Public tenders for boiler in Sweden

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Wood fuels

AB Gotlandshem | Published December 9, 2016
Winner
Gotlands Värmepellets AB
cpvs
09111400, 09110000

The acquisition concerns the bulk delivery of wood pellets for boiler houses in Roma, Tingstäde, Lärbro and off the island.

District heating boiler

AB Fortum Värme samägt med Stockholms stad | Published March 28, 2017
Winner
Förvaltningsrätten i Stockholm och migrationsdomstol
cpvs
42515000

The Farsta district heating plant was built in the late fifties and is today serving as a peak load plant. Fortum plans to replace the existing boilers in the plant with one new oil fired boiler, HOB. The new boiler will be fired with light fuel oil no.1 (EO1). It shall also be designed for the possibility of firing Bio oil RME in the future. The boiler shall be directly connected to the district heating system. An economizer is not foreseen. Circulation through the boiler for the purpose of minimum flow and inlet water temperature shall be made with a separate circulation pump. The boiler is expected to be directly fired, without a flue gas fan. Combustion air shall be a mixture of indoor and outdoor air. No flue gas filter is foreseen initially.

The thermal rating is 95 MW fuel input. District heating temperature to the plant around 60°C and from the plant 115°C. Design data for mechanical design is Water side: 16 Bar(g)/120°C. The mechanical design needs to be selected such that the equipment is fitted in the available space in the existing building.

The dimensions of the available space are: With: 9,6 meters, Height: 14,6 meters, Length: 15,7 meters.

The boiler and flue gas fans shall be located within the available space.

The boiler will be installed during the first half of 2018.

New boiler building on Sösia in Åre (ÅreF16 / 25/416)

Jämtkraft Aktiebolag | Published October 7, 2016
cpvs
45000000, 45213000, 45213250, 45250000

New boiler building on Sösia in Åre municipality that will later be complemented with a procesdel in another procurement

New heat production Sösia in Åre (ÅreF16 / 22/416)

Jämtkraft Aktiebolag | Published October 4, 2016
cpvs
09323000, 42515000

Jämtkraft AB, will replace the existing boiler in the boiler room Sösia

District heating boiler

Kommunalförbundet Inköp Gävleborg | Published August 19, 2016
cpvs

District heating boiler

Installation services of waste incinerators

AB Fortum Värme samägt med Stockholms stad | Published November 8, 2016
Winner
Förvaltningsrätten i Stockholm och migrationsdomstol
cpvs
51135110

Heat and electricity is mainly produced by combustion of domestic and industrial waste in five steam boilers of 270 MWth together.

Boiler P6 (91,2 MWth, 31,8 kg/s, 59 bar(g), 480 °C), a fluidised bed boiler (CFB) for industrial waste was put into operation in 1999. The economiser will be changed during revision in summer 2017 including new casing and sooting system. Dismanteling of old economiser, design, manufacturing and erection of new economiser together with new casing and sooting system. The company should have documented good economy and the two latest annual reports should be submitted. Registration certificate and a certificate from tax authorities showing that all tax obligations are fulfilled should also be submitted. The technical capacity with competence to build similar economiser with sooting system. Function delivery of economiser should be proven and described with valid references not older than 5 years should be included.

District heating boiler

Bionär Närvärme AB | Published October 29, 2016
cpvs
42515000

Pellet Boilers Skärplinge and Tierps village.

Refuse transport services

AB Fortum Värme samägt med Stockholms stad | Published December 24, 2016
Winner
Förvaltningsrätten i Stockholm och migrationsdomstol
cpvs
90512000

The assignment includes transport in covered and leak proof vehicles, bulk vehicles and transportation of AB Fortum Värme co-owned with Stockholm's own askcontainers. The following ashes to be loaded and transported: slag from waste incineration plant, Högdalenverket about 95 000 tonnes / year (covered transport). Bed ash from the boiler 6, Högdalenverket about 18 000 tonnes / year (covered transport). Aircraft and bed ash from Värtaverket about 40 000 tonnes / year (bulk transport). Slag and fly ash from Hässelbyverket 2-3 000 tonnes / year (covered transport) and a small number askcontainers from various production sites in the Stockholm area, extent about 100 tons / year. All the ashes are classified as non-hazardous waste. The ashes currently shipped to reception centers in the county. Bidders must pre-contractual hold a license for the transport of non-hazardous waste. The mission is divided into two items where bulk transport is a mail and flatbed transport and containers are another item.

