's portal at: https://bieterportal.noncd.db.de/portal/.

New construction of the EÜ Wiesengarten as part of the LUV project bahnlinks under the new S-Bahn railway lines:

Qualification / trades:

Head of Construction Supervision Center / Commissioning, Assistant and Documentation, Construction Operational Planning and Betra Applications, Surveying, Plan-Run / Plan-Check / Eplass, Supplementary Management / Billing and SiGeKo.

In addition, the following functionalities are required for construction monitoring services:

MKS;

Siche-insurance technology;

BÜB Elektrotechnik - Ril 046.2757 - Construction Supervision Railway Department Electrical engineering for railway power supply, OLA, 50Hz, E + M and electrical energy;

BÜB TK - Ril 046.2758 - Bauüberwacherbahn TK Subject area Telecommunications;

TK).

The application can be submitted free of charge

Tiling work

Hochbauamt | Published January 17, 2017  -  Deadline March 7, 2017
cpvs
45431000

Tile installation.

The existing school building is completely renovated. The renovation includes the fire protection and energy upgrading, renovating the entire interior area with the gym and the installation of an elevator. In the basement, the floor plate, the ceiling will be renewed in some areas, open to EC and built a staircase. The existing temporary roof will be canceled and replaced by a new attic in wood construction. Since the existing ceiling is not viable for a school use on the top floor (floor attic), a laminated timber ceiling is on a new steel girder grid mounted. The outbuilding is converted into a kiosk.

The existing school building is built in solid construction and has a floor area of ​​approximately 1 835 m 2 , The eave height is about 20.70 m; the new First height is about 28.00 m. The annexe has a floor area of ​​approximately 113 m 2 , The eaves height is approximately 3.50, the ridge height approximately 5.00 m.

The work will be in several sections, partly. With small surfaces, running on all floors (5 levels). The execution period extends over about 16 months.

Tile installation:

about 2 300 meters 2 Underground (cement or asphalt screed, walls GK plates or plaster.) Clean;

400m 2 Troweling plaster wall surfaces;

ca. 850 m 2 Spatulas bottom surfaces;

approximately 650 m 2 Composite waterproofing;

about 1 300 meters Fugendichtband;

about 900 meters 2 Wall tiles;

about 1 200 meters 2 Floor tiles;

about 150 m marble windowsills and -Abdeckplatten;

850 m base tiles.

Installation of doors and windows and related components

Deutsche Bundesbank, Beschaffungszentrum | Published January 21, 2017  -  Deadline February 28, 2017
cpvs
45421100

The construction work is carried out in bauabschnittsweise uninhabited state.

Focus is improving the energy efficiency of the envelope, getting and working up of quality surfaces, as well as the renewal of sanitation including the building services installation, so that the existing residential use will also be ensured in the future.

The project is divided into four sections rehabilitation as follows:

Phase 1 is divided into:

BA 1.1: 10.07.2017 to 23.01.2018;

BA 1.2: 15.11.2017 until 07.05.2018.

Phase 2 is divided into:

BA 2.1: 15.03.2018 to 09.21.2018;

BA 2.2: 17.07.2018 until 01.09.2019.

Bauabschnitt 3 is divided into:

BA 3.1: 20.11.2018 to 11.06.2019;

BA 3.2: 27.03.2019 until 09.12.2019.

Bauabschnitt 4 divided into:

BA 4.1: 16.08.2019 to 03.04.2020;

BA 4.2: 12.11.2019 until 06.22.2020.

The following services are subject of the tender "window and sunscreen work":

Dismantling / Disposal:

4490 m² Bestandsfenster- / doors;

345 m² staircase windows;

Ringer / letterbox system;

Shutter boxes;

6965 m indoor windowsills and Leibungsverkleidungen;

Exterior window sills cast stone.

Manufacture / supply / installation:

4490 m² assembly 3-glazed plastic windows and doors (with tw Fensterfalzlüfter.);

345 m² assembly 3-glazed plastic windows - staircase;

Ringer / letterbox system;

Assembly mounted roller shutter box system;

Mounting indoor window sill made of wood materials;

Mounting indoor window sill of wooden materials - staircase;

Installation outer windowsill artificial stone;

Installation outer windowsill fiber concrete blocks;

Installation outer sill aluminum;

Interior insulation.

Lifts

Handwerkskammer Frankfurt-Rhein-Main | Published December 16, 2016
Winner
Thyssen Krupp Aufzüge GmbH
cpvs
42416100

The Chamber of Frankfurt-Rhein-Main has mandated the supply and installation of elevators for the new building of the boarding school for the training and technology center in Weiterstadt.

