Public tenders for energy in Vimperk Czech Republic

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

"Reducing energy intensity High School Vimperk, Neruda 267 - object Pasovská"

Střední škola a Základní škola, Vimperk, Nerudova 267 | Published January 26, 2015
cpvs

Building contracts are filling the following objects: A) Construction work consisting of insulation cladding, doors, windows replacement windows and doors, including the exchange of input gates, ceiling insulation ction above an unheated basement insulation and the ceiling above the heated part in the loft of the building Secondary schools Vimperk, Neruda 267 - Pasovská object. B) Ventilation - Ventilation classrooms using efficient recovery C) Measurement and regulation - divided into five buildings - the engine room, heating circuits, zone control individual rooms, air conditioning and superior control and visualization D) Central heating - 3 heat recovery units, including regulation

Reducing energy intensity High School Vimperk, Neruda 267 - object Brantlova

Střední škola a Základní škola, Vimperk, Nerudova 267 | Published December 16, 2014
cpvs

Performance of the contract is subject facade and ceiling structures, replacement of entrance doors, installation of heat pumps air - water including the installation of low temperature heating systems, installation of solar collectors for water heating.

"Reducing energy intensity of Secondary School Vimperk - Passau Object" - additional works

Střední škola a Základní škola, Vimperk, Nerudova 267 | Published November 26, 2015
cpvs

During the implementation there were additional works which were brought to the actual implementation of the work due to objectively unforeseeable circumstances and their implementation is necessary for the proper completion of the work. Extra work in the amount of CZK 1 031 479.61 excluding VAT are due to the following: - Pumps Logatherm WPL 31 pumps replaced Siebel Eltron WPL 46 E SET, the new pumps meet all the technical parameters laid down in the PD, same price as the original pump. - PD did not contemplate HVAC components that are necessary for the proper functioning of air conditioning, measurement and control, and central heating. - The need for large-scale settlement of masonry surfaces (than counting) caused by water erosion, thick walled zdiven. 150 mm to ensure proper static object. - The PD was proposed establishment of CoP lath. This variant was, for technical reasons mistaken for polystyrene EPS using a PVC sheet with a drip and making the plaster on the bottom wall of the insulator. - A newly discovered fact that zamísto insert insulation into a wooden grid is technically required to use sticking to the walls of the shield in the loft. - Technically and economically preferable option was not to change the 2 pcs windows, but replace the wing panels of polyurethane boards with the same thermal technical of the responsibility. - Due to the proper functioning of the drainage system (condensate from air conditioning units) and an engine room were replaced with 2 expansion of the pressure vessel at 80 la 140 liters (originally planned PD) once the expansion tank of 300 liters. - PD designed control system MXPLX 88 I / O. Komplaktní I / O module has been replaced by a control system APT 30 (in the same range and price), which is technically suitable for the proper functioning of the work and the fulfillment of all parameters. The smooth completion of the performance, it was necessary to perform the above work. Based on the above additional work items were deducted works that have been performed (canceled work) of minus 211.19 CZK 1,423 without VAT.

Reduction of energy intensity Middle School Vimperk, Nerudova 267 - object Brantlova - additional works

Střední škola a Základní škola, Vimperk, Nerudova 267 | Published November 30, 2015
cpvs

During the implementation there were additional works not included in the original project documents were brought to the actual implementation of the work due to circumstances which authority is acting with due diligence could not have foreseen and their implementation is necessary for the proper completion of the work.

Warmth Elementary School Vimperk

Město Vimperk | Published November 7, 2014
cpvs
45214200

The subject of the public contract is to undertake construction work the primary school Smetana 405, Vimperk improvement in the range of thermal properties of building structures, insulation of the external vertical structures, replacement of panels in the façade, insulation horizontal structures. Closer the object of the public contract specified in the associated documentation. Reason effectiveness according to § 86 par. 2 of the Act AWD no. 137/2006 Coll .: a) Description of requirements to be fulfilled by meeting procurement: Public works contract "Smetana Elementary School 405, Vimperk" has to fulfill the need for the contracting authority to reduce energy demands. The implementation of the contracting authority reaches a quality thermal insulation of the building, which will translate into significant savings in heating operation and improvement of the environment used for teaching, which is also the main objective and the client's needs. b) Description of the subject contract: The subject of the public contract is insulation of the external vertical structures, replacement of panels in the façade, insulation horizontal structures, thus improving thermal technical properties of objects. Closer the object of the public contract specified in the associated documentation. c) Description of relationship subject VZ and needs of the contracting authority: Planned goal to be through the implementation of public procurement achieved, reducing the energy performance of buildings to reduce greenhouse gas emissions and operating costs. d) Expected date of fulfillment VZ: Deadline procurement assumes authority within 5 months of the conclusion of the work in 2015.
  • 1