Public tenders for boiler in Eskilstuna Sweden

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

P4 mill boiler plant extension (1312/2014)

Fortifikationsverket | Published May 13, 2015  -  Deadline June 23, 2015
cpvs
45111300, 09323000, 44160000, 44163000, 45232141, 45262300, 45330000, 45351000, 51100000

The contract includes engineering, disassembly of existing oil-fired boiler (OP1) in the boiler house building K0052.030, casting the new concrete slab, installation of new biooljepanna and new pellet boiler with accessories such as fuel silo and askcontainer on land near the boiler house building K0052.030 and mounting biooljetank and storage tank on land near the boiler house building K0052.030 and connection of new boilers to the existing heating culvert systems.

Mobile Fastbränsleeldad boiler house (UH 15-36)

Eskilstuna Strängnäs Energi och Miljö Aktiebolag | Published October 1, 2015  -  Deadline October 29, 2015
cpvs
42160000, 45251200, 45310000, 45330000, 45331000, 50721000, 51900000

The overall contract covers the complete supply and construction of a unit that replaces the existing heating system consisting of the heat pump and oil boiler.

Boiler plant extension P4 Mill (1312/2014)

Fortifikationsverket | Published February 19, 2016  -  Deadline March 23, 2016
cpvs
45232141, 42160000, 45251200, 45251250, 45330000, 45331000, 50721000

Subject of the contract is the technology for heat to Fortifications culvert system for heating in the area Mill, which includes boilers, fuel pellet silos, bunkers, etc. At present there are two existing boilers in boiler houses; in building and K0052.030 K0052.004. Heat is currently the most boilers that burn pellets and heating oil.

Refurbishment and life extension of the CFB boiler (UH 15-27)

Eskilstuna Strängnäs Energi och Miljö Aktiebolag | Published June 15, 2015
cpvs
45251000, 42515000, 45259300, 45259900, 45453000

The contract includes rebuilding the existing CFB boiler for district heating and includes replacement of substandard parts of the process and the improvement of the operating characteristics of the installation of new technology into existing hot water boiler of 57 MW fjärrvärme.Reinvesteringen of CFB shall secure the annual heat production for approximately 4 500 hours. 3500 full load hours during the operating season and about 1000 dellasttimmar during the summer months is planned.

Refurbishment and life extension of CFB boiler (UH 15-24)

Eskilstuna Strängnäs Energi och Miljö Aktiebolag | Published April 14, 2015
cpvs
45251000, 42515000, 45259300, 45259900, 45453000

The contract includes the refurbishment of existing CFB boiler for district heating and includes replacement of substandard parts of the process and improving operational characteristics with the installation of new technology into existing hot water boiler of 57 MW fjärrvärme.Reinvesteringen of CFB shall secure the annual heat output for about 4500 hours. 3500 full load hours during the operating season and about 1000 dellasttimmar during the summer months is planned.

KVV2 Lot: PAN

Eskilstuna Strängnäs Energi och Miljö Aktiebolag | Published December 27, 2014  -  Deadline January 28, 2015
cpvs
42162000

Procurement notification regarding biomass-fired Steam Boiler with auxiliary systems for a Combined Heat- and Power plant to be erected in Eskilstuna, Sweden.

Mobile boiler ELP

Eskilstuna Strängnäs Energi och Miljö Aktiebolag | Published April 25, 2017  -  Deadline May 16, 2017
cpvs

Steam-generating boilers

Eskilstuna Strängnäs Energi och Miljö Aktiebolag | Published February 24, 2015
cpvs
42162000

Steam-generating boilers

Construction works for power plants and heating plants

Eskilstuna Strängnäs Energi och Miljö Aktiebolag | Published June 18, 2015  -  Deadline July 15, 2015
cpvs
45251000, 42515000, 45259300, 45259900, 45453000

The contract includes rebuilding the existing CFB boiler for district heating and includes replacement of substandard parts of the process and the improvement of the operating characteristics of the installation of new technology into existing hot water boiler of 57 MW of district heat. Reinvestment None of CFB shall secure the annual heat output for about 4500 hours. 3500 full load hours during the operating season and about 1000 dellasttimmar during the summer months is planned.

Construction works for power plants and heating plants

Eskilstuna Strängnäs Energi och Miljö Aktiebolag | Published April 16, 2015  -  Deadline May 14, 2015
cpvs
45251000, 42515000, 45259300, 45259900, 45453000

The contract includes the refurbishment of existing CFB boiler for district heating and includes replacement of substandard parts of the process and improving operational characteristics with the installation of new technology into existing hot water boiler of 57 MW of district heating. Reinvestment None of the CFB will secure the annual heat output for about 4500 hours. 3500 full load hours during the operating season and about 1000 dellasttimmar during the summer months is planned.

Demolition factory building Kv Ensign (15/43)

Eskilstuna Kommunfastigheter Aktiebolag | Published May 19, 2015  -  Deadline June 8, 2015
cpvs
45110000, 45111100

The item relates to the demolition of buildings on the property: - Oct. 13 verkstadsbyggnad- Oct. 13 former boiler-room building with a chimney situated within Munktellstaden, Eskilstuna.Rivningen include dismantling, if necessary. landfill and removal of demolition materials

Life extension External fuel CHP (UH 16-23)

Eskilstuna Strängnäs Energi och Miljö Aktiebolag | Published September 28, 2016  -  Deadline November 3, 2016
cpvs
45259300, 45315100, 50000000

The plant to be upgraded and modernized built in 1986 for fuel handling and transportation to a biofuel-fired CFB boiler of 57 MW. The plant has been rebuilt and adjusted a number of times during the 30 years it has been in operation to fit the biofuel is burned in existing boilers for hot water and steam.
  • 1