Call +44 800 9755 164

Public tenders for energy in Estavayer-le-lac Switzerland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergySwitzerlandestavayer-le-lac

N05.72 080,011 - Upn. La Neuville - Bienne West VOMA II - Lot 1.1. Energy, lighting, ventilation, signage, cabling and auxiliaries

Office fédéral des routes - Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published February 8, 2017  -  Deadline February 6, 2017
cpvs

N05.72 080,011 - Upn. La Neuville - Bienne West VOMA II - Lot 1.1. Energy, lighting, ventilation, signage, cabling and auxiliaries

N05-Upn.Colombier Cornaux - TP2 / Lot 1.2 Energy S7 wiring, auxiliary S7

Office fédéral des routes - Infrastructure routière Filiale Estavayer-le-Lac | Published March 20, 2015  -  Deadline June 19, 2015
cpvs
45310000

N05 between Serrières and St. Blaise

N05.72 080,011 - Upn.La Neuveville - Biel West - VoMaII - Lot 1.1 Energy, lighting, ventilation, signage, cabling and auxiliaries (4354 ID)

Office fédéral des routes - Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published March 17, 2017  -  Deadline May 19, 2017
cpvs
45310000

CPV: 45310000 - Electrical installation work,
34996000 - control equipment and control, safety or signaling equipment for roads,
45311000 - wiring work and electrical installations,
45314300 - Installation of cable infrastructure,
45315500 - medium-voltage installation

N05.72 080,011 - Upn. La Neuville - Bienne West VOMA II - Lot 1.1. Energy, lighting, ventilation, signage, cabling and auxiliaries

Office fédéral des routes - Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published February 8, 2017  -  Deadline April 10, 2017
cpvs
45310000

National road N05 between half-junctions of Twann and Twann-West-Ost and Sisto evacuation gallery in the municipalities of La Neuveville, Ligerz and Twann-Tüscherz.

N09.40 080,474 - Ant.Vallorbe - Essert-Pittet - Securing traffic (step 2) - TP2 - Lot 1 - EES energy-wiring work

Office fédéral des routes - Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published November 21, 2015  -  Deadline January 22, 2016
cpvs
45315100

The work required to form part of the traffic security (step 2) of the national road section Vallorbe - Essert-Pittet. The traffic security project (step 2) is to keep the substance of the existing alignment, to ensure user safety and preserving the ability to service through maintenance measures technically and economically optimized pending the achieving UPlaNS around the stretch. The boundaries of the project are part TP2 defined to the west by the junction of Ballaigues and east by the Junction of Orbe. Interventions at the BSA will also be made on the part section between Junction TP3 Orbe and ramification of Essert-Pittet The principal subject of this tender include: -New distribution cabinet cable -Tirage BT (approx. 10km) -Tirage Fiber Optic Cable (approx. 15km) -Power field devices (weather station, cameras, radar, ...) -Dévoiement cables and electromechanical equipment The company provides training / Education employees of maintenance services in accordance with the design specifications and pos. 751 500 Special Conditions SEA.

Electrical engineering installation works

Office fédéral des routes — infrastructure routière Ouest — Filiale Estavayer-le-Lac | Published March 24, 2016
Winner
Cablex AG
cpvs
45315100

N09.40 080,474 - Ant.Vallorbe - Essert-Pittet - Securing traffic (step 2) - TP2 - Lot 1 - Construction of SEA-energy wiring.

N12 Ext. Resting Place La Joux Bridges - BSA.001 main electromechanical works - next Alps.

Office fédéral des routes — infrastructure routière Ouest — filiale Estavayer-le-Lac | Published March 19, 2016  -  Deadline April 29, 2016
cpvs
45311000

The project involves the adaptation and extension of the Alps near the resting place of the Joux Bridges located along the N12 highway on the territory of the Commune of Sâles (FR).

A partial redevelopment of the existing rest area is provided and a multi-functional extension to the east to provide a possibility to camp for Travellers.

Jura side of the place of rest "Joux Bridges" is not concerned by this tender.

