Public tenders for energy in Jihlava Czech Republic

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Electricity, heating, solar and nuclear energy

Kraj Vysočina | Published May 23, 2017  -  Deadline June 28, 2017
cpvs
09300000, 09331000, 44621220, 30213100, 45351000, 42511110

The subject of the public contract is the supply of 3 centers of renewable energy sources, including their assembly and training of the personnel of the contracting authority. The purpose of the public contract is to modernize the technical equipment of secondary vocational schools in order to correspond to the modern technologies and practices used in practice and to improve the quality of teaching in order to increase the applicability of students in technical fields in the labor market.

The methodology of valuation of fixed assets of energy companies - gas and electricity sector

Česká republika - Energetický regulační úřad | Published November 25, 2014
cpvs
79419000

Methodology for valuation of fixed assets of energy companies in the sector of gas and electricity, which will serve as the basis for a binding instruction to perform a revaluation of energy companies processing methodology for the valuation of fixed assets of energy companies in the gas sector, which will serve as the basis for a binding instruction to perform revaluation energy companies processing methodology for the valuation of fixed assets of energy companies in the energy sector, which will serve as the basis for a binding instruction to perform a revaluation of energy companies) description needs to be fulfilling a public contract fulfillment - to ensure processing methodology for valuation of fixed assets in regulated entities gas and electricity sector, b) a description of the subject contract - see point II.4, c) a description of the relationship between the subject contract and the client's needs - contracting methodology as the basis for a binding instruction / procedure for processors revaluation of fixed assets of regulated entities operating in the sector energy (gas, electricity), for the purpose of setting regulatory conditions, d) the estimated due date for a public contract - no later than six months after signing the contract with the successful (winning) bidder

Delivery centers of renewable energy sources for the project from idea to product 2

Kraj Vysočina | Published July 22, 2015
cpvs

The subject of the tender is the supply of three centers of renewable energy for the purposes of teaching in three schools. Each of the centers of renewable consists of various types of heat pumps, photovoltaic panel and a solar panel including control and regulation. Also included is the installation of all equipment in school buildings under implementation projects.

Saving energy company forges and Moravian

Moravské kovárny, a.s. | Published August 18, 2016
cpvs

The subject of this contract, the construction work. A supplier may submit an offer for all the parts, but also on some of the parts of this contract. The project is the revitalization of selected objects in the area of ​​Moravian and forges in Jihlava (MOKOV). All these measures are designed to improve both thermal technical and energy properties of the object. A) Construction of the lightning current and skylights will be canceled and replaced with a new roof structure, also includes new construction skylights. Part B) Electrical - Lighting The project includes the upgrading of lighting and related electrical modification, and in objects independently solves part PD: D.1.4.B_Modernizace lighting and related electrical adjustment. The management system also enables further DALI well as any future reconfiguration of the lighting system without interference in the actual execution of electrical installations (circuit changes, change of control, etc.). Part C) HVAC ventilation device designed in this project, is required to ensure proper climatic conditions in the object space according to the requirements of the Building Act, the decree on general technical requirements for construction, applicable standards, sanitary and fire regulations and the requirements of other technologies in buildings installed . The purpose of installing air-conditioning units to improve the microclimate ventilated area manufacturing plants use more efficient, modern technology and the overall revitalization of the outer roof deck the halls. The proposed system will be designed as a relief. Existing skylights would be abolished and replaced with a new roof structure, also includes new construction skylights. Solved buildings in the complex: SO 08 - Material cutting 3,722 m2 SO 09, 11, 12 - Smithy, incl. administrative and social cervices 6996 m2 SO 10 - Heat treatment of 6,237 m2 SO 07 - Social building 1,156 m2 SO 33 - Expedition 1674 m2 SO 40 - Stock dies 1029 m2 6 ZD - Part A - Building part and lightning). The project also includes upgrading lighting and related electrical modification, and in objects independently solves part PD: D.1.4.B_Modernizace lighting and related electrical adjustment. The management system also enables further DALI well as any future reconfiguration of the lighting system without interference in the actual execution of electrical installations (circuit changes, change of control, etc.). Applicants also submit a quotation: • Calculation of lighting on the buildings respects these specifications including the source file • maintenance schedules for individual areas (maintenance factor calculation) • catalog lists specific fixtures offered to perform the contract. Evaluation of the bids submitted on the technical side will be made on the basis of the output from a computer program (including source files). 7 TD). Air handling equipment designed in this project, is required to ensure proper climatic conditions in the object space according to the requirements of the Building Act, the decree on general technical requirements for construction, applicable standards, sanitary and fire regulations and the requirements of other technologies installed in buildings. The purpose of installing air-conditioning units to improve the microclimate ventilated area manufacturing plants use more efficient, modern technology and the overall revitalization of the outer roof deck the halls. The proposed system will be designed as a relief. The entire system of compensation for air and heating will work with the residual heat from the buildings with surplus energy: • SO 09 Smithy • SO 10 Heat treatment of these surpluses will be heated places where there is increased ventilation, or move material from / to the building, a space with energy shortages: • SO 08 material division • SO 33 Expedition Both of these areas are intertwined in object SO 09 Smithy. To move air from the SO 08 SO material division into 09 Smithy are used interconnecting piping over by a neck to prevent drafts just in connecting corridors. To move air from 33 SO SO Expedition 10 Heat treatment is used connecting pipes over by a neck to prevent drafts in connecting corridors. 6 ZD - Part C - AHU). Part A), construction work and lightning 360/1992 Coll., As amended by the profession of authorized architects and the profession of authorized engineers and technicians active in construction. Part B) Electricity - Required minimum illumination level: At least 3 contracts of similar nature, volume each minute. For similar works authority considers that the work consisting in the supply and installation of electrical wiring and lighting for industrial, commercial and public buildings, with at least 1 work demonstrably carried out while operating the building (to be documented in a list or certificate); 1 work demonstrably solved through lighting LED luminaires built-up area of ​​at least 10.000 m2 (to be demonstrably evidenced by the list or certificate). 1 powder

