Public tenders for energy in Most Czech Republic

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Energy-efficient pension for the elderly - ul. Komořanská 818/2, Most

Statutární město Most | Published February 4, 2015
cpvs
45321000

These are: - thermal insulation of external walls of buildings A, B, including perimeter walls and balconies realization of curtain wall on the east side of the stair vertical (exchange of heat insulation panel Boletického) - insulation of building C in 1.NP (Boletická jacket) realizations light walls, - exchange yet original fillings on the 1st floor Building C and insulation walls - insulation double-layer roofs Building C, - the transfer of existing hromosvodný system on all objects and perform new audit reports, - implementation of new roofing roofs over balconies of buildings A, B on the west and east side. The realization of this project will fulfill the long-term intentions of the contracting entity in accordance with the current strategic plan for city development Most. It will also be filled with contracting strategies on achieving energy savings. This is a building works related to thermal insulation composite system facades of the building, including reconstruction of the roof. insulation, replacement of fillings. This is an improvement of the technical condition of the building owned by the contracting authority. Public Tender 03/2015; assumption of implementation 05-10 / 2015

The District Court in Most, insulation and replacement windows

Okresní soud v Mostě | Published January 14, 2015  -  Deadline October 31, 2015
cpvs
45000000

This is a modification of an existing building construction District Court in Most, which aim to reduce energy intensity objektu.Dojde for thermal insulation of external walls, roof insulation, replacement of exterior doors, windows, including exterior glass walls and walls inside the entrance. Everything in architectural - building solutions according to project documentation. Reason effectiveness VZ according to §1 Decree 232/2012 Sb. a) a description needs to be the fulfillment of public contracts achieved: energy-efficient District Court in Most b) a description of the subject contract: insulation of external walls, roof insulation, replacement of exterior doors, windows, including exterior glass walls and walls inside the entrance c) a description of the relationship between the subject contract and the client's needs: reducing building energy performance can not be done any other way d) the anticipated date of fulfillment of public contracts: in October 31, 2015

Electricity

Statutární město Most | Published January 16, 2016
Winner
EP Energy Trading, a.s.
cpvs
09310000

This is to ensure electricity supply for the City of Most, it established or founded the company and the surrounding communities for a period of 2 years.

Reducing the energy intensity of the business building No. 1465, Most

ALTRYSS s.r.o. | Published September 13, 2016
cpvs

The contract is the insulation envelope. Designed building is located in Most, Most Part I, ul. Church. Surrounding the building is slightly sloping towards the north. The building is single. Northeast facade to the street church. The object of the NE side continues on the adjacent sidewalk and driveway asphalt road. In the courtyard is parking. Northwest facade of the main entrance to the courtyard side of the building. In the southwest part of the building is another entrance to the building. Lots 167 is built - up area and courtyard. It is an administrative building. Building does not change the external solution neither land use nor regulatory and zoning plan. The building serves as the administrative buildings. Project to interfere with the internal parts occurs building insulation without interfering with the ground plan and height dimensions. It is not necessary planning approval or decision. The authorities concerned are familiar with documentation and intent of the investor. Their comments and suggestions in Part E of this documentation and the project is fully respected. On the construction does not apply zoning decision does not alter the footprint or height of the building. It is the insulation of the building envelope, the ceiling of the basement and roof interspace. 1st According to § 2e Act no. 320/2001 Coll., On financial control in public administration, the selected contractor is obliged to cooperate in the performance of financial control. 2. The company claims that this tender is not a public tender or a public promise and not a public contract implemented pursuant to Act no. 137/2006 Coll. 3.Nabídka on public procurement will be presented in the Czech language in 1 copy and 1 CD, in PDF format.

Energy savings in buildings OC NORTH no. 344 in Most

Hana Medunová | Published July 11, 2016
cpvs

- The contract is the implementation of measures aimed at saving energy in the building at KHMácha's 344, 434 01 Most (land plot no 6398/48, cadastral 699594 Bridge II). It is the insulation and building envelope and replacement of hole fillings. This is not a procurement procedure under the Act no. 137/2006 Coll., On public procurement. According to § 2e Act no. 320/2001 Coll., On financial control in public administration, as amended, the selected contractor is obliged to cooperate in the performance of financial control.