The elevators will be installed in the four-story building, the (66 mx 11 m) is planned in massive construction as bolt-like building.

Intended elevator work

- Site equipment, protective measures;

- 2 lifts, per 1 000 kg after earthquakes Category 1;

- An engine-less elevator concept;

- The drive motor is to be disposed within the shaft head;

- The assessment of the engine, at least 180 trips / hour;

- Electronic microprocessor control as one-button collective control;

- External operating caste / Service panel bottom landing;

- Fire control;

- Stand-by mode, and learning function of the controller;

- The energy efficiency class must be demonstrated.

Quantities:

- 2 lifts, per 1 000 kg after earthquakes Category 1;

- 1. PA: Delivery height: 3.50 m, Number of stop: 3, number of doors: 3 (2/1 opposite) control: one-button collective control;

- 2. PA: Delivery height: 9.80 m, Number Maintenance: 4, Doors: 4 (4 superimposed).

IT services: consulting, software development, Internet and support

Süwag Grüne Energien & Wasser GmbH | Published January 18, 2017  -  Deadline February 14, 2017
cpvs
72000000, 72200000, 72210000, 72212100, 72212462, 72212519

The project Enervator must examine the objective, the integrated control and linking of electrical and thermal loads, electricity storage and local electricity and heat production in district power station "Am Main View" in Kelsterbach. Moreover, the economic potential will be evaluated by electricity procurement and marketing optimization of district power stations in the network.

For this, about 50 of the 180 households of the residential area be integrated based on intelligent predictions in the energy supply concept by active control. In the latest generation households digital electricity meters, including the communication unit Smart Meter Gateway (SMGW) be installed for data acquisition and control of loads. Moreover, these households are equipped with smart home system to allow the control of various devices.

The objective is the development, testing and application of the following new technologies:

- Use of smart metering and SMGW in households for the acquisition and processing of high-resolution data. Providing more flexible tariff plans for consumers based on the individual site power generation.

- Testing of automated and encrypted data evaluation SMGW by BSI (Bundesamt für Sicherheit in der Informationstechnik) guidelines.

- Testing of active consumer control of a smart home system in households.

- Development of a higher-level controller architecture, the consumption and production in the district power station coordinates co (heat and electricity).

- Integration of E-Mobility in the concept Quartier power plant, evaluation of a bidirectional charging infrastructure.

- Conceptual testing of automated digital billing methods.

Construction work for school buildings

Magistrat der Stadt Frankfurt am Main | Published November 22, 2016  -  Deadline December 16, 2016
cpvs
45214200

Intended acquisition of land for the operation of schools and daycare centers.

2 GWB not comply.

Intended acquisition of land for the operation of schools and daycare centers.

The city of Frankfurt therefore asks landowners suitable sites to offer this the city of Frankfurt to acquire or for lease or rent, whether it is undeveloped or developed land and whether construction and renovation work on these properties are required.

However, it is specifically requested to offer also such plots, so that the city of Frankfurt can optionally initiate an appropriate procurement procedures.

The conditions for a suitable property are as follows:

- The plot size has more than 2 000 m 2 be.

- The plot should be connected to the public transport system.

- The plot must be opened up potential development or sense in terms of sanitation and the media water and energy.

- The plot should immediately, however, maximum available until 31.12.2017.

- The land must not be burdened with legacy or other contamination.

Seveso III region, or within the noise zone. 1 and 2

The owner of the land or land that meets the above conditions shall apply in the event of a sale, or rental Verpachtungsgesellschaft intention, please contact the City of Frankfurt,

grundstuecksangebote.amt40@stadt-frankfurt.de

or by mail to:

Municipality of the City of Frankfurt,

Stadtschulamt -40.42.1-

Seehofstraße 41,

60594 Frankfurt am Main.

Post offers please not later than

15/12/2016

to said e-mail or postal address.

Architectural, engineering and planning services

Deutsche Bundesbank, Beschaffungszentrum | Published June 17, 2016
Winner
agn smp GmbH
cpvs
71240000

The condominium Hauff-, Lenau-, Uhland Street in 61440 Oberursel no longer conforms to the requirements of the technical installations and energy saving, and the fire must be checked. Therefore, the German Federal Bank is planning the rehabilitation and modernization of this plant. Main goal is the optimization of the housing stock by energetic, technical and baukonstruktive rehabilitation with improvement of fire, sound and thermal insulation, and upgrading of technical building equipment.

