Public tenders for energy in Praha-suchdol Czech Republic

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

El. Energy VN 2017

Česká televize | Published September 1, 2016
cpvs

The subject of the tender is the supply of electricity within the combined services of the electricity supply voltage in high voltage level at the estimated aggregate quantity of 25,265 MWh for the year 2017.

Rental space testing, the commissioning, servicing and operation of the Z1-Z2

České vysoké učení technické v Praze | Published August 30, 2016
cpvs
70310000

The deliverable is hiring and placement testing Core + prop2 at a suitable location meeting the emission of noise and hygiene regulations with large enough resources. (Energy, water, etc.). The course includes performance will operate these services with the supervision of the experimental work of students in master's and doctoral degree programs. The purpose of the tender is to build a research and development base for the OP VVV Centre advanced aerospace technologies in which the research will be the development characteristics of aircraft engines and aircraft structures during use. Built R & D base will be used for research projects within the grant projects, collaborative research projects, contract research projects, doctoral dissertations and other research projects. Built R & D base will allow to participate in grant competitions, requests for research projects with industrial partners and listing topics for doctoral dissertation. The sponsor does not have sufficient personnel with appropriate capacity and private spaces in which to ensure the location and operation of this service. Expected date of fulfillment VZ: from 1 March 2017 to 6 years

Mobile X-ray kit for checking objects in the protection of protected persons

Česká republika - Ministerstvo vnitra | Published September 12, 2016
cpvs

The subject of public procurement (hereinafter VZ) is the delivery of mobile X-ray sets for control subjects in the protection of protected persons. - The basic unit of transmission wireless (WiFi) system display unit in a mobile configuration in a strong box (eg. In a suitcase with wheels), -pulzní X-ray source, which presents a high energy level, - a digital display unit with color resolution and organic inorganic substances - dual module for the detection of organic and inorganic materials - devices for wireless communication between the X-ray source, a central box and sensor panel, -external 150 m cable. tender documents including its annexes is available on the profile of the contracting authority Ministry vnitra- management logistics security this link: https://www.zakazky.mvcr.cz/profile_display_3.html

Framework contract for expert services - calculations and analysis in the implementation of the National Plan for Smart Grid

PREdistribuce, a.s. | Published September 8, 2016
cpvs

The result of the tender procedure is a framework agreement (the "Framework Agreement") with one contender to the services of external support to the Client in the performance of its tasks under the National Action Plan for Smart Grid (hereinafter "NAP SG") for the development of network infrastructure ensure reliable and safe operation at the required development of distributed power generation, including the involvement of small heating plants, production management, accumulation and consumption, taking into account the requirement of increasing energy efficiency. NAP SG approved on March 4, 2015, the Czech Government and Sponsor, respectively. Association members as contracting entities operating in the electricity sector (operation of distribution systems, resp., in the case of CEPS transmission system operation), appointed the members of the Coordinating Committee for the implementation of the NAP SG and instructed them to meet the objectives of the NAP SG through the implementation of predefined measures. The outsourcing of public contracts under the framework agreement will be carried out the procedure according to § 92 paragraph. 1 point. a) the PPA, the contracting entity shall invite the suppliers in the form of an order to provide the performance and the successful tenderer confirms the order, with this confirmation will be closed partial (detailed) contract for the performance of a public contract. Submitters (PREdistribuce, E.ON Distribution, as, ČEPS and ČEZ Distribution, Inc.), have concluded an agreement on association of advertisers (hereinafter referred to as the "principal"), the company PREdistribuce, as were other contracting authorities empowered to publication of the notice to CEI.

Elementary school and kindergarten us. George of Lobkowicz, building Perunova 6/975 - reconstruction windows

Městská část Praha 3 | Published August 19, 2016
cpvs
44221100

The subject of the tender is the selection of a candidate who in elementary school and kindergarten us. George of Lobkowicz, building Perunova 6/975, Prague 3, removing the existing dilapidated windows and subsequently produces 215 pieces of wood, lining windows with double glazing, forging, which subsequently installed in the building. The building itself is located in a protected area conservation zones in the district of the city of Prague 3. It is a building from the late 19th century. Description needs to be the fulfillment of public contracts achieved: the exchange of old, dilapidated windows will reduce the building's energy performance and aesthetics of the building in the conservation area. A description of the subject contract: The contract is the manufacture and assembly of 215 pieces of wooden lining windows in the primary school and kindergarten us. George of Lobkowicz, building Perunova 6/975, Prague 3. Description of the relationship between the subject contract and the client's needs: Public procurement is used to meet the client's needs.