Power supplies

Statutární město Most | Published January 13, 2016
cpvs

This is to ensure electricity supply for the City of Most, it established or founded the company and the surrounding communities for a period of 2 years.

Energy-efficient pension for the elderly - ul. Komořanská 8182, Most - additional works

Statutární město Most | Published October 14, 2015
cpvs

These are additional works, which consist of the installation of entrance doors incl. new stairway and walkway access, manufacture and installation of handrails, terraces, mounting brackets clothesline and holders of satellite dishes, removing the pipe HVAC, blinding vents finish coating covering incl. insulation, concreting stairs incl. Thermal insulation, installing parapet connection profile, reducing concrete terraces, removal of silicone sealant fills the frames, manufacture and installation of skirting boards edge.

Supply of electricity for the period from 01.01.2016 until 31.12.2017

Oblastní muzeum v Mostě, příspěvková organizace | Published October 21, 2015
cpvs

Centralized procurement of electricity supply to the region, it established a contributory organization, the Institute of Archaeological Heritage Care in northwestern Bohemia, public research institutions and the Regional Health as the period from 01.01.2016 until 31.12.2017.

Power supplies

Statutární město Most | Published September 8, 2015
cpvs
09310000

This is to ensure electricity supply for the City of Most, it established or founded the company and the surrounding communities for a period of 2 years. It is the security of supply of electricity in high voltage level for the City of Most, it established or founded the company and the surrounding communities for a period of 2 years. This is to ensure electricity supply in the LV level for the City of Most, it established or founded the company and the surrounding communities for a period of 2 years. Reason effectiveness of public procurement: In relation to energy consumption in buildings statutory city bridge and it set up or established companies or buildings surrounding communities, it is necessary to ensure the supply of electricity for the period 2016-2017 (the current contract ends on December 31 2015).

Electricity

Statutární město Most | Published September 11, 2015
cpvs
09310000

Elektrická energie

Supply of electricity - Part 1

Statutární město Most | Published August 20, 2015
cpvs
09310000

This is to ensure electricity supply for the City of Most, it established or founded the company and the surrounding communities for a period of 2 years. It is the security of supply of electricity in high voltage level for the City of Most, it established or founded the company and the surrounding communities for a period of 2 years. This is to ensure electricity supply in the LV level for the City of Most, it established or founded the company and the surrounding communities for a period of 2 years. Reason effectiveness of public procurement: In relation to energy consumption in buildings statutory city bridge and it set up or established companies or buildings surrounding communities, it is necessary to ensure the supply of electricity for the period 2016-2017 (the current contract ends on December 31 2015).

Electricity

Statutární město Most | Published September 24, 2015  -  Deadline November 11, 2015
cpvs
09310000

This is to ensure electricity supply for the City of Most, it established or founded the company and the surrounding communities for a period of 2 years.

Power supplies

Statutární město Most | Published September 22, 2015
cpvs

This is to ensure electricity supply for the City of Most, it established or founded the company and the surrounding communities for a period of 2 years. It is the security of supply of electricity in high voltage level for the City of Most, it established or founded the company and the surrounding communities for a period of 2 years. This is to ensure electricity supply in the LV level for the City of Most, it established or founded the company and the surrounding communities for a period of 2 years. Reason effectiveness of public procurement: In relation to energy consumption in buildings statutory city bridge and it set up or established companies or buildings surrounding communities, it is necessary to ensure the supply of electricity for the period 2016-2017 (the current contract ends on December 31 2015).

