Call +44 800 9755 164

Public tenders for energy in Bern Switzerland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

power procurement

FINMA Beschaffungs- und Vertragsmanagement BVM | Published January 19, 2017  -  Deadline February 28, 2017
CPV: 71314000 - Energy and related services

electrical power supply

Gestion des contrats et de l'approvisionnement BVM | Published January 19, 2017  -  Deadline February 28, 2017
CPV: 71314000 - Energy and related services

Architectural, construction, engineering and inspection services

armasuisse Immobilien Baumanagement | Published December 20, 2016  -  Deadline February 10, 2017

Background:

In addition to military assignments the MZH is to off-peak hours for civilian assignments (use by teams) available.

Because of the outdated building and technical substance, the building does not meet the present structural and energy requirements and should therefore be restored.

project Description

The building consists of ...

starting position

In addition to military assignments the MZH is to off-peak hours for civilian assignments (use by teams) available.

Because of the outdated building and technical substance, the building does not meet the present structural and energy requirements and should therefore be restored.

project Description

The building consists of ...

Electricity distribution

SBB AG Infrastruktur Einkauf Energie | Published January 10, 2017  -  Deadline February 2, 2017

Die SBB AG in der Schweiz bezieht pro Jahr für ca. 2500 Objekte rund 300 GWh elektrischen Strom 50 Hz. Mit der zur Ausschreibung Strombeschaffung sucht die SBB AG für Stromlieferanten ausgewählte Bezugsstandorte.

Ende 2017 läuft der aktuelle Stromliefervertrag der Tranche A 1.Teil aus der SBB.

Die Bezugsmenge der Teil 1. Tranche A ab 01.01.2018 beinhaltet 16 Bezugsstandorte und eine Strommenge von ca. 29.9 GWh / Jahr mit einer Vertragslaufzeit ab dem 01.01.2018 bis 31.12.2020 maximum.

SBB buy about 300 GWh of electricity per year to 50 Hz in Switzerland to supply some 2,500 objects. They launched a tender procedure to find suppliers able to guarantee energy supply for a number of sites.

End 2017, the contract to supply current energy SBB for tranche A, Part 1, comes to an end.

The quantity purchased for tranche A, part 1, from 01/01/2018, includes 16 sites and an amount of electricity of about 29.9 GWh / year contract from 01/01/2018 to 31/12/2020 at the later.

SBB buy about 300 GWh of electricity per year from 50 Hz to Switzerland to supply approximately 2500 objects. They launched a tender procedure to find suppliers able to guarantee energy supply for a number of sites.

End 2017, the contract to supply current energy SBB for tranche A, Part 1, comes to an end.

The quantity purchased for tranche A, part 1, from 01/01/2018, includes 16 sites and an amount of electricity of about 29.9 GWh / year contract from 01/01/2018 to 31/12/2020 at the later.

Construction work

SBB Immobilien Development Bahnproduktion | Published December 14, 2016  -  Deadline February 3, 2017

New conservation and Intervention Center (EIC) in the focus of development of the municipality of Ostermundigen,

New office building in energy standard,

1. + 2.Untergeschoss: Various stores, archives, equipment rooms and dressing rooms and equipment rooms,

Ground floor: workshops, storage and reception,

1 +. 2 Upper floor: office and meeting rooms, cafeteria,

3rd floor: barracks (residential) as well as ventilation station,

Construction: Walls and ceilings in reinforced concrete,

Compact perforated facade with 240 mm insulation and clinker facing. The flat roofs are extensively planted,

New outbuildings unheated,

Ground floor: goods receipt and garages,

Construction: steel construction, facade with metal panels and expanded metal, trapezoidal roof, hoist and crane to storage areas in 2.Untergeschoss,

Surroundings: Open storage and handling areas between remuneration and outbuildings, outdoor parking.

New conservation and Intervention Center (EIC) in the focus of development of the municipality of Ostermundigen,

New office building in energy standard,

1. + 2.Untergeschoss: Various stores, archives, equipment rooms and dressing rooms and equipment rooms,

Ground floor: workshops, storage and reception,

1 +. 2 Upper floor: office and meeting rooms, cafeteria,

3rd floor: barracks (residential) as well as ventilation station,

Construction: Walls and ceilings in reinforced concrete,

Compact perforated facade with 240 mm insulation and clinker facing. The flat roofs are extensively planted,

New outbuildings unheated,

Ground floor: goods receipt and garages,

Construction: steel construction, facade with metal panels and expanded metal, trapezoidal roof, hoist and crane to storage areas in 2.Untergeschoss,

Surroundings: Open storage and handling areas between remuneration and outbuildings, outside parking.

  • 1