Public tenders for boiler in Norway

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

District heating boiler

Returkraft AS | Published May 19, 2015
cpvs
42515000, 42160000, 42162000, 44621221, 45331110, 50531100

District heating boiler

Maintenance stoppage – boiler revision project 2013.

Returkraft AS | Published September 7, 2013
Winner
Fbe After Sales ServiceFabrikstr. 1Gummersbach 51643
cpvs
42162000, 42320000

Returkraft AS yearly revision will take place in week 37 and 38, (production will be stopped September 8th and is scheduled to start up again September 22th). The boiler will first be cleaned inside by means of bang cleaning and sandblasting by another company. It is hereby announced a contest in conjunction with the revision. The tasks are specified in points 1-5 below: 1. Boiler, reporting of overall status and recommendation for further work 2014 (including steam and water system connected to boiler), 2. Grate revision including feeder, a. Cleaning on and under grate, b. Changing broken grate elements, c. Change leaking/worn water hoses, d. Check/repair all the total grate table, e. Waste shaft inspection/repair, 3. Slag pusher including wear plates, 4. Wet scraper under grate, inspection repair, 5. Oil burners revision. The work has to be planned in detail together with Returkraft revision management in order to have the correct timing and needed spare parts for the work. The supplier needs to adhere to the Returkraft requirements regarding safety instructions. The job is not completed until Returkraft has approved the assignment. Boiler Information: The boiler is a FBE boiler that was started up in 2010. The boiler capacity is a 16,9 kg/s of steam at 50 bar and 425 °C. It consists of grate firing system. The evaporation part of the boiler is consisting of three vertical passes for flue gas. All of this is water filled panels with boiling water at 50 bar, self circulating flow of water and steam. There is a horizontal part with hanging tube packages. The first of these packages in the horizontal pass is evaporation, while the rest of the packages take in saturated steam and make superheated steam. There are attemperators that spray water into the superheated steam in order to keep constantly 425 °C on the steam that goes to the turbine. In the end of the forth pass of the boiler there are an economizer. The total overall dimension of the boiler is: Heigth 26 m, length 45 m, width 7m (4 m in forth pass).

Metal Spray coating of boiler walls

Sted: hele Norge | Published June 12, 2017  -  Deadline July 10, 2017
cpvs
45252300

Metal spray coating of boiler walls

Metal Spray coating of boiler walls

Sted: hele Norge | Published September 1, 2017
cpvs
45252300

Metal spray coating of boiler walls

Maintenance stoppage – boiler revision project 2013.

Returkraft AS | Published April 24, 2013  -  Deadline June 3, 2013
cpvs
42162000, 42320000

Returkraft AS yearly revision will take place in week 37 and 38, (production will be stopped September 8th and is scheduled to start up again September 22th). The boiler will first be cleaned inside by means of bang cleaning and sandblasting by other company. In connection with the annual revision, a competition will be arranged for the task of boiler work specified in item 1-6 and execution of assignments as stated in this document. The work has to be planned in detail together with Returkraft revision management in order to have the correct timing and needed spare parts for the work. The supplier needs to adhere to the Returkraft requirements regarding safety instructions. The job is not completed until Returkraft has approved the assignment. Boiler Information: The boiler is a FBE boiler that was started up in 2010. The boiler capacity is a 16,9 kg/s of steam at 50 bar and 425 °C. It consists of grate firing system. The evaporation part of the boiler is consisting of three vertical passes for flue gas. All of this is water filled panels with boiling water at 50 bar, self circulating flow of water and steam. There is a horizontal part with hanging tube packages. The first of these packages in the horizontal pass is evaporation, while the rest of the packages take in saturated steam and make superheated steam. There are attemperators that spray water into the superheated steam in order to keep constantly 425 °C on the steam that goes to the turbine. In the end of the forth pass of the boiler there are an economizer. The total overall dimension of the boiler is: Heigth 26 m, length 45 m, width 7m (4 m in forth pass). 1. Boiler, reporting of overall status and recommendation for further work 2014 (including steam and water system connected to boiler), 2. Grate revision including feeder, a. Cleaning on and under grate, b. Changing broken grate elements, c. Change leaking/worn water hoses, d. Check/repair all the total grate table, e. Waste shaft inspection/repair, 3. Slag pusher including wear plates, 4. Wet scraper under grate, inspection repair, 5. Oil burners revision. Note: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.english.doffin.no/Search/Search_Switch.aspx?ID=292065

Steam boiler

Norges miljø- og biovitenskapelige universitet | Published March 26, 2015  -  Deadline April 14, 2015
cpvs
42162000

