Call +44 800 9755 164

Public tenders for energy in Slavkov-u-brna Czech Republic

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyCzech Republicslavkov-u-brna

Other sources of energy supplies and distribution

Město Slavkov u Brna | Published August 19, 2016
cpvs

Supply and distribution of other sources of energy

Other sources of energy supplies and distribution

Město Slavkov u Brna | Published February 11, 2016  -  Deadline March 7, 2016
cpvs
65400000

Supply and distribution of other sources of energy

Other sources of energy supplies and distribution

Město Slavkov u Brna | Published January 23, 2016  -  Deadline February 22, 2016
cpvs
65400000

Supply and distribution of other energy sources

Contract research and consultation collective research project Intelligent energy management in low-energy and passive houses

ENERGOKLASTR | Published April 16, 2015
cpvs

The subject of procurement is to select a supplier for the contract to provide services contract research, consultancy and advisory services relating to the implementation of research projects contracting, and to the following areas: Intelligent energy management in low-energy and passive houses

Other sources of energy supplies and distribution

Město Slavkov u Brna | Published January 19, 2016  -  Deadline February 22, 2016
cpvs
65400000

The subject of performance of this contract is the supply of heat energy that is produced as waste heat from cogeneration units burning natural gas and generating electricity production supplied to the national grid, for min. 15 years. All this in order to get effective, reliable, safe and economical supply of thermal energy. Heat supply will be implemented based on a contract for the supply of thermal energy, which will be concluded with the selected contractor (hereinafter the "Contract"). The sponsor will provide heat supplier under the lease agreement to lease space for location combined heat and power plants to natural gas for 15 years from the date of commissioning of combined heat and power plants to natural gas in permanent operation after the issuance of the occupancy permit for combined heat and electricity to natural gas. The electrical power generated in the combined heat and power plants to natural gas can be a supplier of heat used in his decision. Detail the subject matter as in the tender documentation.

Purchase energy-saving equipment companies STAMIT Ltd.

STAMIT, s.r.o. | Published February 15, 2016
cpvs

The subject of the tender is to implement the purchase of energy-saving machines. According to § 2e Act no. 320/2001 Coll., On financial control in public administration, as amended, the selected contractor is obliged to cooperate in the performance of financial control. This is not a procurement procedure under the Act no. 137/2006 Coll.

Contract research and consultation project of collective research energy-saving control systems for large buildings

ENERGOKLASTR | Published April 14, 2015
cpvs

The subject of procurement is to select a supplier for the contract to provide services contract research, consultancy and advisory services relating to the implementation of research projects contracting, and to the following areas: Energy-saving control systems for large buildings

Research and development services and related consultancy services

Energoklastr | Published April 21, 2015
Winner
Energocentrum Plus s.r.o.
cpvs
73000000

The subject of procurement is to select a supplier for the contract to provide services contract research, consultancy and advisory services relating to the implementation of research projects contracting, and to the following areas: Intelligent energy management in low-energy and passive houses.

Energy-saving Home Services Slavkov

Obec Slavkov | Published September 21, 2016
cpvs

The project is aimed at reducing emissions in the building insulation

Heat supply to the boiler room on the street Golden Mountain in Slavkov u Brna

Město Slavkov u Brna | Published August 15, 2016
cpvs

The subject of performance of this contract is to supply thermal energy generated as waste heat from cogeneration units burning natural gas production and generating electricity supplied to the national grid, for min. 15 years. All this in order to get effective, reliable, safe and economical supply of thermal energy. Heat supply will be implemented based on a contract for the supply of thermal energy, which will be concluded with the selected contractor (hereinafter the "Contract"). The sponsor will provide heat supplier under the lease agreement to lease space for placement combined heat and power plants to natural gas for 15 years from the day the combined heat and power plants to natural gas in permanent operation after the issuance of the occupancy permit for combined heat and electricity to natural gas. The electrical power generated in the combined heat and power plants to natural gas can be supplied by the heat used in his decision. For more details about the public contract described in the tender documentation.

Research and development services and related consultancy services

Energoklastr | Published April 17, 2015
Winner
České vysoké učení technické v Praze
cpvs
73000000

The subject of procurement is to select a supplier for the contract to provide services contract research, consultancy and advisory services relating to the implementation of research projects contracting, and to the following areas: Energy-saving management systems in large buildings.

Heat supply in Austerlitz

Město Slavkov u Brna | Published December 2, 2015
cpvs
65400000

The subject of performance of this contract is the supply of heat energy that is produced as waste heat from cogeneration units burning natural gas and generating electricity production supplied to the national grid, for min. 15 years. All this in order to get effective, reliable, safe and economical supply of thermal energy. Detail the subject matter as in the tender documentation. Reason effectiveness of public procurement for the purposes of pre-notification of the contracting authority pursuant to § 86 par. 2 of the Law on Public Procurement. Description needs to be the fulfillment of public contracts achieved: implementation of public procurement authority will ensure efficient, reliable, safe and economical supply of thermal energy. A description of the subject of the contract: The subject of this contract is to supply thermal energy which is generated as waste heat from cogeneration units burning natural gas and generating electricity production supplied to the national grid, for min. 15 years. Description of the relationship of the public contract and the client's needs: Submitter own central boiler room, where there are now three a boiler to natural gas. From the boiler room is supplied heat mostly to residential houses owned SBD Žuráň and to a lesser extent in zadavatelových residential buildings. The intention is to reduce the cost of heat generation by installing cogeneration units through another entity from which the authority is sourced waste heat. If the contracting authority did not begin to take steps to reduce the cost of heat may cause disconnection of residential houses and heating solutions through the heat pump, as is already happening, which may result in a price increase of heat. Expected date of fulfillment of the public contract: The expected date of the public contract is 15 years since the signing of the contract.

