Public tenders for energy in Chomutov Czech Republic

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

VD GENOA - CONSTRUCTION MVE

Povodí Ohře, státní podnik | Published January 12, 2016
cpvs
45251120

MVE is subject to execution of hydroelectric power potential of the waterworks Genoa. Energy potential VD Genoa tanks will be used for electricity production. For this purpose the second object in the current bottom outlet installed turbine. Installation of small hydropower plants in the building of the second bottom drain runoff conditions will not deteriorate trough Loupnice in pertinent part of the flow. According to CSN 75 2601, according to the total installed capacity is about HPP II. Category turbines with a rated power of 125 kW. The total absorption capacity sets small hydropower plants is 0,250 m3.s -1. Breakdown of construction and operational units: SO 01 Engine room and the influx of small hydropower plants (HPP) technology PS 01 turbines with accessories PS 02 Power electrical, instrumentation and control (M & C), data transmission part II - Transfer of power. MVE energy, which will be fitted to the bottom outlet construction is positioned so that the optimum possible extent allowed transmission power. energy from MVE. Production technology is not relevant.

VD GENOA - CONSTRUCTION MVE

Povodí Ohře, státní podnik | Published August 29, 2016
cpvs

MVE is subject to execution of hydroelectric power potential of the waterworks Genoa. The energy potential of the tank VD Genoa will be used for generating electricity. To this end, the object in the current second bottom outlet installed turbine. Installation of small hydropower plants in the building of the second bottom drain runoff conditions will not deteriorate trough Loupnice in pertinent part flow. According to CSN 75 2601, according to an installed capacity of HPP is a II. Category turbine with a rated output of 125 kW. The total absorption capacity sets small hydropower plants is 0,250 m3.s -1. Breakdown of construction and operational units: SO 01 Engine room and the influx of small hydropower plants (HPP) technology PS 01 turbines with accessories PS 02 Power electrical, instrumentation and control (M & C), data transmission part II - Transfer el. energy from MVE, which will be fitted to the bottom outlet construction is positioned so that the optimum possible extent allowed transmission power. power from HPP. Production technology is irrelevant
  • 1