Public tenders for boiler in Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Szerz.Mód.1. - Kastélykiváltás Berzence "subject, SIOP 3.4.1. In connection with the 11 / 1-2012-0004 identification number project "Open Heart" Social Service Centre within the framework of implementation of the project management contract

Szociális és Gyermekvédelmi Főigazgatóság | Published January 15, 2016
Winner
ZÁÉV Építőipari Zrt.
cpvs
45000000, 45260000, 45332200, 45400000, 45261410, 45262500, 42416000, 45112700, 45100000, 45261400, 45223300

In connection with the 11 / 1-2012-0004 identification number project "Open Heart" as part of construction of Social Service Center construction contract "Volume: In connection with the 11 / 1-2012-0004 identification number project" Open Heart "Social Service Centre within the framework of implementation of the project management contract building is designed as a greenfield investment. The construction works include demolition of existing buildings on the property is located, the planned construction of building, electrical, mechanical, complete the development, to be built in the courtyard of the parking lots and sidewalks leading to the building, the necessary landscaping execution of works. The construction of the demolition of existing buildings, the landscaping design begins with the construction of the road network connecting the task. In terms of floor plan the development of a building will be constructed • Food plant: The kitchen is serving the number of planned new services (elderly dementia day care) Task The kitchen operating room needs than you need to meet the nutrition required by law technological standards and HACCP Implementation responsibilities include the kitchen technology installation of equipment list. • Laundry: The laundry on the property in a separate unit, we plan to develop, which is linked to the technical, maintenance, logistics unit, but here, too, special attention should be paid to professional legal standards, contaminated clothing and textiles connectivity to the technical unit can be solved in two department employees a common dressing room, bathroom and toilet block design. • Technical, Logistics, Maintenance Unit: This section would place the various workshops, stores, warehouses, boiler room • Professional Service Unit: This unit has the professional work is going on, here we provide a variety of professional services to clients. A related raw materials warehouse, executive office work, finished goods warehouse. o Creative art workshop: on average 30 to 40 people, working hand-picking, painting, object creation, in a separate room in the ceramic workshop, incinerator. o Communal room: a library, TV room, internet points for the 30-40 group and o Interview Room 2: Individual case management, group therapy encounters. • Administrative Unit: This section takes place in the administrative, professional management, administrative activities. The project for the planned building full accessibility is realized. This barrier-free park design, building approach (sidewalks, pedestrian paths), the main entrances to the interior of accessibility and barrier-free design of sanitary realized. The building is made using conventional technologies. The building's foundation síkalapozással made under the concrete load-bearing walls sávalapokkal. Below the floor 15 cm thick gravel bedding made from the floor with a thickness of 10 cm Ø5 150/150 mesh reinforcement are made. The proposed building skirting the walls of stone masonry formwork 25cm wide, 30cm thick load-bearing walls are made of masonry vázkerámia. The partition walls 10 cm thick. vázkerámia bulkhead panel. The 3-storey building will be constructed of reinforced concrete slabs as floor plate, the thickness of 20cm. The purlin plane of the roof slab supporting structure as nail boards based on this tree are hanging, single-layer, 15 mm thick fireproof plasterboard fixed cover plate, galvanized steel frame CD, the water in the village impregnated finish. The shaft walls 20 cm thick World Cup. a structure built. Building ground floor of places will be constructed flat roof, partially passable (terasznál 40x40 cm of washed gravel flagstones 3 cm thick), partly kavicsleterheléses design, the other surface by extensive green roof in the form of the building rainwater insulation of 1.2 mm thick root-resistant waterproof membrane - PVC sheet . The planned high roof support structure positioned as a 90cm nail boards located in grooved wood roofing plain tile roofing battens, ellenlécezéssel, foil against snow, the required additional elements red. Against the soil moisture: to weld thick bituminous sheet in a single layer with a minimum thickness of 4.0 mm elasztomerbitumenes (SBS modified) disk, due to surface all over the walls and flooring, skirting the walls to a height of at least 30cm folded relative to the connecting ground level. In wet areas, toilets, washrooms, two under the cover layer, at least 3.2 kg / m² thickness, kent, against two-component waterproofing application is required for use on walls. The pedestals 8.00 - 10.00 cm-thick masonry facade is EPS foam insulation facade. The doors and windows structures are white, 5-chamber plastic windows

"Pecs train station entrance building rehabilitation" No. 2 contract modification

MÁV Magyar Államvasutak Zrt. | Published November 6, 2015
Winner
PRÍM ÉPÍTŐ Építőipari Kft.
cpvs
45000000, 45453100

Within the framework of a contract "Pecs train station entrance building rehabilitation" of Pecs train station begining of the station building rehabilitation. The exact amount of each gender of work, budget items for proposals as part of the implementation plan included in the documentation, which is part of the procurement documentation. A short guide to major works of the design: General Description of the building: traditional, building structure, high roof cross - and hosszfőfalas part cellar and ground floor, first floor and part of public building second floor in the basement storage rooms on the ground floor with offices, passenger spaces, the first and second floor offices. Demolition work: Demolishable 348lm³. Demolishable: 2,383 m². Demolishable 1277 m². Demolishable: 3,860 m². Leverendő: 9688 m². Shell demolished 1866 m². Demolishable 1468 m². - Mechanical, electrical wires: a full building will be demolished. - Peronburkolat: peronburkolat and complete existing socket will be demolished. Demolishable covering 940 m2, demolished column: 7 pcs. - Primer: Based on the existing foundation adequate expertise, to strengthen not necessary lásd.Talajmechanika and stability Maternity opinion. - New main wall and partition Funds: monolithic reinforced. and footings and girders. prefabricated World Cup. 159 m³ beams. They are made of, proper strength, does not require confirmation. Twice 13 m long, 3.7 m high. - Load-bearing pillars: a static monolith according to plan World Cup. - Cellar Areas: In the cellars of the partition walls to be demolished, to the premises should be in accordance with the plan to open up the walls vakolatleverés after fugamélyítés made fluátos sóközömbösítés (see documentation for building insulation). - Horizontal wall insulation against soil moisture based on subsequent injection under pressure. Hidrofobizálni need to advance in this zone of brick or stone surface for szennyeződéselkerülésének (see Fig. Below). The ends of the holes are just above the sidewalk level. - Injection holes cleaning, compressed air, dust, metal-mounted placement of packers minimum20-22 Consumption liter / m², the dilution ratio of 1: 9th - After the removal of the pressure release reusable packers. - Upload special cavity filling holes with mortar (MC oxalate BS-V, Schomburg ASOCRET BM other manufacturer's products, or equivalent). The injection may have led to different heights according to the bands must be connected to the same method of horizontal injection method is vertically injected zones. The remaining block stairways insulation: - removal of crumbly renders. - Téglafugák plane smoothing cement mortar (un smírolás.). 20 cm and a thickness furathossz - 5 cm). - Hole diameter 18 mm. - Cleaning the holes with compressed air. - Installation of plastic disposable injection nozzles to knock the structure. - The masonry tömbinjektálása MC Injekt GL95 acrylic gel state of the masonry fitting pressure. - Protruding plastic injection nozzles to the ends of the removal, surface lejavítása - Minimum of 2.5 mm dry film thickness of cement-based coating insulation is applied in two layers (MCOXAL DS-HS) - Application Renovation plaster layers (previously detailed) - Finish silicate paint Volume: 332 dist. m². Quantity: 53 m². According Static construction plan. The cleaned surface with 4 cm thick plaster system is légpólusos (sólekötő Guz + base + top plaster mortar). Internal nyílásáthidalók prefabricated "A" respectively. "A" signal, respectively. I corsets screws connected steel beams, see Static export plan. Due to the high ceilings on the ground floor bar above the doors 10/25 cm reinforced concrete kiváltógerenda to be prepared, to be connected to the főfalakba. - Remaining ceiling with partitions moved 10 cm thick. mounted on plasterboard walls made from water village with waterproof design, the village around the boiler fire-resistant finish. - Passenger toilet partitions: WEDI - vandal-proof design tiled standing on legs - or equivalent types. The pipes sound is produced. 250 mm size, insulated, stainless spikócsőből are made for chimney heights are required. - Basement floors: the basement cleaned areas after demolition of the existing floor layer with a new batch of World Cup waterproofing basement walls bound. According plate made of static design, the building insulation and SIKA according to plan - and other manufacturers' products equivalent - swellable tape bar the installation of insulation. - Ground floor: The entire ground floor after floor coverings demolition of new floor insulation made from material: After this new host