Delivery centers of renewable energy sources for the project from idea to product 2

Kraj Vysočina | Published March 9, 2015
cpvs
42511110

The subject of procurement is the delivery of three centers of renewable energy resources for education in three secondary schools. Each of the centers of renewable consists of various types of heat pumps, photovoltaic panel and a solar collector including the management and regulation. Also included is the installation of all equipment in school buildings under implementation projects. a) Description of requirements to be fulfilled by meeting procurement: Fulfilling the procurement to be filled with needed modernization of technical equipment of secondary vocational schools, and to conform to modern technology and procedures used in practice, and enhance the quality of teaching in order to increase the employability of engineering students at the labor market. b) Description of the procurement: The subject of the contract is to supply three centers of renewable energy resources for education in three secondary schools. Each of the centers of renewable consists of various types of heat pumps, photovoltaic panel and a solar collector including the management and regulation. Also included is the installation of all equipment in school buildings under implementation projects. c) A description of the relationship between the subject contract and the client's needs: Implementation of a public contract is a prerequisite for meeting the client's needs. d) Expected date of fulfillment of public contracts: Sponsor assumes compliance with procurement no later than September 2015.

Delivery of renewable energy centers

Kraj Vysočina | Published May 22, 2017  -  Deadline June 28, 2017
cpvs
09300000

Methodology for valuation of fixed assets of energy companies - gas and electricity sector

Česká republika - Energetický regulační úřad | Published April 30, 2015
cpvs

Developing a methodology for valuation of fixed assets of companies in the gas and electricity sector, designed to adjust the regulatory asset base of energy companies, including recommended procedures and controls during the actual awards.

The methodology of valuation of fixed assets of energy companies - gas and electricity sector

Česká republika - Energetický regulační úřad | Published January 12, 2015
cpvs

Developing a methodology for the valuation of fixed assets of companies in the sector of gas and electricity, for setting the regulatory asset base of energy companies, including recommended practices and controls during the actual awards. Duration of the contract under point II.3 is specified in the tender documents (https://zakazky.eru.cz/vz00000086)

Energy conservation measures - ZS E. Rošického 2 detached workplace Spring 22, Jihlava

Statutární město Jihlava | Published June 30, 2015
cpvs

The subject of the tender is the implementation of energy saving measures consisted in replacing fillings facade insulation cladding contact insulating system, insulation roof structures of buildings and associated related and caused by construction work Elementary School Jihlava, E. Rošického 2 detached workplace Spring 22nd energy saving measures will be carried out on the building of primary school, which consists of original parts and extension.

