Public tenders for coal in Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergycoalGermany

coal pulverising mills

RWE Service GmbH | Published December 6, 2012
cpvs
43414100

coal pulverising mills

Fine coal.

Emschergenossenschaft | Published November 22, 2013  -  Deadline January 28, 2014
cpvs
09111210

Supply of fine coal into subsets on demand operation.

Hard coal

Emschergenossenschaft | Published October 7, 2017  -  Deadline November 14, 2017
cpvs
09111210

Call for the supply of approx. 34,000 tonnes of fine coal for a period of 2 years (17,000 t / a).

Hard coal

Emschergenossenschaft | Published November 11, 2015  -  Deadline January 11, 2016
cpvs
09111210

Polling contract to supply up to 17 000 t / a fine coal for a period of 2 years.

Supply of fine coal.

Emschergenossenschaft | Published May 28, 2014  -  Deadline July 22, 2014
cpvs
09111210

Fine coal.

Sputter Coater and coal evaporator

Bundesanstalt für Materialforschung und -prüfung | Published June 28, 2016  -  Deadline July 22, 2016
cpvs

Sputter Coater and coal evaporator

Sputter Coater and coal evaporator

Bundesanstalt für Materialforschung und -prüfung | Published June 28, 2016  -  Deadline July 14, 2016
cpvs

Sputter Coater and coal evaporator according to demanding Vergabeunterlagen

Clearing section of former coal station

Senatsverwaltung für Stadtentwicklung und Wohnen | Published August 1, 2017  -  Deadline August 31, 2017
cpvs
45112000

Clearing section of former coal station

Demolition coal bunker Born 8 LFK

Staatliches Bauamt Augsburg | Published February 3, 2016  -  Deadline February 24, 2016
cpvs

Demolition coal bunker Born 8 LFK

Examination of production costs for German hard coal mining company of the year 2013.

Bundesamt für Wirtschaft und Ausfuhrkontrolle | Published November 19, 2013  -  Deadline December 19, 2013
cpvs
79212500

There are to create two reports, the aim is to examine and determine the cost of production for German hard coal mining company in the calendar year 2013. The reports are used to determine the contributions of coal Financing Act. In examining the guidelines for company accounts in the coal mining industry are taken into account (RBS), directives and decisions of the Federal Ministry of Economics and Technology and the Federal Office of Economics and Export Control. It should be considered: a) A mining company with operations around the Ruhr area (annual production: approximately 8.1 million tons of coal, Lot 1) A mining company in Ibbenbüren (annual production: 1.9 million tonnes of coal; lot 2).

Examination of the production costs for coal mining German company of the year 2014th

Bundesamt für Wirtschaft und Ausfuhrkontrolle, Referat 422 | Published November 17, 2014  -  Deadline December 12, 2014
cpvs

There are 2 create a report whose objective is the analysis and the determination of production costs German mining companies and their differentiation from the decommissioning expenses in the calendar year 2014. The reports are used to determine the contributions according coal Financing Act. When examining the "Guidelines for company accounts in the coal industry (RBS)", directives and decisions of the Federal Ministry of Economics and Technology and the results of previous audits are taken into account. To consider are: a) A mining company located in the Ruhr and the Saar (annual production: about 6 000 000 tonnes of coal; Lot 1), b) A mining company in the area Ibbenbüren (annual production: about 2 000 000 tonnes of coal; Lot 2 ).

Coal

Stadtreinigung Hamburg | Published March 3, 2017
Winner
Rheinbraun Brennstoff GmbH
cpvs
09111100

Delivery of Herdofenkoksstaub for waste recycling plant Borsigstraße GmbH.

Delivery of Herdofenkoksstaub.

Verifying the production costs for coal German Mining Company of the Year, 2015.

Bundesamt für Wirtschaft und Ausfuhrkontrolle, Referat 422 | Published March 11, 2016
Winner
KPMG AG Wirtschaftsprüfungsgesellschaft
cpvs
79212500

There are to create 2 reports, whose aim is the examination and assessment of production costs of German mining companies and their differentiation from the winding-up expenses in the calendar year, 2015. The reports are used to determine the benefits in accordance with the coal Financing Act. When examining the "guidelines for company accounts in the coal industry (RBS)", directives and decisions of the Federal Ministry of Economy and Energy and the results of previous audits are taken into account. They can check:

a) A mining company located in the Ruhr and the Saar (annual production: approximately 4.6 million tons of coal; lot 1);

b) A mining company in the area Ibbenbüren (annual production: approximately 1 700 000 tonnes of coal; Lot 2).

Term disposal of coal tar bitumen mixtures with and without asbestos proportions.

Landeshauptstadt Hannover, Fachbereich Tiefbau | Published August 13, 2013  -  Deadline November 4, 2013
cpvs
90522000

Framework agreement for the acquisition, transportation and disposal of coal tar term bitumen mixtures with and without asbestos shares with a PAH content> 25 mg / kg DM, EWC 170301 *, of various construction projects from the jurisdiction of the Department of Civil Engineering.

Adoption and utilization of coal tar and tar products (roofing felt) AVV number. 17 03 ...

Berliner Stadtreinigungsbetriebe | Published September 14, 2016
cpvs

Adoption and utilization of coal tar and tar products (roofing felt) AVV number. 17 03 ...

Framework agreement for the disposal of bituminous mixtures containing coal tar term EAV 170,301th

Stadt Herne | Published January 15, 2014  -  Deadline March 5, 2014
cpvs
90523000, 44113610

Framework agreement for the disposal of bituminous mixtures containing coal tar term EAV 170,301th

Engineering services (design and construction supervision) - Remediation power plant Gaisburg, part surface coal belt bridge, south-east.

Landeshauptstadt Stuttgart, Tiefbauamt | Published February 11, 2014
Winner
Bietergemeinschaft Klinger und Partner + CDM SmithStuttgart
cpvs
71300000

Engineering services (design and construction supervision) for the remediation of contaminated sites Gaisburg power plant, part of surface coal belt bridge.

petroleum, coal and oil products

Bundesamt für Wehrtechnik und Beschaffung | Published February 16, 2012
Winner
SRS Schmierstoff Vertrieb GmbH Postfach 1216 48497 Salzbergen GERMANY
cpvs
09200000

Herstellung und Lieferung von 74 000 Litern Hydraulikflüssigkeit, H-574.

Disposal of containing coal tar term bitumen mixtures with and without asbestos shares.

Landeshauptstadt Hannover, Fachbereich Tiefbau | Published February 26, 2016  -  Deadline April 7, 2016
cpvs
90522000

Framework agreement for the acquisition, transportation and disposal of containing coal tar term bitumen mixtures with and without asbestos shares with a PAH content> 25 mg / kg DM, EWC 170301 *, of different construction from the purview of the Department of Civil Engineering.

Soil remediation "northern part of the former coal mine and coking plant masses 3/4" in Unna

AAV - Verband für Flächenrecycling und Altlastensanierung | Published October 6, 2016  -  Deadline October 24, 2016
cpvs

Soil remediation "northern part of the former coal mine and coking plant masses 3/4" in Unna