DDOP-4.1.2 / B-13-2014-0004 identification number, "Housing integration amplifier settlement of Pecs mine site rehabilitation" project-related construction was -3.sz. author mode.

Pécs Megyei Jogú Város Önkormányzata | Published November 9, 2015
Winner
Szabadi és Társa Kft.
cpvs
45262690, 45232452, 45262100, 45262300, 45262500, 45410000, 45443000, 45310000, 45350000, 45330000, 45111100, 45442100, 45261400

DDOP-4.1.2 / B-13-2014-0004 identification number, "Housing integration amplifier settlement of Pecs mine site rehabilitation" was associated with the project implementation. The present investment in social housing refurbishment, demolition, renovation and storm sewer and road network, the renovation of a community center to be implemented in law and in DDOP for grants under the DDOP-4.1.2 / B-13-2014-0004 identification number "Housing integration amplifier urban rehabilitation Pécs Mining Plant" project in accordance with the grant agreement -4.1.2 / B-11 Identification number of projects be maintained. The contractor responsible for the construction plans and building permits are reserved, and implementation of technical content required under Customer requirements. Licensing and design documentation prepared by the second) were determined. Main quantities: Community Church of architecture accessibility: young children, thinking of changing folding changing table is possible with barrier-free toilets. Parts of the building are cserépfedésű roof covering is over. The facades are heat insulation, external doors and windows will be replaced. From tactile pavement will lead to new, barrier-free entrance with (standards compliant) ramp. Building Services: The heating system will be maintained, but new boiler will be installed. The project will be solved within the framework of the cooking gas appliances in the interior, air supply and extraction facilities. Building wiring: The distributor of a central circuit breaker was designed for the new space we are building new tram network with new luminaires, fixtures. External utilities: Based on registration number 4/66945 declaration of public utility and utility plans available in the plot. Hospital utca 1. Architecture: The building has two other apartment termination of the basement stairs and drainage at the site for a new bathroom and WC. The building has been completely renovated (roofing replacement, facade insulation, loft insulation of windows, replacement doors, replacement of flooring, painting). The flats in the backyard runoff stairs are made of steel. Building Services: Offices will be solved heated by an electric heater. Building wiring: The value of office lighting has been designed in accordance with the regulations. External utilities: Based on registration number 4/66945 declaration of public utility and utility plans available in the plot. Architecture Street Hospital 2: apartments in the building will be terminated stairs to the basement drain and place in a new bathroom and toilets will be constructed. The building has been completely renovated (roofing replacement, facade insulation, loft insulation of windows, replacement doors, replacement of flooring, painting). The flats in the backyard runoff stairs are made of steel. Building services: every flat 1pc 1pc stove and electric heaters in the room and 1 electric wall heater is installed in the bathroom. Building wiring: Brand new tram network will be built with new fixtures with fixtures. External utilities: Based on registration number 4/66945 declaration of public utility and utility plans available in the plot. Hospital Street Architecture 3 apartments in the building will be removed to the basement stairs and drainage at the site for a new bathroom and toilets will be constructed. The building has been completely renovated (roofing replacement, facade insulation, loft insulation of windows, replacement doors, replacement of flooring, painting). The flats in the backyard runoff stairs are made of steel. Building services: every flat 1pc 1pc stove and electric heaters in the room and 1 electric wall heater is installed in the bathroom. Building wiring: Brand new tram network will be built with new fixtures with fixtures. External utilities: Based on registration number 4/66945 declaration of public utility and utility plans available in the plot. Hospital utca 5. Architecture: The apartment is fully renovated (painting, replacement housing, etc). Building installation: The kitchen-dining room with solid fuel stove heater will provide. Building wiring: In a small distribution center will be built in circuit protection switch, all-new tram network is being built with new fixtures with fixtures. External utilities: Based on registration number 4/66945 declaration of public utility and utility plans available in the plot. 6th Street Hospital Architecture: lower part of the building next to the main building is completely demolished district

"We've got the space here - Home Creation subproject" Zákány 860 / B / 4th u. apartment interior renovation and modification of the contract information (2)

Zákány Község Önkormányzata | Published November 9, 2015
Winner
KOZÓ BAU Kft
cpvs
45000000, 45210000

