Public tenders for energy in Amberg Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Electricity

Landratsamt Amberg-Sulzbach | Published October 28, 2017
Winner
Stadtwerke Amberg Versorgungs GmbH
cpvs
09310000

Supply of electrical energy for

a) Low-voltage tapping points, annually approx. 809 469 kWh,

(b) small plants, single and double tarpaulins, annually about 492 599 kWh,

c) Heat flow, about 146 289 kWh per year,

d) street lighting systems, approximately 8 119 kWh per year.

District heating

Landratsamt Amberg-Sulzbach | Published July 12, 2016
Winner
Danpower GmbH
cpvs
09323000

Supply of heating energy for the HCA-Gymnasium.

District heating

Landratsamt Amberg-Sulzbach | Published July 12, 2016
Winner
Danpower GmbH
cpvs
09323000

Supply of heating energy for the District Bauhof Sulzbach-Rosenberg.

District heating

Landratsamt Amberg-Sulzbach | Published July 12, 2016
Winner
Danpower GmbH
cpvs
09323000

Supply of heating energy in County Culture Center Sulzbach-Rosenberg.

District heating

Landratsamt Amberg-Sulzbach | Published July 12, 2016
Winner
Danpower GmbH
cpvs
09323000

Supply of heating energy for the vocational school in Sulzbach-Rosenberg.

Electricity

Zweckverband zur Abwasserbeseitigung der Stadt Amberg und der Gemeinde Kümmersbrück, vertreten durch die KUBUS Kommunalberatung und Service GmbH | Published November 8, 2017
Winner
Thüringer Energie AG
cpvs
09310000, 65310000

Supply of electrical energy for the properties of the Zweckverband for wastewater disposal of the city of Amberg and the municipality Kümmersbrück, about 1 009 870 kWh / year.

Architectural and related services

Stadt Amberg, Hochbauamt | Published January 17, 2017  -  Deadline February 14, 2017
cpvs
71200000

The city Amberg plans to create an all-day school with a cafeteria at the Albert Schweitzer Elementary School in Amberg.

Here is to be implemented from the previous primary school officially recognized open all-day school.

996 m 2 Of floor space, which can be achieved in the portfolio by additional extensions and conversions.

The construction phases of the construction work is carried out during ongoing school operations and is provided in several phases.

Services of Objektplanung gem. § 34 HOAI, Stand 2013 LPH 1-9, with gradual commissioning, on the grounds of the Albert Schweitzer Elementary School in Amberg.

The following guidelines should be considered:

The construction phases of the construction work is carried out during ongoing school operations and is provided in several phases.

The Planning and building process is structured as follows:

2017:

Here is first an overall concept with a total planning and costing to obtain a recognized status Ganztagsschule create.

226 m² HNF):

August 2018 - JULY of 2019.

770 m² HNF):

Mid-2020 - mid-2022nd

2 sections:

Mid-2022 - mid 2026 (The appointment of BA3 is optional).

Social / Social aspects:

(See also II.1.4))

The existing building will also be accessible barrier-free part of the implementation of all-day school. (Lift).

Energy / sustainability:

When building to sustainable construction and raw materials (ecological and durable) and enhanced regenerative energies are used.

For the client comes in addition to a solid construction, a wooden construction for this project into consideration.

Design Aspects:

The extension is to be built Mensa erdgeschossig.

The extension Ganztagsschule will be built multi-storey.

Particular emphasis is placed on an architecturally attractive, low-maintenance and cost-effective, energy-optimized, and time quickly realizable solutions.

Promotions / investment / life cycle costs:

The building should be promoted according to the legal foundations of FAG Promotion (schools).

It is to be achieved the highest possible promotion.

The customer received a valuable total investment and careful planning, taking into account the expected life-cycle costs is expected.

Space program:

The space program must comply with the schulbaufsichtlichen approval.

Timeframe:

The award proceedings will probably take place in late April 2017th

Procurement is vorraussichtlich in June 2017 planning start directly afterwards.

The construction project is classified by the client in the fee zone III.

  • 1