This contract covers the main electromechanical works of the project which include without limitation:

- The work of energy distribution,

- The lighting work,

- Wiring work.

N01 Upn.Bernex - Ferney - VOMA Tunnels Confignon and Vernier - SEA work Electrical wiring and lighting - Lot 120

Office fédéral des routes - Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published August 22, 2016  -  Deadline October 19, 2016
cpvs
45311200

Context of the project :
N1 motorway section of the bypass Geneva high traffic (75,000 vehicles per day).

Project description :
Getting urgent compliance of operating and safety equipment SEA as part of tunnel safety works Confignon, Vernier and goats.
These works concern the following areas in SEA:

D-1 Power Distribution:
- Extension of energy LV switchgear,
- Installation of new LV distribution networks.

D-2 lighting:
- Partial replacement of the lighting management system D-2 Level 1 (CL) and 2 (CI) and interface with the GS,
- Renewal of lighting,
- Renewal of the emergency lighting in case of fire,
- Renewal / Installation of lighting escape routes.

D-4 signaling:
- Renewal / Installation of signage of emergency exits and escape routes

D-5 Surveillance systems:
- Partial installation of a diverse system including its management system 5.3 D-1 (CL) and 2 (CI) and interface with the GS.

D-7 cabling systems:
- Installation of new fieldbus optical fibers,
- Installation of earthing equipment.

Electrical fitting work

Office fédéral des routes — Infrastructure routière Ouest — Filiale Estavayer-le-Lac | Published August 26, 2016  -  Deadline October 19, 2016
cpvs

Context of the project:

N1 motorway section of the bypass Geneva high traffic (75,000 vehicles per day).

Project description:

Getting urgent compliance of operating and safety equipment SEA as part of tunnel safety works Confignon, Vernier and goats.

These works concern the following areas in SEA:

D-1. energy distribution:

- Extension of power distribution LV switchboards,

- Installation of new LV distribution networks.

D-2. Lighting:

- Partial replacement of the management system of lighting D-2 level 1 (CL) and 2 (CI) and interface with the GS,

- Renewal of lighting,

- Renewal of the emergency lighting in the event of fire

- Renewal / Installation of lighting escape routes.

D-4. signage:

- Renewal / Installation of signage of emergency exits and escape routes.

D-5. Monitoring facilities:

- Partial installation of various systems including its management system 5.3 D-1 level (CL) and 2 (CI) and interface with the GS.

D-7. cabling installations:

- Installation of new field optical fiber networks,

- Installation of earthing equipment.

Solar installation

Commune d'Yverdon-les-Bains service des énergies | Published January 12, 2016  -  Deadline February 18, 2016
cpvs
09332000

Solar photovoltaic installations on the roofs of the following municipal buildings: the gym Marive, funeral center and building Energy Department.

CFC 23-33 Electricity in heating plant

RWB Hydroconcept Sàrl | Published June 28, 2016  -  Deadline August 10, 2016
cpvs
09310000

The future of thermal power EPO (penitentiary plain of the Orb) will provide all the heat requirements needed to operate the site, in the form of hot water and steam.

Any heat production will be centralized in one and the same site. The energy used agents are wood, solar and gas.

This contract consists of the electrical connections of all boilers and device located in and goshawks Central. The installation is located on a prison site, a surveillance system, access control and secure communication must also be established.

Electricity

RWB Hydroconcept SÀRL | Published July 2, 2016  -  Deadline August 10, 2016
cpvs
09310000, 65310000, 65300000, 45311000, 45311100, 45314300, 45314310, 45315300, 45317000

The future of thermal power EPO (penitentiary plain of the Orb) will provide all the heat requirements needed to operate the site, in the form of hot water and steam.

Any heat production will be centralized in one and the same site. The energy used agents are wood, solar and gas.

This contract consists of the electrical connections of all boilers and device located in and goshawks Central. The installation is located on a prison site, a surveillance system, access control and secure communication must also be established.

  • 1