Steam boiler for dairy building

Gas boiler Harestad school

Randaberg kommune | Published December 13, 2013  -  Deadline January 8, 2014
cpvs
45330000, 45331000, 45333000, 71321200

Randfontein municipality to replace existing oil boiler at Harestad School with new gas boiler, and would offer delivery and installation of this and the associated works. Site inspection FRIDAY 20/12, AT 10:00. The works mainly comprise: - Detailed engineering. - Gas boiler, size min 450 kW - Miscellaneous work: Disconnect oil boiler, boiler room ventilation, alarm systems, fire sealing etc. - Option of serivceavtale. - Option of operating. CPV: 45330000, 45331000, 45333000, 71321200.

Open tender competition for a framework agreement for bio oil for 28 bio boiler plants.

Omsorgsbygg Oslo KF | Published September 17, 2013  -  Deadline October 31, 2013
cpvs
30124110

Oslo municipality c/o Omsorgsbygg Oslo KF, hereafter called the awarding authority, invite companies to an open tender competition for a framework agreement for bio oil for 28 bio boiler plants. Omsorgsbygg Oslo KF is a municipal company owned by Oslo municipality that shall develop, construct, run and maintain municipal buildings. The buildings mainly consist of nursing homes, residential and rehabilitation centres, nurseries, fire stations and arts buildings. Our tenants consist of district administrators and municipal departments. Omsorgsbygg Oslo KF place high demands on itself to carry out environmentally friendly choices within supplies, services and construction work. Omsorgsbygg Oslo KF would like tenders for a framework agreement for bio oil. The framework agreement shall ensure delivery of bio oi to 28 bio boiler plants as needed. The estimated call-offs on the framework agreement can have a value up to 6 500 000 NOK in the framework agreement's contract period. The awarding authority emphasises that the figures are based on an estimate according to experience and the actual volume can vary. The locations can change. The estimate is not binding for the awarding authority. NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=305150

Welding and replacement of boiler walls

Sted: hele Norge | Published June 12, 2017  -  Deadline July 10, 2017
cpvs
45252300

Welding and replacement of boiler walls

Welding and replacement of boiler walls

Sted: hele Norge | Published August 31, 2017
Winner
Sted: hele Norge
cpvs
45252300

Welding and replacement of boiler walls

Converting oil boiler to bio-oil

Rømskog Kommune | Published May 2, 2016  -  Deadline May 20, 2016
cpvs
44621220, 42160000, 42161000, 44620000, 44621000, 44621200, 44621221

Existing oil boiler to be converted into bio-oil and adapted for connection to the BMS.

Element boiler and related equipment and work

Vestre Viken HF | Published September 26, 2013  -  Deadline November 1, 2013
cpvs
42162000, 42164000, 45331110

Steam consumption at Drammen hospital is related to the operation of the hospital autoclaves. The heating plant has two steam producing boilers, one electrode and a smaller lettoljefyrtkjel. The internal steam consumption has decreased after the hospital connected to the district heating network and the existing electrode boiler is thus of great capacity to supply autoclaves. This has meant that the hospital must use oil pan as primærkjel, and thus has no back-up boilers for steam production. The hospital will now replace the existing electrode with a smaller element boiler suit hospital's steam consumption. Light oil-fired boiler to serve as the auxiliary of the new element boiler. There will also be a need for new feed water tank with associated feed water pumps, new water treatment facilities, and the upgrading of existing condensate system for condensate return from the hospital. The new element boiler be integrated into current systems, in such a way that the system can be installed and started up while the steam production is underway in existing plants. A short downtime needed for connection to the existing steam / condensate network will take place. The tender provides a technical description of competition for the supply of 1 piece element boiler, feed water tank with associated feed water pumps, water treatment facilities, and the upgrading of existing condensate system. CPV: 42162000, 42164000, 45331110.

Transformer for element boiler, Drammen hospital

Vestre Viken HF | Published October 25, 2013  -  Deadline November 20, 2013
cpvs
31170000, 31213200, 65300000

It is to be acquired new 1600kWA transformer to supply the element boiler and other consumers in the boiler room via the new substation. ATTENTION! It is important to note that it is desirable (but no absolute requirement) that the delivery will be completed delivered / installed by 01/03/2014. CPV: 31170000, 31213200, 65300000.