Zákány for Local Government "Ours here in the Square - Creating a home sub-project" as part of the tender awarded at the 8852 Zákány purchased, May 1, 860 u / B / 4th. interior renovation works hrsz.-u flat, within the framework of a contract to ID number: 3.2.3 SIOP-13 / 1-2013-0001 purchased Zákány 8852, May 1, 860 u / B / 4th. ú hrsz.-room apartment Detection: Room 1 Hallway 5.75 m2 floor ceramic tiles Room 2 Room 3 15.00 20.35 laminate flooring laminate flooring ceramic flooring 5 8.32 4 Dining Kitchen Pantry 4 6 8.54 ceramic flooring, Spa 3.76 7 33 ceramic flooring ceramic flooring ceramic flooring 8 WC 1.56 Total: 67.61 1 BACKGROUND - DESCRIPTION OF SITE The ground floor + 1 storey condominium in her building, located in the apartment is fixed. Construction of the estimated 1960, sávalapozással gravel concrete, traditional masonry structures, concrete modular floor structure, wooden ácsszerkezetű high roof, undeveloped attic space. 2. The proposed renewal - DESCRIPTION OF RECONSTRUCTION During the project, the 860 / B / 4th hrsz. interior renovation of housing-u wish to raise the degree of comfort. Planned technical content - toilet, bath rooms refurbishment of ceramic tiles replacement, épületgépészeti-, electrical reconstruction - improving frontal doors and windows, joints, replacing as necessary valves, fittings, gaskets revision - internal doors replacement - Apartments building electric revision retrofitted according to the standards in force, Protection Protocol, replacing as necessary fittings - oldalfalak-, ceiling painting of the necessary parts operations, plaster repairs - the roof slab covered with insulation Foundations STRUCTURAL DESCRIPTION: During the load-bearing wall structures made of gravel concrete footings - unchanged. Load-bearing structures: the existing structural walls 38 cm thick. solid brick masonry units improved bilateral lime plaster, grout walled, with connections according to the technological requirements - the same training Facade: Kőporos scraped plaster facade, facade paint - unchanged. Roof trusses, roofing: roofing slate traditional standard constant-Partition: 10 cm thick. Building on the partition elements. Plumbing structure: Galvanized steel eaves, drain channel - ceiling unchanged: Battery concrete structures - concrete screed unchanged: The sockets are resolution, after the completion of the engineering alapszerelések new socket is made of concrete C16-16 / KK quality kavicsbetonnal. Coverage: The bathroom has a height of 2.10 m and 1.50 m in height toilets, kitchens while the 60 cm and cemented the band between the lower and upper kitchen elements made from tiles. Doors and windows: Exterior doors and windows remaining structures created to match. After the internal doors are unfolding, the new standard will be placed insulation sized, surface-treated wood doors: Rockwool Multi Rock mineral wool is placed insulation blanket and protective PE foil Inner finish: plastered walls and ceilings after the necessary preparatory sub-actions 2x-i fairing, 2x i white painting is made of plastic. Lighting: The existing outdated system in place falhoronyban, protective pipe and copper wire mounted power grid made new fittings (switches, sockets, lighting fixtures) positioning of the existing housing design the same way. Heating: Existing solid fuel system - constant hot water supply: Existing electric boiler prepared - constant water supply instead of the existing outdated installation, floors and falhornyokban new five-layer plastic tube mounted systems, new fittings placing Sanitation: Plastic KG-PVC pipe mounted system, the existing Garbage trails, taking into account storage and transport: the collection and removal of municipal waste generated in the locality familiar manner with receptacles, removing by service provider. ENVIRONMENTAL PROTECTION:

DDOP-4.1.2 / B-13-2014-0006 identification number "Housing integration amplifier town Pécs-Somogy mine site rehabilitation and shaft Rücker" was associated with the project implementation

Pécs Megyei Jogú Város Önkormányzata | Published November 9, 2015
Winner
Szabadi és Társa Kft.
cpvs
45262690, 45232452, 45262100, 45262300, 45262310, 45262500, 45410000, 45443000, 45310000, 45350000, 45330000, 45111100, 45442100, 45261400, 45212100, 45233200, 37535200, 37535210

DDOP-4.1.2 / B-13-2014-0006 identification number "Housing integration amplifier town Pécs-Somogy mine site rehabilitation and shaft Rücker" was associated with the project implementation. The present investment under the DDOP-4.1.2 / B-13-2014-0006 identification number "Housing integration amplifier urban rehabilitation Pécs-Somogy mine site and Rücker shaft" project social housing renovation and demolition, community center renovation, construction and storm sewer and road networks renovate playground and the legislation must be implemented DDOP-4.1.2 / B-11 Identification number of projects for grants in accordance with the grant agreement be maintained. The contractor responsible for the construction plans and building permits are reserved, and implementation of technical content required under Customer requirements. Licensing and design documentation prepared by the second) were determined. Main quantities: Community Church of architecture Accessibility: The entire building façade undergoes renovations. New roofing is made of the facade and the insulation will be warming the camp ceilings, doors and windows, the facade will be replaced. The total existing sanitary facilities and a new part of the building will be built instead demolished. The existing kitchen will be modernized heating. The building in those areas of new flooring is made and painting. Currently, the House of Culture can not be considered free of obstacles, persons with disabilities need help to use it with or not. Inside the building has one room was not accessible barrier-free, after the conversion, the following facilities are available: Miners Club. In young children, thinking changing opportunity folding changing table with a barrier-free toilets. All of these contribute to the modernization of equal opportunities. Building Services: washroom renovations, construction of radiator heating systems, new boiler and hot water tank, gas supply tidying the current regulations, kitchen with gas appliances air supply, interior, premises extraction. Building wiring: Each distributor is a central circuit breaker, the space for new power network we are building a new luminaires, fixtures. External utilities: rainwater brass wool before the plot will be driving in the street Somogy flat concrete drainage ditch. School of frequency points to prepare and modernize the lighting will take place in front of the computer room corridor area. Rücker- pit four residential buildings and associated outbuildings complete demolition and settlement of the area. Pécs- County mine works 34/4 apartments apartment Architecture: architectural works related to these works should be carried out (replacement doors, flooring, painting). Building services: Complete design of sanitary facilities, and the bathroom is placed in a new electric wall heater. Building wiring: The whole apartment to the existing power grid will be demolished, replaced by new network will be built. External utilities: Consumer built on the existing water supply to the facility as well as consumer vízmérőaknától the existing wastewater sewer aknától transfer to the facility. 04.21 flat design: The room is placed in a new window. Building services: Complete design of sanitary facilities, and the bathroom is placed in a new electric wall heater. Building wiring: The whole apartment to the existing power grid will be demolished, replaced by new network will be built. External utilities: Consumer built on the existing water supply to the facility as well as consumer vízmérőaknától the existing wastewater sewer aknától transfer to the facility. 48/3 flat design: these architectural works related to the work should be carried out (replacement doors, flooring, painting). Building services: Complete design of sanitary facilities, and the bathroom is placed in a new electric wall heater. Building wiring: The whole apartment to the existing power grid will be demolished, replaced by new network will be built. External utilities: Consumer built on the existing water supply to the facility as well as consumer vízmérőaknától the existing wastewater sewer aknától transfer to the facility. (48/3 and 48/4 of the home's water supply and sewage disposal is done with common surnames) home 48/4 Architecture: architectural works related to these works should be carried out (replacement doors, flooring, painting). Building services: Complete design of sanitary facilities, and the bathroom is placed in a new electric wall heater. Building wiring: The whole apartment to the existing power grid

TEE - Somogy County Social Care Together Love Each Other, Children and Social addresses of home building cold corridor redevelopment