The buildings were built in 1950 as a two-storey apartment building in solid construction with plastered facade. In 3 blocks with eight doorways total of 30 units are housed. The total living area is approximately 1663 m 2 , In recent years, made some necessary conservation measures, a comprehensive modernization has not been carried out.

The outer wall dimensions are 30 cm. The ceilings are reinforced concrete, completed the basement stairs in wood constructions.

It is planned to carry out the construction project in partially unoccupied state in several successive stages. Proposed construction schedule to be developed by the planners as alternatives. Inventory documents are made available to planners in dwg format.

The German Bundesbank intends to award the work phases 2-9 HOAI. Here it reserves the gradual award of individual performance phases, depending on the further approval of the implementation of the project. First, the work phases 2 and 3 of the HOAI be awarded, depending on the further approval of the implementation of the project and the other work phases are to be commissioned. A legal claim for additional assignment is not. The project language is German. Information about technical office equipment (CAD and AVA). Standard of the Deutsche Bundesbank is AutoCAD 2012, AVA-GAEB XML interface.

Engineering design services

Deutsche Bundesbank, Beschaffungszentrum | Published June 10, 2016
Winner
CSZ Ingenieurconsult Cornelius-Schwarz-Zeitler GmbH
cpvs
71320000

The condominium Hauff-, Lenau-, Uhland Street in 61440 Oberursel no longer conforms to the requirements of the technical installations and energy saving, and the fire must be checked. Therefore, the German Federal Bank is planning the rehabilitation and modernization of this plant. Main goal is the optimization of the housing stock by energetic, technical and baukonstruktive rehabilitation with improvement of fire, sound and thermal insulation as well as the modernization of the technical building equipment.

The buildings were built in 1950 as a two-storey apartment building in solid construction with plastered facade. In 3 blocks with 8 doorways total of 30 units are housed. The total living area is approximately 1663 m 2 , In the back-years, made some necessary conservation measures, a comprehensive modernization has not been carried out.

The outer wall dimensions are 30 cm. The ceilings are reinforced concrete, completed the basement stairs in wood constructions.

It is planned to carry out the construction project in partially unoccupied state in several successive stages. Proposed construction schedule to be developed by the planners as alternatives. Inventory documents are made available to planners in dwg format.

The German Bundesbank intends to award the work phases 2-8 HOAI. Here it reserves the gradual award of individual performance phases, depending on the further approval of the implementation of the project. First, the work phases 2 and 3 of the HOAI be awarded, depending on the further approval of the implementation of the project and the other work phases are to be commissioned. A legal claim for additional assignment is not. The project language is German. Information about technical office equipment (CAD and AVA). Standard of the Deutsche Bundesbank is AutoCAD 2012, AVA-GAEB XML interface.

Architectural, engineering and planning services

Deutsche Bundesbank, Beschaffungszentrum | Published December 19, 2015  -  Deadline January 15, 2016
cpvs
71240000

The condominium Hauff-, Lenau-, Uhland Street in 61440 Oberursel no longer conforms to the requirements of the technical installations and energy conservation, and the fire must be checked. Therefore, the German Bundesbank is planning the rehabilitation and modernization of this plant. Main objective is the optimization of the housing stock by energetic, technical and baukonstruktive rehabilitation with improvement of the fire, sound and thermal insulation, as well as the modernization of the technical building equipment. The buildings were constructed in 1950 as a two-storey apartment building in solid construction with plastered facade. In three blocks with eight doorways total of 30 accommodation units are housed. The total living area is approximately 663 m2 1. Over the past few years-made some necessary conservation measures, a comprehensive modernization has not been carried out. The outer wall dimensions are 30 cm. The ceilings are in reinforced concrete, completed the basement stairs in wooden structures. It is planned to carry out the construction project in partially unoccupied state in several successive stages. Proposed construction schedule must be worked out by the planners as alternatives. Inventory documents are made available to planners in DWG format. The German Bundesbank intends to award the work phases 2-8 HOAI. Here, it reserves the gradual award of individual performance phases, depending on the further approval of the realization of the project. First, the work phases 2 and 3 of the HOAI be awarded, depending on the further approval of the realization of the project and the further work phases are to be commissioned. A legal claim to further assignment does not exist. The project language is German. Information about technical office equipment (CAD and AVA). Standard of the Deutsche Bundesbank is AutoCAD 2012, AVA-GAEB XML interface.