Supplies of services for the National House Vinohrady

Ministerstvo kultury | Published August 25, 2016
cpvs
09310000

The subject of public procurement is the supply of energy and services to the authority of premises used in the building of the National House Vinohrady necessary for ensuring operation of the space and work environment are dislocated workers. Description of needs: The purpose of this Order is the introduction of a single departmental project management methodology and the establishment of a working team project office, which will provide activities defined by the command. 33/2015. For the above reasons, the administrative area should correspond to the importance of the activities carried out and should be somewhat representative. Department of Internal Administration, in close cooperation with lean MK, undertook an investigation to find suitable office space for the newly formed Consultants. Part of the agreement on the use of space are energy supply and services that must be tendered separately. By the conclusion of a contract for the provision of energy supply and services agreement shall remain in force for the use of space and, therefore, the contracting authority will be able to properly and effectively use the subject area. Course description: The subject of procurement is the supply of energy and services to the authority of premises used in the building of the National House Vinohrady necessary for ensuring operation of the space and work environment are displaced employees: 09310000-5 Electricity 53 Water supply 79710000-4 Security services 90919200-4 Cleaning offices 09323000-9 District heating 90918000-5 emptying garbage cans and trash bins Description of the relationship between subject and VZ client's needs: the only option to ensure the required supplies and services, thus addressing the existing supplier - tenant company National house Vinohrady - cultural home of the Railway Ltd. Period of performance:

Supply of electricity for the years 2018 -2020

Letiště Praha, a. s. | Published September 14, 2016
cpvs

The subject of the public tender is the supply of electricity Sponsor for 2018, 2019 and 2020, including the assumption of responsibility for imbalances in accordance with Decree no. 541/2005 Coll., On Electricity Market Rules, as amended and obligations of EU regulation - REMIT . It is a continuous supply of electricity in the anticipated total volume amounting to: 330,000 MWh (see qualification and tender documents).

ICEM - supply heat energy to the area ICEM

Institut klinické a experimentální medicíny | Published July 1, 2016
cpvs

The subject of the public contract is to ensure the supply of heat energy for premises sponsor, Institute of Clinical and Experimental Medicine at Vienna 1958/9, 140 00 Praha 4, that it will be a supply of thermal energy for central heating and hot water. Supply of thermal energy will be provided from the primary source of heat - hot water system Pražská teplárenská as, amounting to about 43,000 GJ / year for 5 years, and will ensure the supply of thermal energy in the event of failure of the primary heat source, from a backup heat source - gas boiler room sponsor. Supply of thermal energy is associated with the lease of equipment - a backup heat source.

16-099 Central Acquisition of Electricity for 2017

Česká republika - Správa státních hmotných rezerv | Published July 7, 2016
cpvs

VZ is subject to selection of a supplier of electricity to 2017 for all offtake points SSHR

Supply of electricity in 2016

ČEPRO, a.s. | Published July 20, 2016
cpvs

Supply of electricity in 2016

GSI R48 Bělotín - Fish, relocation of LV, HV CEZ Distribution, Inc.

Ředitelství silnic a dálnic ČR | Published July 4, 2016
cpvs

The contract is relaying low or high voltage, replacement or relocation of the mast VN or modification of overhead lines incl. possible connections for existing customers of electrical energy for SO 401, 402, 403, 404, 412,413, 417, 405, 406, 407, 414, 415 and 416 works MUK R48 Bělotín - Fish. Rerouting will be made under a framework agreement concluded between the distribution system operator CEZ Distributing, Inc. and RMD CR on 17. 9. 2015.