Szociális és Gyermekvédelmi Főigazgatóság | Published December 14, 2015
Winner
CONSTRUTTIVO Építőipari és Szolgáltató Kft.
cpvs
45000000

Subject: "Somogy County Charity Social Care Co-Egymásért Social and Children's Home site of cold aisle building redevelopment" 1. THE WORKS VALUE CALCULATION: The proposed construction Designation: part of building social applications Total net floor area: 405.52 m 2 INSTALLATION AND WORKS DATA: The Plot, the building and the space occupied by the data contained in the Site Plan Built-up. PLANNED NEW COLD CORRIDOR: Lot number: 532 (Mihály utca 22. Táncsics house number) Baseline level: ± 0.00 m 105.90 m asl = = = Administration Building ground floor level 1 and 2 floor nursing unit level - 0.30 m = 105.60 m asl number 3 = Cold Corridor care unit floor level floor level: ± 0.00 m, and - 0.30 m Cold Corridor sidewalk level: -0.30 m, -0.60 m Cold Corridor (sloped according to plan) Connector ground level : -0.35 m, -0.65 m Cold Corridor (sloped according to plan) ridge heights: + 2,45 m +2.15 m Cold Corridor eaves heights: + 2.30 m, 2.00 m + Demolishable cold corridor built floor area: Planned 402.69 m2, new built-in cold hallway floor area: 479.78 m2 Built area: 2,933 m2 - 402.69 m2 + 479.78 = 3,010.09 m2 m2 Site area: 44,235 m2 of built: 6.80% Cold Corridor building height: 2.60 m SITES FOR LAYOUT: Parking lots are provided at the front portions of the interior next to the road, and the central area as well. The administrative building is located in the northern part of the laundry, warehouse - workshops, garbage storage, bike storage, parking, boiler room, kitchen garden on the site plan marked locations. The plot is relatively flat, sloping slightly south. THE NEW COLD CORRIDOR PLANNED WORKS DESCRIPTION: The new cold aisle 30 cm thick. masonry, outside-in 5 cm thick insulated walls 8 cm thick. insulated steel armored, self-supporting roof sandwich panels (5% slope) is made from a new insulated doors and windows. The existing-dismantled and new planned cold corridor administrative building starts with a wider section and a constriction, and the 1 and the 2 and the addition of the 3-care unit and passes connected to the above-mentioned building blocks among those . The planned new Cold Corridor is built on a completely new, modern building structures, intermittently operated as needed, tempered with minimal heating. The temperature controlled heater in the hall will be built from the substation units with care. MATERIALS, DEVICES: - Foundation: Concrete quality at least C 25/30, reinforcing steel B500. - Leg: Concrete quality at least C 25/30, reinforcing steel B500. - Masonry: AT-H80 is EPS facade insulation. - Columns: AT-H80 is EPS facade insulation. - Wreath: AT-H80 is EPS facade insulation. (20/25 min C is made of concrete, reinforcing steel B500) - Nyílásáthidalók: Above the entrance doors (5) above the rim of the purlin beams on either side of a fixed angle 90.65.6 2 L made jumper. (low C 20/25 concrete, S 235 steel, B500 is made of concrete steel) - Roofing and cladding: Class 1, C 24 pine and S is made of 235 steel) - Waterproofing: Water insulation when connecting to the existing building is part of the existing waterproofing continuity have to do. - Thermal and acoustic insulation: AUSTROTHERM will be built AT-L2 (AT-L4), step-proof insulation. - Stairs and ramps: The field stone patio, stairs and ramps and paving made sorszegélykővel paving stone staircase installation based on the LEIER terrain catalog, 2-4 cm below the sand bed, stepped into the field hálóvasalt putting in concrete beneath 25-30 cm thick. compacted crushed stone layer. - Pavement: LEIER (PIAZZA) space rock (rock edge sealed) - External constraints: korlátmagasságal upper 70 cm, 5 cm thick. stainless steel, galvanized steel tube design. (S235 is made of steel) - Finishes: tiles on the floor plan and design of the layer system, non-slip high wear resistant laminated stoneware floor tiles, respectively. non-slip exterior stone cladding. - Outer bottom and side walls: Baumit facade tinted plaster - interior walls are plastered, breathable interior paint user interface - L steel structures in stainless steel are made - the internal structure of wood panels fireproof plasterboard linings - Windows: - external doors and windows: 1.4 W / m2K), white, plastic doors and windows (97 pcs windows 90 pm 120/100 and 200/210 size 6, double exterior door) are equipped with automatic doors and windows of the planned vent in the air! - Internal fire doors: solid, one (1 piece) respectively. two wings (3) adequate EI 30 requirements symmetrical mechanical opening fire doors. - Fire resistant windows: the wind

SIOP-3.4.1 / A-11 / 1-2013-0002 identification number "Merkel Nursing-Home Care Project Férőhelykiváltási" c. Under the tendering 12-person group homes in residential construction and renovation of five people Ököritófülpösön- No. 2 contract modification

Szociális és Gyermekvédelmi Főigazgatóság | Published December 16, 2015
Winner
BEREG KONSTRUKTOR Kereskedelmi és Szolgáltató Kft.
cpvs
45215200