Engineering-design services for traffic installations

DB Netz AG (Bukr 16) | Published April 15, 2017  -  Deadline May 15, 2017
cpvs
71322500

ABS Berlin-Dresden, the second stage of expansion, sections Blankenfelde (a) - Wünsdorf (a) and Elsterwerda (s) - Grossenhain Berliner Bf (s); Planning services.

The construction project 2.Baustufe involves the continuous increase in the speed to 200 km / h in the sections Blank fields (a) - Wunsdorf (a) and Elsterwerda - Großenhain Berlin Bf to Schedule action in these sections are the expansion / renewal of the superstructure, chassis and. engineering structures, equipment with electronic interlocking technology and ETCS equipment of lines with new overhead line systems and telecommunications technologies and the elimination of level crossings. There are interfaces to the first stage of construction which is already being realized, as well as of DB Station & Service AG and DB Energie GmbH.

Creating the preliminary design for the portions 1.1 Blank fields (a) - Rangsdorf (a), 1.2 Rangsdorf (a) - Zossen (a) and 1.3 Zossen (a) - Wunsdorf (a) for the project planning transport systems, object and structural engineering civil engineering structures, railway Technical equipment (15 kV overhead line systems, control and safety systems, telecommunications systems, electrical power systems, electric switch heaters) and in landscape planning services.

Creating the preliminary design for the portion 3 Elsterwerda (e) - Großenhain Berlin station (s) for the project planning transport systems, object and structural engineering civil engineering structures, railway equipment (15 kV overhead line systems, control and safety systems, telecommunications systems, electrical energy systems, electrical switch heaters) and in landscape planning services.

Construction work for pipelines, communication and power lines

Deutsche Bundesbank, Beschaffungszentrum | Published April 20, 2017
cpvs
45231000

Renovation and modernization of the condominium Allendorf Str. 1-23 and 18, 20, 20a, 20b, Reinhardstr. 1-19, Kirchhainerstr. 1-11, Ulrichstr. 39-49 and 42-50 and Langheckenweg 34 (276 apartments in 44 buildings of the 1950s and 60s) with garages, underground parking, two heating systems, two combined heat and power solutions and outbuildings in 60433 Frankfurt am Main.

Furthermore, an energy renovation to be carried out, both from a technical point of view and in terms of the building envelope.

The construction work is carried out in bauabschnittsweise uninhabited state.

1. Removal: Unlocking power for the purpose of disassembly of cables and wires;

2. Removing installation pipes, cable ladders, risers, meter cabinets, flat switch-telecommunications distribution, installation equipment;

3. renewal of the house box connectors for 276 WE with garages;

4. Electrical Installations house connections to the meter cupboard for 44 buildings;

5. 44 pcs. Electric meter cabinets;

6. 44 pcs. House connections;

7. Electrical installation meter cabinet to the power distribution panel for 44 buildings;

8. Ca. 309 electric counter;

9. Electrical installations of power distribution to the consumer;

10. Ca. 1280 changeover switch;

11. Ca. 700 AC switch as wall for damp locations;

12. Ca. 366 series switch;

13. Ca. 600 change-over switch;

14. Ca. 300 switch;

15. Ca. 6400 sockets;

16. Ca. 290 Telephone and about 278 broadband connections.

17. cabling cogeneration;

18 complete cabling;

19 routing of lines up / flush;

20. Lighting Outdoor conditioning and underground parking.

Excavating and earthmoving work

Deutsche Bundesbank, Beschaffungszentrum | Published May 19, 2017
cpvs
45112000

Renovation and modernization of the residential complex Allendorfer Str. 1-23 und 18, 20, 20a, 20b, Reinhardstr. 1-19, Kirchhainerstr. 1-11, Ulrichstr. 39-49 and 42-50 and Langheckenweg 34 (276 apartments in 44 buildings of the 1950s and 60s) with garages, underground parking, two heating centers and outbuildings in 60433 Frankfurt am Main.

Furthermore, an energy-related renovation is to be carried out, both in technical terms and in relation to the building envelope.

Construction work is carried out in an unfamiliar state.

The project is divided into four redevelopment sections as follows:

Building section 1 divided into:

BA 1.1: 10.7.2017 to 15.1.2018,

BA 1.2: 15.11.2017 to 27.4.2018.

Building section 2 divided into:

BA 2.1: 15.3.2018 to 13.9.2018,

BA 2.2: 17.7.2018 to 19.12.2018.