Energy conservation measures - ZS E. Rošického 2 detached workplace Spring 22, Jihlava

Statutární město Jihlava | Published April 23, 2015
cpvs

The subject of procurement is to implement energy saving measures consisting in replacing doors, windows, insulation facade cladding contact system, insulation roof structures and associated buildings and related construction work caused by the primary school Jihlava, E. Rošického 2 detached workplace Spring 22nd energy saving measures will be carried out on the building of primary school, which is made up of original parts and extension. The complete tender documentation, including all attachments, is published on the profile of the submitter.

Energy conservation measures - ZS E. Rošického 2 detached workplace Spring 22, Jihlava

Statutární město Jihlava | Published March 4, 2015  -  Deadline October 30, 2015
cpvs
45214200

The subject of procurement is to implement energy saving measures consisting in replacing doors, windows, insulation facade cladding contact system, insulation roof structures and the associated adjustments to the primary school Jihlava, E. Rošického, detached workplace Spring 22 of the reasoning effectiveness of public procurement) Description needs to be filled with the fulfillment of public contracts. The main objective of the project is to reduce the energy intensity of the object Elementary School Jihlava, E. Rošického, detached workplace Spring 22, by improving the thermal properties of roof structures and buildings. b) A description of the subject contract. The subject of procurement is to implement energy saving measures consisting in replacing doors, windows, insulation facade cladding contact system, insulation roof structures and the associated adjustments to the primary school Jihlava, E. Rošického, detached workplace Spring 22nd c) The interrelationship of the public contract and the client's needs. After the implementation of public procurement will meet the entire object recommended value of average coefficient of heat the building envelope. Will reduce energy consumption for heating the building and in connection therewith to reduce the amount emitted into the atmosphere, improve environmental quality and reduce operating costs. Individual design will meet after the implementation of the measures proposed in the projects recommended value of heat transfer coefficient of the building according to CSN 73 0540-2. d) Expected date of fulfillment of public contracts 10/30/2015

Energy savings in the building DM Světlá

Kraj Vysočina | Published October 22, 2014
cpvs

Implementation of the thermal insulation system and replacement of door and window elements on the subject of home-college Youth Academy, grammar and secondary schools Světlá, after

Reducing the energy intensity of primary schools Demlova 32 and 34, Jihlava - II. phase

Statutární město Jihlava | Published December 22, 2014
cpvs

The subject of the tender is insulation cladding and roof structures of buildings and replacement of doors, windows and related work for buildings of primary schools Demlova 32 and 34. The subject II. stages of this project are pavilions designated A1-A3 (input objects), C (teaching pavilion), G1-G3 (connecting necks), D1-D2 (cloakrooms gyms), E1-E2 (gymnasium), H (dining room). On all these objects are implemented energy saving measures consisting in replacing doors, windows, insulation of facades contact system with insulating mineral fiber insulation of flat roofs and adding structural layers of polystyrene with upper insulating layers.

Reducing the energy intensity of primary schools Demlova 32 and 34, Jihlava - II. stage

Statutární město Jihlava | Published October 20, 2014
cpvs

The subject of the public contract is insulation cladding and roofs of buildings and replacement of doors, windows and related work for buildings of primary schools Demlova 32 and 34. The subject II. stages of this project are pavilions marked A1-A3 (input objects), C (teaching pavilion), G1-G3 (connecting necks), D1-D2 (changing rooms of gyms), E1-E2 (gymnasium), H (dining room). In all of these objects will be implemented energy saving measures consisting in replacing windows and doors, insulation of facades heat cladding with insulation boards made of mineral fibers and flat roof insulation by adding structural layers of polystyrene with top insulating layers.

Elementary school Jungmannova 6, Jihlava - Renewal of a technical evaluation of school playgrounds - III. Stage and reducing energy intensity

Statutární město Jihlava | Published June 4, 2015
cpvs

The subject of public procurement is the renewal and technical evaluation of the existing playground at the elementary school campus Jungmann 6, Jihlava, including exchange fencing playground equipment and supplies (bins, gates, benches, tables, etc.). The existing sand playground will be replaced by a new multifunctional playground with artificial polyurethane surface that will be used for general-purpose sports (soccer, basketball, handball, tennis, volleyball, etc.), With an adjacent runway and landing area for the long jump. In the school yard will be built boccie court, an outdoor gym and an outdoor classroom under the pergola. Everything will be accompanied by access roads (footpaths and access road.). Multifunctional playground will be fenced fencing system. Drainage courses will be implemented by new drainage troughs, ducts to the newly built sewers in a follow up project construction work. It is also subject to procurement implementation of energy saving measures at the school building. In the context of energy saving measures is solved insulation cladding, flat roofs and ground floors. Most of fillings has been replaced in the previous period, this action changes only ones that have not been previously amended. Also they will be performed construction work of the school and drainage. Notably the dehumidify the basement of the school building and the perimeter walls and the construction of storm sewers, which will be realized together with drainage field.