The five-strong residential floor area of ​​135.03 m2. Ököritófülpös 669/4. u .: The building is actually due to the function - Functional design specified by following established - '12-seat House Building ". Floor plan: The building was actually a cross-shaped building with three sides of the room units, dual entrance. Functional layout: After this it also follows from a room unit, but with two bedrooms and a Wheelchair Accessible Zuhanyzó- sink. And finally, also was scheduled for an assembly room, with its two bedroom and the bathroom. The foundation sectional layout is designed traditional sávalapozással. Accessible parking lot construction, landscaping, paving, fencing and planting to be delivered under the project. Ököritófülpös .: 629 hrsz The building actually due to its function - Functional design specified by following established - '12-seat House Building ". Floor plan: The building was actually a cross-shaped building with three sides of the room units, dual entrance. Functional layout: After this it also follows from a room unit, but with two bedrooms and a Wheelchair Accessible Zuhanyzó- sink. And finally, also was scheduled for an assembly room, with its two bedroom and the bathroom. The foundation sectional layout is designed traditional sávalapozással. Accessible parking lot construction, landscaping, paving, fencing and planting to be delivered under the project. Ököritófülpös 466/1. u: The building is actually due to the function - Functional design specified by following established - '12-seat House Building ". Floor plan: The building became a "U" shaped building, flanked by units and in the middle of the room, street entrance on both sides. The building can be basically divided into three parts: the part used by tenants: They will be approached through a separate entrance on. The front door gives a fore we move with built-in cabinets placed. Now today the development of a medium suitable for everyday usability kitchenette been taken into account and the necessary equipment can be placed on wife. The rooms have a small part of a large indoor facility, but outdoor patio approach to ensure its ventilation and Recreation possibility of partially independent of the weather. The rear of the building will be constructed in two pieces community space, which actually overlooks an interior courtyard. The 15-room unit, too, because of the potential to move to temporary problems for residents who want or needed an extra room unit has been formed, but now it's just a personal design. The Gépészeti- Server part: at the north end of the building will be designed with a engineering background and warehouse space necessary for the operation of grace. The residents and external - such as visitors. used by part: Here we took into consideration the requirements for accessibility. The foundation sectional layout is designed traditional sávalapozással. Accessible parking lot construction, landscaping, paving, fencing and planting to be delivered under the project. Ököritófülpös .: 802 hrsz The building actually due to its function - Functional design specified by following established - "5-seat House Building". Floor plan layout from the building floor plan layout changes. The change is transferred to the main entrance and the building is "L" shaped wing is coated with the residential function. The new entrance building living you get to the forefront through a windshield. Starting right here are designed for the following rooms. First, one single rooms and one double room, and then the third, it is apparent from Double Room. Then, on the north side oriented developed the visually impaired bathroom and a separate toilet block is available, of course sink. Then we get into a building opening formed in place of the old terrace kitchen - dining room, which will open to the living room. The kitchen-dining room with terrace in front of the entrance will be immediately accessible. Existing garage at the back of the building will change function rooms, will be located in a boiler room and a storage room at the same time as it will function. Sectional layout of the building ground floor installer is realized, traditional masonry structure, stand-timbered roof structure chair. Accessible parking lot construction, landscaping, paving, fencing and planting to be delivered under the project. The detailed specifications of the tender documentation.

SIOP-3.4.1 / A-11 / 1-2013-0002 identification number "Merkel Nursing-Home Care Project Férőhelykiváltási" c. Under the tendering 12-person group homes in residential construction and renovation of five people Ököritófülpösön- informational contract amendment

Szociális és Gyermekvédelmi Főigazgatóság | Published December 21, 2015
Winner
BEREG KONSTRUKTOR Kereskedelmi és Szolgáltató Kft.
cpvs
45215200

The five-strong residential floor area of ​​135.03 m2. Ököritófülpös 669/4. u .: The building is actually due to the function - Functional design specified by following established - '12-seat House Building ". Floor plan: The building was actually a cross-shaped building with three sides of the room units, dual entrance. Functional layout: After this it also follows from a room unit, but with two bedrooms and a Wheelchair Accessible Zuhanyzó- sink. And finally, also was scheduled for an assembly room, with its two bedroom and the bathroom. The foundation sectional layout is designed traditional sávalapozással. Accessible parking lot construction, landscaping, paving, fencing and planting to be delivered under the project. Ököritófülpös .: 629 hrsz The building actually due to its function - Functional design specified by following established - '12-seat House Building ". Floor plan: The building was actually a cross-shaped building with three sides of the room units, dual entrance. Functional layout: After this it also follows from a room unit, but with two bedrooms and a Wheelchair Accessible Zuhanyzó- sink. And finally, also was scheduled for an assembly room, with its two bedroom and the bathroom. The foundation sectional layout is designed traditional sávalapozással. Accessible parking lot construction, landscaping, paving, fencing and planting to be delivered under the project. Ököritófülpös 466/1. u: The building is actually due to the function - Functional design specified by following established - '12-seat House Building ". Floor plan: The building became a "U" shaped building, flanked by units and in the middle of the room, street entrance on both sides. The building can be basically divided into three parts: the part used by tenants: They will be approached through a separate entrance on. The front door gives a fore we move with built-in cabinets placed. Now today the development of a medium suitable for everyday usability kitchenette been taken into account and the necessary equipment can be placed on wife. The rooms have a small part of a large indoor facility, but outdoor patio approach to ensure its ventilation and Recreation possibility of partially independent of the weather. The rear of the building will be constructed in two pieces community space, which actually overlooks an interior courtyard. The 15-room unit, too, because of the potential to move to temporary problems for residents who want or needed an extra room unit has been formed, but now it's just a personal design. The Gépészeti- Server part: at the north end of the building will be designed with a engineering background and warehouse space necessary for the operation of grace. The residents and external - such as visitors. used by part: Here we took into consideration the requirements for accessibility. The foundation sectional layout is designed traditional sávalapozással. Accessible parking lot construction, landscaping, paving, fencing and planting to be delivered under the project. Ököritófülpös .: 802 hrsz The building actually due to its function - Functional design specified by following established - "5-seat House Building". Floor plan layout from the building floor plan layout changes. The change is transferred to the main entrance and the building is "L" shaped wing is coated with the residential function. The new entrance building living you get to the forefront through a windshield. Starting right here are designed for the following rooms. First, one single rooms and one double room, and then the third, it is apparent from Double Room. Then, on the north side oriented developed the visually impaired bathroom and a separate toilet block is available, of course sink. Then we get into a building opening formed in place of the old terrace kitchen - dining room, which will open to the living room. The kitchen-dining room with terrace in front of the entrance will be immediately accessible. Existing garage at the back of the building will change function rooms, will be located in a boiler room and a storage room at the same time as it will function. Sectional layout of the building ground floor installer is realized, traditional masonry structure, stand-timbered roof structure chair. Accessible parking lot construction, landscaping, paving, fencing and planting to be delivered under the project. The detailed specifications of the tender documentation.

Mohacsi Hospital within the framework of a contract "Mohacsi Hospital refurbishment" of SIOP-2.2.6-12 / 1B-2013-0019 projects marked with the identification number "A2" and "B" building, renovating Mohacsi Hospital 1.sz szerz.mód

Mohácsi Kórház | Published December 11, 2015
Winner
ZAÉV Építőipari Zrt.
cpvs
45215140, 45453100, 45315100, 45350000, 45313100

