Public tenders for energy in Teplice Czech Republic

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Securing energy savings Elementary School Buzulucká, Teplice

Statutární město Teplice | Published October 22, 2014  -  Deadline October 1, 2015
cpvs
45214200

Construction work Buzulucká Elementary School in Teplice lie in the insulation of the external walls of buildings running EPS Grey 140 mm, roof insulation neck insulation roof pavilions, changing rooms and roof insulation, clubs, canteens and gyms thermal insulation of expanded polystyrene EPS. There will also be replacing all the original windows with new plastic with heat-insulating triple glazing. New doors are designed in a plastic solutions with heat-insulating glazing U = 1.20 W / (m2K), in the kitchen, this indicator will reach max. Value of 1.40. Reason effectiveness of public contracts for the purposes of the preliminary announcement of the contracting authority: a) description needs to be the fulfillment of public contracts fulfilled: • external insulation elementary school will reduce energy consumption and less pollution to the environment. b) Description of the procurement: • Construction work Buzulucká Elementary School in Teplice consist of complete insulation of the entire building including the roof, the modernization of the building envelope and replacing all the original windows and most existing doors. c) Description of relationship the subject contract and the client's needs: • The aim of the project is to reduce heat consumption for heating the building, prevent the application of heat losses fills holes and building envelope. External insulation and replacing windows and doors will meet these requirements, investor / entity. The sponsor expects that in the coming years, investment returns and the costs saved on heating (it is calculated and documented, among others. In the energy audit). d) Expected date of fulfillment of public contracts, ie. handover protocol can be assumed: 10/2015. The project will be financed from own resources of the investor and the Operational Programme Environment. The Contracting Authority draws attention to the Contractor that the contract will be made only if the sponsor receives a subsidy from the OPE.

Ensuring energy savings Buzulucká Elementary School, Teplice

Statutární město Teplice | Published April 6, 2017
Winner
EUROMONT GROUP a.s.
cpvs

Ensuring energy savings Buzulucká Elementary School, Teplice

Statutární město Teplice | Published June 23, 2015
cpvs

Construction work Buzulucká Elementary School in Teplice lie in the thermal insulation of external walls of buildings EPS system gray 140 mm, roof insulation neck, pavilions, roof insulation, roof and insulation dressing room suite, dining room and gymnasium thermal insulation of expanded polystyrene EPS. There will also be replacing all the original windows with new plastic with heat insulating triple. New doors are designed in a plastic solution with heat insulation glazing U = 1.20 W / (m2K), in the kitchen, this indicator will reach max. Value 1.40.

Management, routine maintenance, operation and repair of public, Christmas and festive lighting, collectors and energy resources within the city of Teplice in the years 2016-2020

Statutární město Teplice | Published October 22, 2015
cpvs

VZ is subject to collateral management, routine maintenance and repair of public lighting, collectors, Christmas and festive lighting and energy resources owned by the City of Teplice in its territory, including the conduct of periodic inspection and management and replenishment passports. Payment for electricity consumption above devices are not subject VZ, these payments done separately authority.

Management, routine maintenance, operation and repair of public, Christmas and festive lighting, collectors and energy resources within the city of Teplice in the years 2016-2020

Statutární město Teplice | Published June 16, 2015
cpvs

VZ is subject to collateral management, routine maintenance and repair of public lighting (according to the current state of light 5619 seats), collectors (4 collectors), Christmas (374 pieces) and the ceremonial lighting (237 pieces) and energy (7 pieces) owned by the City Teplice on its territory, including the implementation and periodic revision of management and replenishment passports. Payment for electricity consumption above devices are not subject VZ, these payments to the Contracting Authority separately.

Management, routine maintenance, operation and repair of public, Christmas and festive lighting, collectors and energy resources within the city of Teplice in the years 2016-2020

Statutární město Teplice | Published May 12, 2015
cpvs
50232100

VZ is subject to collateral management, routine maintenance and repair of public lighting (according to the current state of light 5619 seats), collectors (4 collectors), Christmas (374 pieces) and the ceremonial lighting (237 pieces) and energy (7 pieces) owned by the City Teplice on its territory, including the implementation and periodic revision of management and replenishment passports. Payment for electricity consumption above devices are not subject VZ, these payments to the Contracting Authority separately. Reason effectiveness VZ according to § 1 of Decree no. 232/2012 Coll .: a) Description of requirements to be fulfilled by meeting VZ: needs of the client is to provide a safe and functional condition and the smooth operation of public lighting, collectors, Christmas and festive lighting and energy sources owned by the City of Teplice on its territory in accordance with applicable laws and regulations. b) Description of VZ: VZ object is to provide management, routine maintenance and repair of public lighting (according to the current state of light 5619 seats), collectors (4 collectors), Christmas (374 pieces) and the ceremonial lighting (237 pieces) and energy (7 ks) owned by the City of Teplice on its territory, including the implementation and periodic revision of management and replenishment passports. Payment for electricity consumption above devices are not subject VZ, these payments to the Contracting Authority separately. c) Description of the relationship between the subject and the needs of the contracting authority VZ: VZ embodiment of the needs of the client will be fully realized. This will ensure safe and functional condition and trouble-free operation of the device in question. VZ implementation will continue to ensure the lighting of roads and public spaces, needed to ensure the safety of persons and vehicles and the protection of property and human health. d) Expected date of fulfillment VZ: The winning bidder will be contracted for a fixed period from 1 January 2016 to 31 December 2020.

Securing energy savings Elementary School Maršovská 1575/2 - more work

Statutární město Teplice | Published October 13, 2014
cpvs

Replacing the air vents on the radiators and replacement of the seal fitting of radiators.

Street-lighting maintenance services

Statutární město Teplice | Published October 24, 2015
Winner
Eltodo – Citelum, s.r.o.
cpvs
50232100

VZ is subject to collateral management, routine maintenance and repair of public lighting, collectors, Christmas and festive lighting and energy resources owned by the City of Teplice in its territory, including the conduct of periodic inspection and management and replenishment passports. Payment for electricity consumption above devices are not subject VZ, these payments done separately authority.

Street-lighting maintenance services

Statutární město Teplice | Published June 18, 2015  -  Deadline August 10, 2015
cpvs
50232100

VZ is subject to collateral management, routine maintenance and repair of public lighting (according to the current state of light 5619 seats), collectors (4 collectors), Christmas (374 pieces) and the ceremonial lighting (237 pieces) and energy (7 pc) in Statutory property town of Teplice in its territory, including the implementation of periodic revisions and management and replenishment passports. Payment for electricity consumption above devices are not subject VZ, these payments to the Contracting Authority separately.
  • 1