AB Fortum Värme city has signed new transport contracts of the ashes of a series of production facilities in the Greater Stockholm area. Deluppdraget include the transport of bulk vehicles.

The following ashes to be loaded and transported in this sub-item: Aerial and bed ash from Värtaverket about 40 000 tonnes / year (bulk transport). The ashes are classified as non-hazardous waste. The ashes currently shipped to collection centers in the county.

Natural sand

Vattenfall AB Procurement Heat | Published August 13, 2016
cpvs

Boiler Sand

District heating boiler

Kommunalförbundet Inköp Gävleborg | Published August 12, 2016
cpvs
42515000

District heating boiler.

610 b External Fuel Handling Building (16/18)

Borås Energi och Miljö AB | Published June 29, 2016
cpvs
45210000, 45236000, 45251200, 45262370, 45300000, 45310000, 45313100, 45330000, 45331000

Within Sobacken, a new detached building erected containing a woodchip-fired boiler, turbine, switchgear and associated equipment. Earthworks for the foundation and connection to surrounding land is included. Another contractor has carried out preparatory ground work, leaving a terrace consisting of rock masses.

Installation of the geothermal heat pump, Oskarström 2:29, bog 4 (HFAB 2016/0221)

Halmstads Fastighetsaktiebolag | Published June 17, 2016
cpvs
45331100, 45315000, 45315100, 45330000

HFAB intention to the captioned property to install a geothermal heating system and replace the gas boiler. RTU, with today's gas boiler, serving 36 apartments and 1 local. The apartments are located in five buildings on two levels, each with a basement. The fifth body of the building contains the kitchen, dining room, hall and offices.

NG-brow á 3 MW, Falkenberg Energi AB (16/24)

Falkenberg Energi Aktiebolag | Published April 26, 2016
cpvs
44600000, 44621200, 45300000, 45311200, 45315100, 51000000, 51900000

The contract relates to a turnkey contract, which includes a complete NG boiler incl. associated connections to the existing system, and monitoring and control systems. The delivery thus consists of an electromechanical delivery, which also includes peripherals such as ducts, pipes, insulation, lighting, electrical power and instrumentation, etc. are included.

610 A building for CHP (16/12)

Borås Energi och Miljö AB | Published April 12, 2016
cpvs
45251000, 45210000, 45223210, 45223800, 45236000, 45262210, 45262300, 45262400, 45310000, 45313100, 45331000

Within Sobacken, a new detached building erected for the CHP. Woodchip-fired boiler, turbine, switchgear and related equipment are not included in this contract.

Rosterbyte boiler P4 Ostersund (Jämt16 / 193/171)

Jämtkraft Aktiebolag | Published March 30, 2016
cpvs
42161000

Replacing the roster in the boiler P4 in Ostersund Memory Gärdet

Fuel Pellets 2016 (16/11)

Tomelilla kommun | Published May 26, 2016
cpvs
09111400, 09110000

Purchase of fuel pellets from wood Tomelilla Municipality and Osterlen Hem boiler during the heating season 2016-2017.

Construction Boiler Save Lund Education Line C (2016.XX-610)

Alingsås Energi Nät Aktiebolag | Published June 3, 2016
cpvs
45251200, 45210000, 45262300, 45262400, 45310000, 45330000, 45331000, 45400000

Alingsås Energy Networks AB is planning a new boiler line on Save Lund Agency (line C) to strengthen the production of district heat. In the current situation there are two solid fuel boilers with moving grate of 7 MW and 14 MW, a biooljepanna of 12 MW and a smaller deponigaspanna.

Non-hazardous refuse and waste treatment and disposal services

AB Fortum Värme samägt med Stockholms stad | Published June 14, 2016
cpvs
90513000, 90510000, 90514000

Receipt and processing of slag from the boiler P1-P4 Högdalen.

Elångpanna to Probation, Institution Hall (2016-000542)

Kriminalvården | Published January 12, 2016
cpvs
42100000, 42162000

Institution Hall laundry need of an electric boiler. Entrerenaden includes the delivery and installation of a elångpanna.

Installation of new gas boilers.

Burlövs Bostäder AB | Published March 4, 2016
cpvs
45331100, 44621200, 45315000, 45331000, 45333000

Installation of new gas boilers.