A2 partial conversion of the first building architecture, statics mohácsi A2 hospital was built at the end of the 1970s. The simple when you qualify PK Poroton masonry and tip. It constructed using precast prestressed concrete slab panel basement, ground floor, first floor level number, harántfalas, flat-roofed, brick facade building at the end of Raw 1990s for the then current medical technology principles to the south about 3 mrel expanded, and is equipped with a high roof. The pillars, the floor slab, stairs and front parapet walls and műszakistatikai condition is good, more suitable for duty, while other structural elements of the building (internal external doors and windows, flooring, Hoes vizszigelések, etc.), Respectively. HVAC solutions (Heating, water supply, etc) have been building this state of the thermal requirements in force today, present redevelopment taking into account the building described above status is intended that the supporting structure retention, but the outdated components to dismantling and reconstruction of the building's transformation Areas concerned must comply with the specific functional lőírásoknak 4e, respectively. generally posed technical, medical technology requirements for hospitals. The A2 basement of the central sterilization, radiology ground floor, first floor of the central building of the high-roofed attic developed medical rooms, respectively. It located at the operating level building premises. In the present rebuilding of both technically and technologically outdated complete reconstruction of central sterilization, respectively. CT equipment in the field of radiology, ultrasound MH 2 pieces of equipment placement, as well as patients in the radiology server toilet units and the development of related travel waiting to be solved. (Between the operating room and sterilization) Sterile transport of building materials incorporating anyagemelők incoming from the outside, respectively. sterile materials will be transported to the sterilization through direct contact with a newly developed material receiver. Because of fire regulations in the basement and the ground floor are building a network of fire detection, respectively. A2 design of the building with a separate fire section as a partial solution to the basement corridor in the basement smoke-free mechanical design solutions can be provided. The building insulation condition of the affected areas for improvement in the design window replacement, respectively. necessary to build up internal heat insulation due to the rough brick facade. Building A2 of the hospital central heating boiler house innovative engineering solution gets the fűtőés The construction work involved rebuilding areas of the building will receive a new radiator heating. During the reconstruction of the entire high and low voltage network reconstructed. The total floor area of ​​buildings A2: 1,857.40 m2 building sections concerned of transformation: Basement: 399.43 m2 Ground floor: 217.83 m2 Total area converted: 617.26 m 2, structural features: Demolition work: reconstruction of the affected areas of the building structural system (Walls , floors, parapetés frontal boundary walls) while maintaining full visszabontandó. Foundation works: The new concrete footings material width and depth as the load-bearing soil reaches the static plans are made. Fales socket layer: 1 layer. modified bitumen hard disk, Gv4,2, the main external walls: The receiver of sterilizing material contact with the soil POROTHERM 38 walls of brick masonry cellar. Partitions: POROTHERM 10 walls. Ceiling breakthroughs: PK reinforced concrete floor structure as breaking through the static plan. Jumpers: Above the openings in the bulkhead A10 of the main walls POROTHERM POROTHERM S battery high jumper, respectively. steel redemption will be built in dimensions and exterior doors kialakítással.6 According to the static plans: REHAU BRILLIANT DESIGN five cellular plastics, custom-made windows made of white, argon-filled insulating glass. Window: The exterior window sills RAL 9007 anodized aluminum structure, internal REHAU window sills made of white plastic. Internal doors and windows: DOMOFERM fémtokos wing doors powder-coated metal to metal frames subsequent mázolásúak, RAL 1019 colors. 5 The fire doors made of colors RAL 1019 "DOMOFERM PRESTIGE ROAD 692" structure. Underfloor Insulation: The entire surface of the expanded basement jacks held in the lower layer 1 layer. Gv4.2 hard disk modified bitumen waterproofing and thermal insulation 4 cm AUSTROTHERM N100 invested. By using a thermal insulation system YTONG Multipor inner side. Bu

Mohacsi Hospital a contract under the SIOP-2.2.6-12 / ID No. 1B-2013-0019 "Mohacsi Hospital Renovation" project Mohacsi Hospital "A2" and "B" building, renovating II.sz. authors. mode

Mohácsi Kórház | Published December 2, 2015
Winner
ZAÉV Építőipari Zrt.
cpvs
45215140, 45453100, 45315100, 45350000, 45313100

A2 partial conversion of the first building architecture, statics mohácsi A2 hospital building was built in the late 1970s. The simple when you qualify PK Poroton masonry and tip. constructed using precast prestressed concrete slab panel basement, ground floor, first floor level number, harántfalas, flat roof, at the end of the brick-fronted building in the 1990s for the then current medical technology principles to the south approximately 3 m expanded, and high roof fitted. The pillars, the floor slab, stairs, structural and technical condition of the facade parapet walls are good, more suitable for duty, while other structural elements of the building (exterior and interior doors, flooring, heat and vizszigelések, etc.), Respectively. HVAC solutions (Heating, water supply, etc) have been building this state of the thermal requirements in force today, present redevelopment taking into account the building described above status is intended that the supporting structure retention, but the outdated components to dismantling and reconstruction of the building's transformation Areas concerned must comply with the specific functional requirements 4, respectively. generally posed technical, medical technology requirements for hospitals. The A2 basement of the central sterilization, radiology ground floor, first floor of the central building of the high-roofed attic developed medical rooms, respectively. It located at the operating level building premises. In the present rebuilding of both technically and technologically outdated complete reconstruction of central sterilization, respectively. CT equipment in the field of radiology, ultrasound MH 2 pieces of equipment placement, as well as patients in the radiology server toilet units and related travel - the creation waiting to be solved. (Between the operating room and sterilization) Sterile transport of building materials incorporating anyagemelők incoming from the outside, respectively. sterile materials will be transported to the sterilization through direct contact with a newly developed material receiver. Because of fire regulations in the basement and the ground floor are building a network of fire detection, respectively. A2 design of the building with a separate fire section as a partial solution to the basement corridor in the basement smoke-free mechanical design solutions can be provided. The building insulation condition of the affected areas for improvement in the design window replacement, respectively. necessary to build up internal heat insulation due to the rough brick facade. Building A2 of the hospital central heating boiler house innovative engineering solutions given in the areas of building construction work involved rebuilding receive a new radiator heating. During the reconstruction of the entire high and low voltage network reconstructed. The total floor area of ​​buildings A2: 1,857.40 m2 building sections concerned of transformation: Basement: 399.43 m2 Ground floor: 217.83 m2 Total area converted: 617.26 m 2, structural features: Demolition work: reconstruction of the affected areas of the building structural system (Walls , floors, parapet and facade boundary walls) while maintaining full visszabontandó. Foundation works: The new concrete footings material width and depth as the load-bearing soil reaches the static plans are made. Wall and sockets layer: 1 layer. modified bitumen hard disk, GV 4.2; Outside the main walls: The receiver of sterilizing material contact with the soil POROTHERM 38 walls of brick masonry cellar. Partitions: POROTHERM 10 walls. Ceiling breakthroughs: PK reinforced concrete floor structure as breaking through the static plan. The main element of high walls POROTHERM S bridging, respectively. steel redemption will be built in dimensions and exterior doors kialakítással.6 According to the static plans: REHAU BRILLIANT DESIGN five cellular plastics, custom-made windows made of white, argon-filled insulating glass. Window: The exterior window sills RAL 9007 anodized aluminum structure, internal REHAU window sills made of white plastic. Mázolásúak subsequent frames of metal, RAL 1019 color. 5 The fire doors made of colors RAL 1019 "DOMOFERM PRESTIGE ROAD 692" structure. Underfloor Insulation: The entire surface of the expanded basement jacks held in the lower layer 1 layer. GV-4.2 hard disk modified bitumen waterproofing and thermal insulation 4 cm AUSTROTHERM N100 invested. By using a thermal insulation system YTONG Multipor inner side. Floor: Building internal premises with construction plan detailing the TARKETT gresslap and wall coverings in general csempeanyagúak. Ceiling: The building receives gypsum board cover closed, ag