Building section 3 divided into:

BA 3.1: 20.11.2018 to 31.5.2019,

BA 3.2: 27.3.2019 to 4.9.2019.

Section 4 is divided into:

BA 4.1: 16.8.2019 to 25.2.2020,

BA 4.2: 11.12.2019 to 4.6.2020.

The following services are the subject of the tender: "Sewer rehabilitation and related excavation work":

1. TV-Kanalbefahrung and cleaning approx. 3 330 m,

2. Milling work approx. 576 m,

3. Inliner method approx. 1 773 m,

4. Replacement of the basic cables approx. 261 m,

5. Earthworks approx. 585 m 3 ,

Miscellaneous medical devices and products

Bürgerhospital und Clementine Kinderhospital gGmbH | Published November 3, 2017  -  Deadline December 7, 2017
cpvs
33190000

New building to house a surgical department, a maternity ward and nursing departments for the Department of Neonatology and the Department of Gynecology. Creation of car parking spaces and additional secondary areas (changing rooms, archives and storage areas). Restructuring Station N4 to a Neonatal Intermediate Care Station. Relocation of the nursing area of ​​the clinic for neonatal, pediatric surgery and urology. Reorganization and structuring of the food supply and the entire logistics concept at the Bürgerhospital.

Tray 612. TL 3, TL 4 and TL 6

for the area of

6 surgeries plus ancillary rooms on the 1st floor

Operating room on the 2nd floor

Maternity ward on the 3rd floor

Neoantologie in the 4th OG

Nursing station on the 5th floor for both PKV and GKV patents from the field of obstetrics

CSSD on the 6th floor

Gross amounts:

Teillos 03 - Medical devices

- 24 pieces suction,

- 1 piece surgical drill,

- 8 pieces bottle warmer,

- 4 pieces HF electrosurgical unit,

- Energy commercial refrigerators,

- 19 pieces O2 sampling devices with flow meter, oxygen mixing device,

- Digital baby scales, heat radiators, changing tables.

Teillos 04 - Medical furniture

- 7 pieces dumpster mobile ',

- 9 pcs OP-Hcker,

- 28 pieces infusion stand,

- 6 pieces of instrumentation,

- 26 pieces of care chairs, etc.

Teillos 06 - Medical care and treatment trolley

- 4 piece container wagon (delivery room),

- 43 pieces of various care and treatment cars.

Supply of the sewage treatment plant Flörsheim with regeneratively generated electrical energy in the Syna medium voltage network, but measuring voltage is low voltage.

Abwasserverband Flörsheim | Published June 1, 2017
cpvs
65300000

Joinery work

Hochbauamt | Published February 16, 2017  -  Deadline April 4, 2017
cpvs
45421000, 45421131, 45421111

Joinery, interior doors wood.

The existing school building is completely renovated. The renovation includes the fire protection and energy upgrading, renovating the entire interior area with the gym and the installation of an elevator. In the basement, the floor plate, the ceiling will be renewed in some areas, open to EC and built a staircase. The existing temporary roof will be canceled and replaced by a new attic in wood construction. Since the existing ceiling is not viable for a school use on the top floor (floor attic), a laminated timber ceiling is on a new steel girder grid mounted. The outbuilding is converted into a kiosk.

The existing school building is built in solid construction and has a floor area of ​​approximately 1835 m². The eave height is about 20.70 m; the new First height is about 28.00 m. The annexe has a floor area of ​​approximately 113 m², the eaves height is approximately 3.50, the ridge height approximately 5.00 m.

Work will, with greater zeitl. Interrupt that is not remunerated separately carried out in three phases. The benefits extend across all floors (5 levels). The execution period extends over approximately 12 months.

Joinery doors and glass elements inside:

25 pcs. Interior doors with wooden Stockzarge, partly. M. Glass cut;

50 pcs. Interior doors wooden solid walls;

about 7 pcs. Interior doors wood with fire protection requirements T30 / T30RS;

20 pcs. Interior doors wood with fire protection requirements DS;

approx 28 pcs. Doors with Umfassungszargen o fire protection requirements.

15 pcs. Doors zweiflgl. With u without Brandschtzanforderungen.

40 pcs. Door elements one to mehrflügl. In corridors;

15 pcs. Glass partition elements m. Door leaves room height / -broad;

about 1 pc. historical door replica (Aula access);

about 4 pcs. Arc segments about 3.5 x 0.52 to 1.29 m;

200 pcs. Door stopper.