Replacing the boiler tubes of superheater

Returkraft AS | Published March 3, 2017
cpvs

In connection with the Return Kraft's annual audit in 2017, organized the competition to replace all boiler tubes of superheater 3.0 (396 tubes) and a row of units 2.2 (32 tubes)

Replacing the boiler tubes of superheater

Returkraft AS | Published March 2, 2017  -  Deadline April 4, 2017
cpvs
42162000

In connection with the Return Kraft's annual audit in 2017, organized the competition to replace all boiler tubes of superheater 3.0 (396 tubes) and a row of units 2.2 (32 tubes)

Nordland Hospital, Bodø. Renovation Kjelsentral. K 932 - Oil boiler

Nordlandssykehuset HF - Senter for utbygging | Published February 12, 2014  -  Deadline March 10, 2014
cpvs
45232141, 45331100, 39715000

In connection with the transition to a district heating system at Nordland Hospital, Bodø, the existing kjelsentral renovated and rebuilt. K 932 - Oil boiler includes delivery and installation of new oil boiler of about 7.5 to 8 mWatt with flue for backup supply. The project is not part of the ongoing development project.

Stavanger gymnastics hall upgrade of air handling and boiler plants

Norconsult AS | Published December 20, 2016  -  Deadline January 27, 2017
cpvs
45331210, 45212200, 45331110, 71321000

Air treatment plants and boiler plant Turnhallen are mostly from the building was new. The plants have a large degree of recirculated air and is in a condition that makes it necessary to upgrade.

The project deals with the dismantling and removal of existing ventilation systems and boiler plant in Stavanger Gymnastics Hall and the establishment of new ventilation units and a new boiler plant.

Today's ventilation units in the building mainly consists of 2 pcs main aggregates omluftfunksjon and 3 pieces dela leg which takes air from the main unit. These systems must be removed. Today's ventilation ducts should essentially be retained and cleaned.

Kristiansund Hall - Renovation of boiler

Kristiansund kommune | Published June 28, 2013  -  Deadline August 20, 2013
cpvs
45259300, 44621220, 50720000, 45262660

PROJECT ART AND SCOPE existing technical installations in the boiler room will mainly be replaced. (Built about 1950). Room asbestos decontaminated, walls, ceilings and floors cleansed and surface treated. New equipment installed and commissioned. Rørtekniske work, asbestos removal and structural hjelpeabeider included in this contract. Some minor work on the building is otherwise included in the tender substrate. Offeror shall demonstrate to the client will be responsible for all necessary works for a finished commissioned plant. Plumbing contractor shall have qualifications that meet the requirements of enterprise class 3 for carrying out plumbing work. Tenderer shall also be responsible for seeking the measure. Project and Construction FORM tenderer's contractor and accordingly contractual partner for all work described. CPV: 45259300, 44621220, 50720000, 45262660.

74241US I Microbiological Dept. Printer, agar boiler and petri dish filler.

Oslo universitetssykehus HF | Published November 29, 2014
Winner
VWR International AS860964732Havard Martinsensvei 30Oslo 0978 +47 02290
cpvs
33100000

The Inspection and Production Section of The Department for Microbiology, Oslo University Hospital, produces medium and reagents. They must comply with the general requirements in connection with labelling given in Directive 98/79/EF regarding medical equipment, implemented in the Regulation for medical equipment 15.12.2005, no 1690, and are produced in accordance with standards, regulations and instructions which apply for production of microbiological medium for cultivation and identification. It is a requirement for procurement of equipment for production of agar and filling of petri dishes. The Department is certified and accredited which means that the petri dishes must be labelled and consequently a printer is required. Approx. 1 000 000 petri dishes are annually produced by the Section. The Section has 4 production lines. However, all of these are very old and this procurement shall ensure that the operation and production are improved.

74241US I Microbiological Dept. Printer, agar boiler and petri dishes filler (complete system).

Oslo universitetssykehus HF | Published July 29, 2014  -  Deadline September 1, 2014
cpvs
33100000

The Inspection and Production Section at Department for Microbiology, Oslo University Hospital, produces medium and reagents. They must comply with the general requirements in connection with labelling given in Directive 98/79/EF regarding medical equipment, implemented in the Regulation for medical equipment 15. December 2005, no. 1690, and are produced in accordance with standards, regulations and instructions which apply for production of microbiological medium for cultivation and identification. It is a requirement for procurement of equipment for production of agar and filling of Petri dishes. The Department is certified and accredited which means that the Petri dishes must be labelled and consequently a printer is required. Approx. 1 000 000 Petri dishes are annually produced by the Section. The Section has 4 production lines. However, all of these are very old and this procurement shall ensure that the operation and production are improved.