Public tenders for boiler in Solna Sweden

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

HVC Lot 3 General civil works and buildings.

Vattenfall AB Procurement Heat | Published February 24, 2016  -  Deadline March 29, 2016
cpvs
45100000, 45200000, 45250000, 45251142, 65000000, 65400000

HVC boiler conversion from peat to wood pellets, Uppsala Sweden referred to as HVC Boiler conversion.

The scope of Lot 3 is removal of old domestic waste depot under the construction site and delivery of civil works for Lot 1 and Lot 2 including receiving station, storage silo, milling building and foundations for conveyors. Included in the scope is HVAC for the buildings, general electrical installations, general piping installation and fire protection.

HVC Lot 2 Milling and combustion of wood pellets.

Vattenfall AB Procurement Heat | Published February 24, 2016  -  Deadline March 29, 2016
cpvs
42310000, 45250000, 45251142, 65000000, 65400000

HVC boiler conversion from peat to wood pellets, Uppsala Sweden referred to as HVC Boiler conversion.

HVC Lot 2 — Milling and combustion of wood pellets.

The scope of lot 2 is delivery of a milling system and replacement of existing burners for the existing heat only boiler with a capacity of 120 MW. The scope includes process design with function guarantees and delivery, installation and commissioning of process equipment. Included in the scope are fire and explosion protection and solutions for preventing spread of dust as well as delivery and installation of necessary electrical/instrumentation installation for Lot 2.

Civil works will be procured separately in lot 3 which will also include HSE coordination and integration activities related to the works.

HVC Lot 1 Fuel handling system for wood pellets.

Vattenfall AB Procurement Heat | Published February 24, 2016  -  Deadline March 29, 2016
cpvs
45250000, 42417200, 45251142, 65000000, 65400000

HVC boiler conversion from peat to wood pellets, Uppsala Sweden referred to as HVC Boiler conversion.

The scope of HVC Lot 1 is the delivery of a fuel handling system for wood pellets with a capacity of approximately 60 ton/h and a storage capacity of approx. 4 000 m3. The scope includes process design with function guarantees and delivery, installation and commissioning of process equipment. Included in the scope are fire and explosion protection and solutions for preventing spread of dust as well as delivery and installation of necessary electrical/instrumentation installation for Lot 1.

Related Civil works and general electrical installations will be procured separately in HVC Lot 3 which will also include all coordination and integration activities related to the works.

P4 Electrostatic filter Dust extraction (NE2015-166)

Norrenergi Aktiebolag | Published June 4, 2015  -  Deadline June 24, 2015
cpvs
45250000, 45251000, 45251140, 45251200

The delivery includes delivery, installation and commissioning avprocessutrustningssystem for the necessary separation of dust in the electrostatic precipitators associated boiler fourth

HVP 3 Filter Purification Sundbyberg (NE2015-268)

Norrenergi Aktiebolag | Published October 6, 2015  -  Deadline October 27, 2015
cpvs
45250000, 45251000, 45251140, 45251200

North Energy is designed to supplement boiler 3 in Sundbyberg with dust abatement. The delivery includes design, manufacturing, delivery, installation and commissioning of complete process equipment systems for the required separation of dust under emission requirements.

Upgrading of the DOS stage 4 (NE2015-40)

Norrenergi Aktiebolag | Published February 18, 2015  -  Deadline March 12, 2015
cpvs
42961000, 42961200

Delivery, installation, programming, commissioning and fully ready for commercial operation idrifttaga exchange operator systems for boiler 1, 2 and 3 as well as district cooling in Sundbyberg Agency.

Replacement collection box for Burners 2 (NE2015-243)

Norrenergi Aktiebolag | Published September 4, 2015  -  Deadline September 28, 2015
cpvs
45259300

North Energy, intends to make an exchange of lower collection box in hot water boiler 2 (HVP 2) because of cracks in lådkors between the distribution box at the bottom and left side wall box that was discovered during an inspection by Inspecta.