Architectural, engineering and planning services

Abwasserverband Goldener Grund | Published November 11, 2016  -  Deadline December 8, 2016

The existing treatment plant Niederbrechen with a current interpretation for 27 000 pe is to be expanded in terms of terminal size, supplemented and modernized. They must have: construction of aeration, secondary sedimentation and digestion including energy recovery and rehabilitation of rakes, sand traps, CSO and drainage.. For this design, tendering and construction management are carried out. Since a building in existing and during operation is necessary, the upgrading steps need to be well coordinated and carried out in successive phases. . The following essential basic services and special services in accordance with HOAI be requested:

- Engineering services of engineering structures;

- Site supervision for performance image of Structures;

- Engineering of process equipment;

- Engineering of Instrumentation and Control Technology.

The engineering services are commissioned gradually.

Scheduling: design until May 2017 tender by the end of 2018. Construction: 2018 to the 2021st

Offered Services Project planning engineering structures: basic services in accordance with § 43 HOAI for performance phases 1-9,

Site supervision to power stage 8 in the power image of Structures,

Offered Services Technical equipment for mechanical engineering in accordance with § 55 HOAI for performance phases 1-9.

Offered Services Technical equipment for electrical engineering in accordance with § 55 HOAI for performance phases 1-9.

Engineering design services for mechanical and electrical installations for buildings

Schulverband Hohenroth, vertreten durch VG Bad Neustadt | Published November 17, 2016  -  Deadline December 20, 2016

Engineering services - Building Services for overhaul and partial reconstruction of the Edmund-Grom School in Hohenroth

The main focus of the remediation form the fire protection exercise, and the general safety, required renovation of the building, HLS, ELT

It is intended to handle the renovation and construction phases as well as a part of new building. Outdoor components meet partially the current requirements of the ENEV

build adaptation to barrier-free,

Surfaces / Volume:

HNF 4500 m 2 , WHP 6 000m 2 , BRI school 19 200m 3 , Gym 3 800m 3 , 3.BA. Renovation stock 7 200 m 2 ,

Costs:

According to the current cost estimate of total cost of approximately two million EUR net (kgr. 400 Din 276) is assumed.

Events:

Starting performance:. Febr 2017th

Grant application to the funding authority: spring 2017th

It is intended with this position to rely on the following benefits (in stages):

Projekplanung Technical Equipment - HLS - ELT, Phases 3-9 in accordance with §§ 55 HOAI.

Engineering services technical equipment HLS -ELT for the refurbishment and reconstruction of the Edmund-Grom- elementary and middle school Hohenroth

in portions, reorganization of functions, new expansion, rehabilitation of the remaining inventory,

static restoration, partly Energy renovation, fire protection adaptation, address safety technical deficiencies,

Restoration TGA HLS - ELT.

Services of engineers, performance phase 3-4, 5-9 to § 55 HOAI.

Commissioning of power phases in sections,

4500 m 2 , GFA: 6000 m 2 , BRI: School 19 200 m 3 - Gym 3800 m 3 - 3. BA remediation stock 7 200 m 3 ,

Structural engineering consultancy services

Schulverband Hohenroth, vertreten durch VG Bad Neustadt/ Saale | Published November 17, 2016  -  Deadline December 20, 2016

Engineering services - structural engineering for the refurbishment and reconstruction of the Edmund-Grom-elementary and middle school, Hohenroth.

The focus of the remediation form the fire protection exercise ,, required redesign of building, HLS, ELT in the existing components

and the new planning for the classroom wings in 2 to 3 phases to settle partly in full operation

Surfaces / Volume:

HNF 4500 m 2 , GFA: 6000 m 2 , BRI: School 19 200 m 3 -Turnhalle 3800 m 3 , 7 300 meters 3 BA.3 (rehabilitation inventory).

Costs:

According to the current cost estimate net (Kgr.300, 400, DIN 276) is assumed to cost a total of approximately 10 000 000 EUR.

Events:

Start performance March 2017th

Filing funding application to the funding authority: spring 2017th

It is intended with this position to rely on the following benefits (in stages):

Engineering services Structural engineering, Phases 3-9 in accordance with §§ 49 ff. HOAI.

Engineering services - structural engineering for the refurbishment and reconstruction of the Edmund-Grom-elementary and middle school, Hohenroth.

in several phases, reorganization of functions, partial remediation inventory,

static restoration, partly Energy renovation, fire protection adaptation, address safety technical deficiencies,

Refurbishment and construction planning.

Services of engineering, performance phase 3-4, 5-9 § 49ff HOAI,

Commissioning of power phases in sections,

HNF 4500 m 2 , GFA: 6000 m 2 , BRI: School 19 200 m 3 -Turnhalle 3800 m 3 , 7 300 meters 3 , 3.BA. (Rehabilitation inventory).

  • 1