Information on the process of Local Government institutions felújítása- eredményéről- Part V

Nyíregyháza Megyei Jogú Város Önkormányzata | Published September 16, 2015
Winner
Four-Road Kft.
cpvs
45262690

Renovation of municipal institutions below and detailed in the documentation: 1.Aprajafalva Nursery (J. Fazekas Square) Plumbing and heating system modernization, patio paving, sand pits, playground equipment yard and repair services (Phase I). Plumbing exchange renovated bath, 1 RSZ potable water. 1 bath renovation of heating pipeline replacement RSZ. Placing Valve Making an external or internal thread 20 PEI IV wear-resistant ceramic tiles with plinth, fugázva 26 nm New 10x20x6cm sized gray parquet paving stone laying of 350 nm Doll House Nursery (Krúdy Gy.u.) Interior painting, sand repair, fence painting. 1.3m tall metal structure 'U' profile cage fences anti-corrosion paint on the boundary painting of red 2 layers 328 fm Group Room ceiling painting of breakdown of white emulsion paint two coats 395 nm 2,5x4m's sandboxes on the terrace (for wall-threatening proximity and a metal column, there is a sandbox) 4 New sandboxes plane sunk framework (20x50cm in size) formwork, concreting of 56 m Bóbita Nursery (Tas u.) Parquet renewal, replacement radiator valves, repair ceramic tiles and replacement of sewage manhole escalator (Phase I ) 208 nm positioning radiator valve internal or external thread and nut connected to DN 15 thermostatic valve, thermostatic valve Oventrop of design thermostatic valve body, 1/2 ", 3/4" 91 pieces bathe new glazed ceramic falburkolatának bonding flexible adhesive, flexible fugázával 192 Concrete nm mines, adapt to level 8 yard third. No.) Patio fencing, playground design, positioning shutters venetian blinds Installation of new adjustable-size windows 2,68x1,66m 9 pieces 1,1m high fence construction of a new concrete plinth, max 7cm- and sticks to divide a lot, 1pc 1m opening gates, anti-corrosive paint lekenve 2 layers of 85 m new indoor 10 occasions bicycle storage bicycle storage building, steel structure, anti-corrosion paint two coats 1 15.sz.) Pavement repair, flooring repair 1 rear door, new sidewalk around the building concreting of 5 nm New üvegfátyollal reinforced dimensional stability, color-printed, chemically pressed, with the surface of solid abrasive coating, foam PVC badlóburkolat bonding of the entire surface, at least 8cm legs, joints of welded repair of 60 nm No. 2) Electric networks, heating modernization. Thermostatic radiator valve head equipment, Oventrop thermostatic built-in sensor, barring option review 14 electric system, disconnecting electric network measuring 1 x 1 x 7.Hóvirág bölcsödéről Nursery (Mill Street) Parquet repair, homokozó-, babakocsitároló-, beach umbrella Improving boiler house building in- and improve the parquet floor on the inside to improve Employing our, passzítása, sanding and painting 108 nm New stroller container frame construction 4x4cm and zártszelvényből anti-corrosive paint lekenve preparing two layers 1 klt new stroller storage walls and roof of 1cm thick multiwall polycarbonate sheet, bolted to 90 nm New 2,8x9,6m-scale outdoor installation of retractable shade canopy structure 4 Ceiling and wall coverings and tile removal of loose plaster, engraving, complete with water and electricity cable replacement due to 88 nm impregnated plaster ceiling and walls covering, edge protection beépítéssel edges, reinforced area behind water heater rear wall structure 88 nm PEI IV wear-resistant ceramic flooring flexible adhesive, flexible jointing Grouting a laundry, toilets, changing rooms and shower areas and 37.5 nm Ladybird Nursery radiator valve replacement and repair of sewerage systems, pavement replacement and repair yard games equipment Thermostatic valve head radiator, Oventrop necessary to replace thermostatic built-in sensor, limiting options 109 pieces of existing asbestos pipe location, KG tube 25 m New wooden Making 1x1,5m-foot outdoor dollhouse painting, pedestal 3 New min PEI IV wear-resistant ceramic tiles on flexible glue the entire surface, Grouting elastic jointing 25 nm Pooh Nursery (Stadium Street) Interior painting, coating, repair and maintenance, replacement, replacement of kitchen faucets, fencing and other economic Entrance repair New üvegfátyollal reinforced dimensional stability, color-printed, chemically pressed, with the surface of solid abrasive coating, foam PVC flooring the entire surface, at least 8cm legs, welded joints of 165 nm Group Room ceiling painting of colors specified by the head of the institution 2 layers 165 nm Group Room painting of the walls above the paneling, the head of the institution by

Zákány 8852, May 1, u. 860 / B / 4. interior renovation works hrsz.-u flat, indicative of the outcome of the procedure.

Zákány Község Önkormányzata | Published September 14, 2015
Winner
KOZÓ BAU Kft.
cpvs
45000000, 45210000