Revitalization of thermal management and heat supply for the UK FTVS

Univerzita Karlova v Praze, Fakulta tělesné výchovy a sportu | Published July 13, 2016
cpvs
09324000

VZ is subject to the implementation of the revitalization of thermal management sponsor and simultaneously ensure the supply of thermal energy. Reason effectiveness of public procurement: 1) the description needs to be the fulfillment of public contracts fulfilled Fulfilling a public contract is to be achieved revitalization of thermal management sponsor and supply of heat to guarantee cost savings by contracting for thermal energy spending. 2) a description of the subject contract subject of public procurement is the implementation of the revitalization of thermal management sponsor and simultaneously ensure the supply of thermal energy. 3) a description of the relationship between the subject contract and the client's needs, Sponsor strives for efficient operation of the boiler and achieving savings in the cost of thermal energy, which intends to reach a contract for the revitalization of boiler and subsequent collection of thermal energy prices with guaranteed savings compared to the current situation. 4) the anticipated date of fulfillment of the public procurement contract for the performance of public contracts will be multi-year, the exact dates will be specified in the tender documents.

Energy services with guaranteed results in buildings CD Prague 9

Městská část Praha 9 | Published April 29, 2016
cpvs
71314000

The subject of the tender is the implementation of energy saving measures EPC (Energy Performance Contracting) for selected objects the Prague 9 (expected range of 14 to 15 buildings), especially as social service centers, kindergartens and primary schools, high school and hostel. The contract concerns the implementation of energy saving measures by Energy Performance Contracting (hereinafter "EPC") for selected objects managed by the district. Supplier propose appropriate energy saving measures, which will reduce the cost of heat, electricity or water, or other operating costs. The Contractor shall ensure the supply and installation of energy saving measures, funding and improve the economics of energy operations submitter. EPC method allows to achieve without direct one-off expenditures sponsor reducing the cost of fuel and energy in the respective objects. Savings achieved by implementing the project EPC contractor are guaranteed, after the implementation of austerity measures, the savings monitored and evaluated. Possible energy saving measures include in particular the control of heating and IRC, efficient lighting, saving taps, savings on water and lighting. The selected contractor that designs and implements the selected objects such set of energy saving measures so that the price of the project was repaid by the contracting authority for the contract mainly from investments achieved a provider of guaranteed savings on media costs or savings in other operating costs. Implementation of the contract will lead to increased heat and user experience across all devices sponsor. Without the implementation of the subject matter of public contracts can lead to reduced operating costs submitter. Expected date of fulfillment of public contracts is expected in the range of 10 to 12 years after signing the contract.

Reducing energy intensity Hotel ILF

Institut postgraduálního vzdělávání ve zdravotnictví | Published May 2, 2016
cpvs

The subject of the tender is making the project "Reducing energy intensity Hotel ILF" the place of performance ul. Budějovická 15, No. 743, Prague 4 and in particular the scope of the design documentation for the execution of the project, developed by a commercial company a3atelier sro, ID 24164500, based Konviktská 998/15, 110 00 Prague 1, 08/2015 date the particular envelope insulation and replacement windows and door panels in the envelope.

LRNS - Automated monitoring and control systems, air traffic control - repairs and maintenance

Česká republika - Ministerstvo obrany | Published April 27, 2016
cpvs
50210000

Comprehensive operation of aircraft ground equipment - ground monitoring and control device designed for monitoring and control of radio navigation, security lighting, communications and energy facilities LRNS.

Heat supply from Teplárna Liberec, as

Armádní Servisní, příspěvková organizace | Published April 22, 2016
cpvs
09320000

The subject of the tender is the conclusion of contracts for the supply of thermal energy with the performance in the period from 1. 6. 2017 to 31. 5. 2027 divorce from central heat supply from Teplárna Liberec, as supply points for CE 09/10/04 - ASVS Dukla, Jeronýmova 522 and CE 11/10/04 - Liberec - sports hall, Jeronýmova 558 in the anticipated volume of 4.3 TJ. Reason effectiveness of public procurement in accordance with § 86 par. 2 PPA: Data according to § 1 of Decree no. 232/2012 Coll. a) Description of requirements to be fulfilled by meeting the public contract: Security of thermal energy for buildings CE 09/10/04 - ASVS Dukla, Jeronýmova 522 CE 11/10/04 - Liberec - sports hall, Jeronýmova 558. b) Description the subject of the contract: Delivery of thermal energy. c) A description of the relationship between the subject contract and the needs of the contracting authority: Building contracts are contracts for the supply of heat energy for premises: CE 10/09/04 - ASVS Dukla, Jeronýmova 522 CE 10/11/04 - Liberec - sports hall , Jeronýmova 558. d) Expected date of fulfillment of public tenders: 1. 6. From 2016 to 31. 5. 2,021th