Reducing energy intensity object old school in township Island at the gorge

Městys Ostrov u Macochy | Published February 9, 2015
cpvs

The subject of performance below threshold procurement works, related to energy savings and reducing the energy intensity of the building old school in township Island at the gorge. Within the construction work will significantly reduce the energy intensity of the building old school in township Island at the gorge. The proposed measures include the application of thermal insulation composite systems (ETICS) to cover the building and replace parts, filling holes.

Heat supply in Austerlitz

Město Slavkov u Brna | Published January 19, 2016
cpvs

The electrical power generated in the combined heat and power plants to natural gas can be a supplier of heat used in his decision. Detail the subject matter as in the tender documentation. If the contracting authority has fewer than five requests to participate, the contracting authority shall invite to tender all candidates who have applied to participate and demonstrated the fulfillment of qualifications. In limiting the number of interested Contracting Authority will evaluate the level of fulfillment of technical qualification requirements - the number of significant deliveries of similar nature as the subject of the contract, and that the supply of thermal energy using combined heat and power plant to natural gas, implemented in the last 3 years in a minimum of 9000 GJ / year from each such source from which it will imply that such deliveries took place at least 24 months in the last 3 years, evidenced by a certificate of the contracting authority or another person (unless the shipment shipped person other than a contracting authority), or evidence of the contract with another person and proof of fulfillment vendor, if not simultaneously be a certificate from that other person for reasons on the part. Subsequently, counts the number of points of a particular candidate. The limiting the number of candidates will be taken protocol that all interested parties will be consulted. The sponsor immediately following the selection of candidates who have duly demonstrated the fulfillment of qualifications required in full, will exclude all candidates who were not selected. The sponsor will be in various stages of acting to limit the number of candidates.

KODUS - No. 658, Horni Slavkov, parc.st. 883 - SO 2 - Reducing building energy efficiency

Město Horní Slavkov | Published January 4, 2016
cpvs
45321000

Construction work of civic facilities in the cadastral č.p.658 Horni Slavkov to reduce the building's energy performance. Specifically it is the replacement of all fillings and assembly of thermal insulation composite system offer will be financed through OPE. No aid can be a reason to cancel the tender procedure

Energy and related services

Městský úřad Horní Slavkov | Published July 22, 2016
cpvs
71314000, 09000000

Selection of operators of central heat supply in Horni Slavkov.

"KODUS - No. 658, Horni Slavkov, parc.st. 883 - SO 2 - Reducing the energy performance of the building - building insulation "

Město Horní Slavkov | Published April 25, 2016
cpvs

It is a building built in the style of socialist realism around 1955. 9 ZD. The current conductors are removed and, after completion of the insulation work will be carried out, including the new revision. The current conductors are removed and, after completion of the insulation work will be carried out, including the new revision. Finishing the base will consist marmolitovou plaster. Hardened thermal insulation board will be dragged 500 mm to existing peripheral wall. 30 mm). 160 mm with 0.036 lambda. 160 mm with 0.037 lambda. 18 mm. The floor will be insulated by the soil insulator tot. thickness 320 mm lambda 0.036.

"KODUS - No. 658, Horni Slavkov, parc.st. 883 - SO 2 - Reducing the energy performance of the building - building insulation "

Město Horní Slavkov | Published July 7, 2016
cpvs

It is a building built in the style of socialist realism around 1955. 9 ZD. The current conductors are removed and, after completion of the insulation work will be carried out, including the new revision. The current conductors are removed and, after completion of the insulation work will be carried out, including the new revision. Finishing the base will consist marmolitovou plaster. Hardened thermal insulation board will be dragged 500 mm to existing peripheral wall. 30 mm). 160 mm with 0.036 lambda. 160 mm with 0.037 lambda. 18 mm. The floor will be insulated by the soil insulator tot. thickness 320 mm lambda 0.036.

Selection of operators of central heat supply in Horni Slavkov

Městský úřad Horní Slavkov | Published September 5, 2016
cpvs

The subject of the concession procedure thus ensuring the operation of district heating and self-provision of production and distribution of thermal energy (hereinafter "TE"), ie. Ensuring operability of leased infrastructure, distribution TE and its delivery to end customers, all in a day of continuous operation, and including related services.

Technology for material recovery BRO composting - Jakub Pospisil

Jakub Pospíšil | Published September 22, 2015
cpvs

The subject of the public contract is the supply / purchase of equipment for composting (energy resource = tractor with front loader)