Call +44 800 9755 164

Public tenders for energy in Erlangen Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Sewage Treatment Plant Erlangen - new energy center VE 2030 demolition work lot 1

Entwässerungsbetrieb der Stadt Erlangen (EBE) | Published March 29, 2017  -  Deadline May 4, 2017
cpvs

Identification of the job: WWTP Erlangen, new energy center, VE 2030 demolition work lot 1 award number: VE 2030

Sewage Treatment Plant Erlangen - new energy center VE 4150 low pressure gas containers

Entwässerungsbetrieb der Stadt Erlangen (EBE) | Published April 12, 2017  -  Deadline May 18, 2017
cpvs

I.1 Entwässerungsbetrieb of Erlangen, Shoe Straße 30, 91052 Erlangen Phone: 09131/86 29 32 Fax: 09131/86 26 61 E-mail: entwaesserungsbetrieb@stadt.erlangen.de, Internet: www.erlangen.de further information and information for requests for documents: EU Official Journal: www.simap.europa.eu Internet of Erlangen: https://www.erlangen.de/desktopdefault.aspx/tabid-1133/603_read-33864/

Sewage Treatment Plant Erlangen - new energy center VE 4160 gas system

Entwässerungsbetrieb der Stadt Erlangen (EBE) | Published April 12, 2017  -  Deadline May 18, 2017
cpvs

I.1 Entwässerungsbetrieb of Erlangen, Shoe Straße 30, 91052 Erlangen Phone: 09131/86 29 32 Fax: 09131/86 26 61 E-mail: entwaesserungsbetrieb@stadt.erlangen.de, Internet: www.erlangen.de further information and information for requests for documents: EU Official Journal: www.simap.europa.eu Internet of Erlangen: https://www.erlangen.de/desktopdefault.aspx/tabid-1133/603_read-33865/

Sewage-treatment plant construction work

Entwässerungsbetrieb der Stadt Erlangen | Published April 12, 2017  -  Deadline May 18, 2017
cpvs
45252100, 45252130

New energy plant with cogeneration, energy storage, social and sanitary facilities, as well as sludge dewatering and sludge water treatment (Deammonification).

Supply and installation of:

2 pcs low-pressure gas reservoir 4,000 meters 3 50 mbar, with accessories.

079/755 826-65 IISB Erlangen extension B Building Automation

Fraunhofer-Gesellschaft e.V. - Vergabestelle Bau | Published April 11, 2017  -  Deadline May 9, 2017
cpvs

Approx. 1St; intrusion of motor BSK's: extension of an existing building control company Honeywell EBI: 2200 information points;:; reinstalling information points (ISP) about 7 St. Conversion of an existing information center of gravity. Mot 90. BSK; data dot peripheral DDC (physically): 1100 DP; reinstall the cabinet: about 16 cabinets; data transfer protocol ISPs: BACnet protocol / IP; data transfer protocol GLT: BACnet protocol / IP, network connectivity ISPs in stock: LAN network; intrusion energy meters: 45 energy Meter Modbus / IP; intrusion 612 research PLC: about 3 BACnet / IP Sauter connections

Sewage-treatment plant construction work

Entwässerungsbetrieb der Stadt Erlangen | Published March 29, 2017  -  Deadline May 4, 2017
cpvs
45252100, 45111100

Construction of the power station with cogeneration, energy storage, social and sanitary facilities, as well as

Sludge dewatering and sludge water treatment (Deammonification).

Partial demolition nacelle 1

Year: 1956

Extensions: 1971, 1983 and 1990

Nacelle: basement and ground floor

Control room and social areas: basement, ground, upper floor and attic

RS-Pumwerk / lifting plant biology: Basement

Stahlbetonsekelett with lining

Gabled roof (roof trusses made of wood with tiles coverage)

Facade with corrugated metal cladding and insulation KMF

43 x 17 x 12 m

16 x 17 x 7 m

The nacelle 1 comprises the functional units

- control room sewage treatment plant;

- buildings for sewage plant personnel;

- CHP: 3 gas engines, three steel chimneys, heat storage, etc .;

- Medium Voltage 20 kV: 2 transformers, switchgear MSP;

- low-voltage switchgear;

- RS-pump station / lifting plant biology;

- trickling filter pump station.

1.5 m below ground are canceled.

Before the actual demolition work, the components of Technology

to dismantle equipment and electrical and household wiring and the

deep basement (lifting plant biology / RS-pumping station, pumping station trickling filter)

for reasons of upward pressure reliability with lagerndem on site soil

to fill.

The building known pollutants:

TRGS 521);

- asbestos rope seals between the outer wall and exhaust pipe gas engine

Total Demolition New Energy Source

Year: 1983

Extensions: 1998 and 2006

45 x 7 x 6 m

Construction: reinforced concrete frame with brick lining

Pent roof (roof trusses made of wood with asbestos cement corrugated sheets)

The New Energy Center includes the functional units

- fan chamber 1;

- oil storage;

- medium voltage 6 kV: 4 transformers, switchgear MSP;

- low-voltage switchgear.

The building known pollutants:

- roof support made of asbestos cement corrugated sheets;

TRGS 521).

  • 1