Consultant GPA and other activities related to the project STORK II

NET4GAS, s.r.o. | Published May 5, 2016
cpvs

The subject of performance of this contract is to develop documentation for selection of contractor for the VTL gas pipeline STORK II. This is a project to increase energy security of the Czech Republic and securing gas supplies for the growing industrial area in the Region. The project is also part of the planned North-South interconnections with Poland / Austria. The pipeline STORK II is a dimension of DN 1000, PN 73.5 and a length of about 52 km. Will be conducted on the existing campus RU Libhošť on the border with Poland near the village Hat. The selected candidate will be required to develop comprehensive documentation describing any future action demanded sub-contractors of buildings with a view to cover all foreseeable risks involved.

16-093 Silo Blovice - reconstruction of the substation

Česká republika - Správa státních hmotných rezerv | Published May 5, 2016
cpvs
31170000

The subject of the tender is a complete reconstruction of technically and morally obsolete substation. Reconstruction includes the supply and installation of new LV switchboards RH1, RH2 14 fields, supply and installation of new T1, T2 1600kVA, 22 / 0,4 kV, low voltage cable connection between the new T1, T2 and the new LV switchboards RH1, RH2 and interconnect existing ground network grounding T1, T2 and the new LV switchboards RH1, RH2. Justification for the prior notification pursuant to § 86 of the Act no. 137/2006 Coll., On Public Procurement, as amended, the procedure according to the Decree of the Ministry for Regional Development no. 232/2012 Coll., On the details of the reasoning of the effectiveness of public procurement and justification procurement. a) a description of needs to be fulfilled by meeting VZ: Subject VZ is necessary as a measure to increase the efficiency of technically and morally worn substation (year of construction 1991) and to substitute for new technology at the current technical level. b) a description of the subject VZ: The subject of the tender is a complete reconstruction of technically and morally obsolete substation. Reconstruction includes the supply and installation of new LV switchboards RH1, RH2 14 fields, supply and installation of new T1, T2 1600kVA, 22 / 0,4 kV, low voltage cable connection between the new T1, T2 and the new LV switchboards RH1, RH2 and interconnect existing ground network grounding T1, T2 and the new LV switchboards RH1, RH2. c) a description of the relationship between the subject and the needs of the contracting authority VZ: Complete reconstruction of the transformer substation will increase efficiency and allow in its management module to monitor and control energy consumption. d) the estimated dates of fulfillment VZ: Within 3 months from the date of signing the contract.

container generator

Vojenský technický ústav, s.p. | Published May 6, 2016
cpvs

The subject of the tender is the supply of container with the output power min. 60 kW 3 / 400V placed in a container ISO - 1C (2 pcs) min. 3 kW 120 / 400V placed in a container ISO - 1C (4 pieces) and min. 360 kW 3 / 400V placed in a container ISO - 1C (4 pieces). The subject of the public contract must comply with the COS 611501 "Electric generating sets powered by a combustion engine," 2nd edition; COS 051 632 "Movement and operational documentation ground military equipment" 1st edition. Subject of public procurement will work in extreme weather conditions (-32 to + 55 st. C) in island mode or in the energy complex of several sources operating in one substation in a system of continuous fully automated operation with central fuel economy. It must also meet in the process of comprehensive testing business, inspection, approval and field tests.

Reducing the consumption of heat and electricity in the building garage DRUPOL the company, production cooperative business Pribram

D R U P O L, výrobní družstvo | Published April 15, 2016
cpvs

The contract is the insulation of the building envelope garage, replacement of entrance gates and replacing light fixtures according to project documentation. (Appendix 1 tender documentation). The Contracting Authority requires to implement the work as a whole. Place for receipt of tenders is DRUPOL, production cooperative, Prague 9, in the front Hloubětín 605/8, Postal Code 190 00. This selection process is carried out in the Act no. 137/2006 Coll., On Public Procurement, as amended. The sponsor shall proceed according to the Rules for supplier selection: MPO 33321/15/61100, valid from 1 8th 2015. The complete tender documentation is available on the contracting entity profile. According to § 2e Act no. 320/2001 Coll., On financial control in public administration, as amended, the selected contractor is obliged to cooperate in the performance of financial control.