Reducing the energy intensity of the House of Culture Kaplice

Město Kaplice | Published October 15, 2014
cpvs

The subject of the public contract construction work related to energy savings and reducing the energy intensity of Culture House (SO 01) and information center (SO 02) in Kaplice, which consist mainly of facades, roof construction, as well as the exchange of original fillings.

Reducing energy intensity Polyclinic Kaplice

Město Kaplice | Published October 7, 2014
cpvs

The subject of the public contract construction work associated with a reduction in the energy intensity of buildings Polyclinic in Kaplice. Construction work shall include facade contact system and mounted thermal system, further insulation of the roof structure blown insulation based on cellulosic fibers and plates made of polystyrene foam and replacement of existing fillings for new windows and doors, aluminum and plastic. The delivery is also removing asbestos boards construction boletického and ensuring disposal of hazardous waste in accordance with applicable legislation.

Reducing energy intensity and areal of Practical School Omlenická, Kaplice

Město Kaplice | Published March 16, 2015
cpvs

The subject of the public contract construction work related to energy savings and reducing energy buildings Basic and Practical School, Omlenická Nos. 436 Kaplice, which consist primarily of complete building insulation and replacement of initial filling holes.

Reducing energy intensity School Elementary School campus, Kaplice

Město Kaplice | Published January 28, 2015
cpvs

The subject of the public procurement are works related to reducing the energy performance of buildings in the area elementary school School, No. 226, Kaplice. There are five buildings (three teaching pavilions, dining room and gymnasium) interconnected passageways.

Reducing energy intensity Elementary School campus Fanta, Kaplice

Město Kaplice | Published February 17, 2015
cpvs

The subject of the public procurement are works related to reducing the energy performance of buildings in the area elementary school Fanta, No. 446 street Gen. Fanta in Kaplice. There are five buildings (two teaching pavilions, kitchen with dining room, workshop and gym) interconnected passageways.

Reducing the energy intensity of the complex basic and practical schools Omlenická, Kaplice

Město Kaplice | Published October 9, 2014  -  Deadline August 31, 2015
cpvs
45000000

The project is to improve the thermal properties of building structures and basic practical schools Omlenická in Kaplice, ie. Facade insulation, ceiling insulation and roof replacement of original windows and openings. Justification of expediency: The investor is undertaking construction works related to energy savings and reductions in energy intensity and areal of Practical School Omlenická, Kaplice. Implementation of the project will reduce energy intensity operation of the complex, and thus reduce energy consumption and CO2 emissions. Any alternative solutions do not have the required efficiency. Implementation is the only currently possible way to achieve the planned objectives. The future status or negative effect is not expected. Qualification requirements will be selected in accordance with the framework and requirements arising from the grant program terms and conditions laid down by law no. 137/2006 Sb., On Public Procurement, as amended. Estimated contract value is based on the assumption of the project (budget drawn up by the designer) - 10 500 000, - CZK without VAT - 12 500 000, - CZK without VAT. Preliminarily estimated date of realization: 03/2015 - 08/2015.

Reducing the energy intensity of primary school premises Fanta, Kaplice

Město Kaplice | Published November 11, 2014
cpvs

The subject of the public contract construction work associated with a reduction in the energy performance of buildings within the primary school Fanta, No. 446 street Gen. Fanta in Kaplice. There are five buildings (two teaching pavilions, kitchen with dining room, workshop and gym) interconnected passageways.

Reduction of energy intensity Elementary School campus School, Kaplice

Město Kaplice | Published November 10, 2015
cpvs

The subject of the public contract, the construction work associated with the reduction of energy intensity of buildings in the area elementary school School, No. 226 in Kaplice. There are five buildings (three training halls, cafeteria and gymnasium) interconnected passageways. The works include mainly insulation of exterior walls contact system with polystyrene foam respectively. mineral wool and partially mounted trunking insulation system, thermal insulation of walls and skirting some roof structures. The delivery is also partial disassembly of the outer panel boletického passageways and insulation mounted trunking system. It will also be a replacement for existing interwindow inserts and replaced still not exchanged fill openings for new windows and aluminum entrance doors.

Additional works for action: Reducing energy intensity Polyclinic Kaplice

Město Kaplice | Published November 26, 2015
cpvs

Subject to additional works are works related to the following items: a) the Conductor b) Changing the design of the roof gutter c) measures when working with asbestos d) Input panel e) Lamps and Roof manhole f) Electrics for předokenním shutters g) Repair of bridges on fire staircase h) Remove gutter and sidewalk) Inner sill j) Thermal insulation panels for Boletic k) window film l) The actual acreage items Notification of the original contract was under no. 494994 published on 19. 1. 2015.

Additional works for action: Reducing the energy intensity of primary school campus Fanta, Kaplice

Město Kaplice | Published October 14, 2015
cpvs

Subject to additional works are works related to: • change in design and scope insulation footing part of the objects below ground level • change in casting fillings in their numbers, parapets, safety features, client changes • Reconstruction of inputs including stairways and roofing • changing the ventilation of the attic SO 03, repairing chimneys, ventilation • repairing roof outbuilding SO 02 Notification of the original contract was under no. 497898 published on 17 February 2015.
  • 1