Energy-efficient pension for the elderly - ul. Komořanská 8182, Most

Statutární město Most | Published June 3, 2015
cpvs

These are: - thermal insulation of external walls of buildings A, B, including the perimeter walls of the balconies and the realization of curtain walls on the eastern side of the stair vertical (replacement of insulation and jacketing Boletického panel) - insulation of building C in 1.NP (Boletická jacket) realizations light walls, - replacement of original windows still openings on the 1st floor Building C and the insulation of walls - insulation double-layer roofs Building C - the transfer of existing hromosvodný system on all objects and perform a new audit reports - implement the new covering roofs of buildings and balconies, B on the west and east side.

Reducing the energy intensity of the elementary school building in ul. Rozmarýnová 1692, Most - additional works

Statutární město Most | Published June 3, 2015
cpvs

These are additional works, which consist of modifying the downward slope of the roof.

Electricity

Statutární město Most | Published August 22, 2015
cpvs
09310000

Dodávky elektrické energie – část 1.

Guarding

Sdružení zadavatelů SEAS, ECHAS a DKAS | Published April 29, 2015  -  Deadline June 3, 2015
cpvs

The subject of the public contract is a contract to provide security services in the areas of Client - implementation guard services, patrol services in the form of exit units, cooperation with the police and IRS components, monitoring security cameras continuously manned control center - Central Operations Centre, the operation of the dispenser serial tickets for coal along the axis of the car park at the coal preparation plant, sorting vehicles and their organization departures from the car park to load coal resolve potential conflicts between vehicle drivers and also in collaboration with the Police, downloading of snow on the car park, scattering shunting parking gritting material in winter, cleaning the car park areas, including oil spills, to ensure the safety of trapping animals and refuse disposal of dead animals found, etc. Public procurement is divided into 3 parts based on locations outsourcer (ie. at the same time according to the sites of individual members of the association sponsor ). Guarding Company sites NORTHERN ENERGY AS Guarding the sites of the Chvaletice power plant sites AS Guarding Company Kohinoor as DISPOSAL The Contracting Authority reserves the right to cancel this tender procedure without stating any reason in accordance with § 84 par. 5 of the PPA. The Contracting Authority reserves the right to: (a) in accordance with the law to change the tender conditions, (b) not to return the submitted bids, (c) reject all offers, (d) not to enter into a contract with any of the candidates, (e) verify the facts stated in offers, (f) cancel the award procedure without giving a reason, but no later than the conclusion of the work.

Energy-efficient pension for the elderly - ul. Komořanská 818/2, Most

Statutární město Most | Published March 25, 2015
cpvs

These are: - thermal insulation of external walls of buildings A, B, including perimeter walls and balconies realization of curtain wall on the east side of the stair vertical (exchange of heat insulation panel Boletického) - insulation of building C in 1.NP (Boletická jacket) realizations light walls, - exchange yet original fillings on the 1st floor Building C and insulation walls - insulation double-layer roofs Building C, - the transfer of existing hromosvodný system on all objects and perform new audit reports, - implementation of new roofing roofs over balconies of buildings A, B on the west and east side. The realization of this project will fulfill the long-term intentions of the contracting entity in accordance with the current strategic plan for city development Most. It will also be filled with contracting strategies on achieving energy savings. This is a building works related to thermal insulation composite system facades of the building, including reconstruction of the roof. insulation, replacement of doors otvorů.Jedná is to improve the technical condition of buildings owned zadavatele.Veřejná contract 03/2015; assumption of implementation 05-09 / 2015.

Implementation of energy saving measures in buildings SST Most - asbestos removal

Střední škola technická, Most, příspěvková organizace | Published April 3, 2015
cpvs

In accordance with a construction permit contractor performed prior to the commencement of construction work survey, whether interfenestral insulating inserts (MIV) do not contain asbestos. Based on the survey conducted by DEKONTA, asbestos was found in MIV. On this basis, negotiations were initiated with KHS Usti Region, which set the conditions to further the implementation of the initial public procurement act

Reconstruction of 3 buildings in kindergarten Most - reducing energy intensity - Part 2 - insulation kindergarten in the street Anthony Sochora - additional works

Statutární město Most | Published March 13, 2015
cpvs

These are additional works, which consist of new insulation solutions, erection and dismantling of scaffolding incl. protective nets.