Elementary school Jungmann 6, Jihlava - Renewal and technical evaluation of school playgrounds - III. Stage and reducing energy intensity

Statutární město Jihlava | Published March 26, 2015
cpvs

The subject of procurement is to restore and technical evaluation of the current course in the elementary school campus Jungmann 6, Jihlava, including exchange fencing supplies and playground equipment (baskets, gates, benches, tables, etc.). Existing sand playground will be replaced by a new multifunctional playground with artificial polyurethane surface, which will be used for general-purpose sports (soccer, basketball, handball, tennis, volleyball, etc.), With adjoining the runway and landing area for the long jump. In the school yard will be built pétanque area, outdoor gym and an outdoor classroom under the pergola. Everything will be complemented by access roads (pavements and access road.). Multifunctional playground will be fenced fencing system. Drainage course will be implemented with new drainage troughs, ducts to the newly constructed drains in a follow up project construction work. It is also subject to procurement implementation of energy saving measures at the school building. In the context of energy efficiency measures is solved insulation cladding, flat roofs and floors of the soil. Most fillings has been replaced in the previous period, this action changes only those that have not previously been amended. Also will be carried out construction work of the school and drainage. In particular, it is the dehumidification of the basement of the school building and the perimeter walls and the construction of storm sewers, which will be implemented together with the drainage field. A detailed description of the subject matter is presented in the project documentation for the execution, which are contained in Annex no. 5 ZD.

Electricity

Statutární město Jihlava | Published February 23, 2017  -  Deadline April 3, 2017
cpvs
09310000, 09123000

The subject of public procurement is to ensure the supply of electricity and natural gas for the period from 1 July 2017 to 30 June 2018 (natural gas from July 1, 2017, 6:00 am. To 1 July 2018, 6:00 pm.) For the City of Jihlava, its allowance organization and company owned partly by a statutory city, according to the valid contract for central procurement.

134/2016 Coll., On public procurement (ZZVZ).

The central entity procures energy supply for their need.

For the company Laundry and dry cleaning Jihlava, Ltd. supply will be implemented from 1 January 2018 to 30 June 2018.

1 Public Procurement (unregulated power part, which is subject to public procurement and private electronic auctions) according to the current rate is 7.66 million CZK excluding VAT, taxes on electricity distribution and payment system services.

458/2000 Coll., The Energy Act, as amended.

2 Public Procurement (unregulated power part, which is subject to public procurement and private electronic auctions) according to current rates is 1,848,000 CZK excluding VAT, taxes on electricity distribution and payment system services.

The subject of the third part of the public contract is a physical delivery of natural gas and associated services, including securing distribution in the period from July 1, 2017 from 6:00 am. To 1 July 2018 to 6:00 pm. In the expected range of 8 747.70 MWh nature of retail customers, in the range of 15 591.20 MWh character středoodběr / wholesale customers.

3 Public Procurement (unregulated power part, which is subject to public procurement and private electronic auctions) according to the current rate is 9.98 million CZK excluding VAT, taxes on gas payments for distribution and system services.

Energy savings - SPŠ Pelhřimov - teaching pavilion Friedova

Kraj Vysočina | Published April 8, 2015
cpvs

Subject of procurement is in thermal insulation of external walls and roof of the building (at Friedova 1469, Pelhřimov).

Energy savings - Třebíč Hotel School - a boarding house

Kraj Vysočina | Published March 10, 2015
cpvs

Subject of procurement is in thermal insulation of external walls, roofs and replacing most of fillings at the object boarding Třebíč Hotel School (at Tomas Bata 609, 674 01 Třebíč).

Energy savings - SPŠ Pelhřimov - teaching pavilion Friedova

Kraj Vysočina | Published December 22, 2014
cpvs

Subject of procurement is in thermal insulation of external walls and roof of the building (at Friedova 1469, Pelhřimov). Sponsor publishes the tender documents in full from the date of publication of the tender procedure at zadaavtele profile under the name of the tender.