Zákány for Local Government "Ours here in the Square - Creating a home sub-project" as part of the tender awarded at the 8852 Zákány purchased, May 1, 860 u / B / 4th. interior renovation works hrsz.-u flat, within the framework of a contract to ID number: 3.2.3 SIOP-13 / 1-2013-0001 purchased Zákány 8852, May 1, 860 u / B / 4th. ú hrsz.-room apartment Detection: Room 1 Hallway 5.75 m2 floor ceramic tiles Room 2 Room 3 15.00 20.35 laminate flooring laminate flooring ceramic flooring 5 8.32 4 Dining Kitchen Pantry 4 6 8.54 ceramic flooring, Spa 3.76 7 33 ceramic flooring ceramic flooring ceramic flooring 8 WC 1.56 Total: 67.61 1-A HISTORY LOCATION DESCRIPTION The ground floor + 1 storey block of flats in her building, located in the apartment is fixed. Construction of the estimated 1960, sávalapozással gravel concrete, traditional masonry structures, concrete modular floor structure, wooden ácsszerkezetű high roof, undeveloped attic space. 2. The proposed renewal DESCRIPTION During the reconstruction project of 860 / B / 4th hrsz. interior renovation of housing-u wish to raise the degree of comfort. Planned technical content - toilet, bath rooms refurbishment of ceramic tiles replacement, épületgépészeti-, electrical reconstruction - improving frontal doors and windows, joints, replacing as necessary valves, fittings, gaskets revision - internal doors replacement - Apartments building electric revision retrofitted according to the standards in force, Protection Protocol, replacing as necessary fittings - oldalfalak-, ceiling painting of the necessary parts operations, plaster repairs - the roof slab covered with insulation Foundations STRUCTURAL DESCRIPTION: During the load-bearing wall structures made of gravel concrete footings - unchanged. Load-bearing structures: the existing structural walls 38 cm thick. solid brick masonry units improved bilateral lime plaster, grout walled, connections, unchanged facade of the technolóiai training standards: Kőporos scraped plaster facade, facade paint - unchanged. Roof trusses, roofing: roofing slate traditional standard constant-Partition: 10 cm thick. Building on the partition elements. Plumbing structure: Galvanized steel eaves, drain channel - ceiling unchanged: Battery concrete structures - concrete screed unchanged: The sockets are resolution, after the completion of the engineering alapszerelések new socket is made of concrete C16-16 / KK quality kavicsbetonnal. Coverage: The rooms will receive new flooring and wall covering, which the plan panel in each room are marked. The self-leveling floors made of leveling Before starting the installation, and then placed into a flexible adhesive ceramic tiles ballast and poly foam underlay disc 33 wear-resistant laminate flooring are installed flooring, skirting border closures attendant. The bathroom has a height of 2.10 m and 1.50 m in height toilets, kitchens while the 60 cm and cemented the band between the lower and upper kitchen elements made of tile cladding. Doors and windows: Exterior doors and windows remaining structures created to match. The interior doors are installed insulation after unpacks new standard sized, surface-treated wood doors: Rockwool Multi Rock mineral wool is placed insulation blanket and protective PE foil Inner finish: plastered walls and ceilings after the necessary preparatory sub-actions 2x-i fairing, 2x i white painting is made of plastic. Lighting: The existing outdated system in place falhoronyban, protective pipe and copper wire mounted power grid made new fittings (switches, sockets, lighting fixtures) positioning of the existing housing design the same way. Heating: Existing solid fuel system - constant hot water supply: Existing electric boiler prepared - constant water supply instead of the existing outdated installation, floors and falhornyokban new five-layer plastic tube mounted systems, new fittings placing Sanitation: Plastic KG-PVC pipe mounted system, the existing trails Garbage taking into account storage and transport: the collection and removal of municipal waste generated in the locality familiar manner with receptacles, removing by service provider. ENVIRONMENT: harmful pollutants point, the noise source is not built during the reconstruction, new pollutant is formed.

We own space in the sub-Creating a home Zákány 860 / B / 4th u apartment interior renovation, informative amending the contract.

Zákány Község Önkormányzata | Published September 18, 2015
cpvs
45000000, 45210000

Zákány for Local Government "Ours here in the Square - Creating a home sub-project" as part of the tender awarded at the 8852 Zákány purchased, May 1, 860 u / B / 4th. interior renovation works hrsz.-u flat, within the framework of a contract to ID number: 3.2.3 SIOP-13 / 1-2013-0001 purchased Zákány 8852, May 1, 860 u / B / 4th. ú hrsz.-room apartment Detection: Room 1 Hallway 5.75 m2 floor ceramic tiles Room 2 Room 3 15.00 20.35 laminate flooring laminate flooring ceramic flooring 5 8.32 4 Dining Kitchen Pantry 4 6 8.54 ceramic flooring, Spa 3.76 7 33 ceramic flooring ceramic flooring ceramic flooring 8 WC 1.56 Total: 67.61 1-A HISTORY LOCATION DESCRIPTION The ground floor + 1 storey block of flats in her building, located in the apartment is fixed. Construction of the estimated 1960, sávalapozással gravel concrete, traditional masonry structures, concrete modular floor structure, wooden ácsszerkezetű high roof, undeveloped attic space. 2. The proposed renewal DESCRIPTION During the reconstruction project of 860 / B / 4th hrsz. interior renovation of housing-u wish to raise the degree of comfort. Planned technical content - toilet, bath rooms refurbishment of ceramic tiles replacement, épületgépészeti-, electrical reconstruction - improving frontal doors and windows, joints, replacing as necessary valves, fittings, gaskets revision - internal doors replacement - Apartments building electric revision retrofitted according to the standards in force, Protection Protocol, replacing as necessary fittings - oldalfalak-, ceiling painting of the necessary parts operations, plaster repairs - the roof slab covered with insulation Foundations STRUCTURAL DESCRIPTION: During the load-bearing wall structures made of gravel concrete footings - unchanged. Load-bearing structures: the existing structural walls 38 cm thick. solid brick masonry units improved bilateral lime plaster, grout walled, connections, unchanged facade of the technolóiai training standards: Kőporos scraped plaster facade, facade paint - unchanged. Roof trusses, roofing: roofing slate traditional standard constant-Partition: 10 cm thick. Building on the partition elements. Plumbing structure: Galvanized steel eaves, drain channel - ceiling unchanged: Battery concrete structures - concrete screed unchanged: The sockets are resolution, after the completion of the engineering alapszerelések new socket is made of concrete C16-16 / KK quality kavicsbetonnal. Coverage: The rooms will receive new flooring and wall covering, which the plan panel in each room are marked. The self-leveling floors made of leveling Before starting the installation, and then placed into a flexible adhesive ceramic tiles ballast and poly foam underlay disc 33 wear-resistant laminate flooring are installed flooring, skirting border closures attendant. The bathroom has a height of 2.10 m and 1.50 m in height toilets, kitchens while the 60 cm and cemented the band between the lower and upper kitchen elements made of tile cladding. Doors and windows: Exterior doors and windows remaining structures created to match. The interior doors are installed insulation after unpacks new standard sized, surface-treated wood doors: Rockwool Multi Rock mineral wool is placed insulation blanket and protective PE foil Inner finish: plastered walls and ceilings after the necessary preparatory sub-actions 2x-i fairing, 2x i white painting is made of plastic. Lighting: The existing outdated system in place falhoronyban, protective pipe and copper wire mounted power grid made new fittings (switches, sockets, lighting fixtures) positioning of the existing housing design the same way. Heating: Existing solid fuel system - constant hot water supply: Existing electric boiler prepared - constant water supply instead of the existing outdated installation, floors and falhornyokban new five-layer plastic tube mounted systems, new fittings placing Sanitation: Plastic KG-PVC pipe mounted system, the existing trails Garbage taking into account storage and transport: the collection and removal of municipal waste generated in the locality familiar manner with receptacles, removing by service provider. ENVIRONMENTAL PROTECTION:

Information on Profit-Bodrogkeresztúr, József Eötvös Elementary School Modernization

Bodrogkeresztúr Községi Önkormányzat | Published September 28, 2015
Winner
ARM Invest Trade Kft.
cpvs
45100000

Subject: Renovation of primary school technical content of the tender documentation. Quantities: Putting placement of the building, enclosing the mass does not change during upgrading. ARCHITECTURAL DESCRIPTION Placement - Place Building, overall weight is not changed during the upgrade. Major specifications of the plan on the ground floor level of the floor height ± 0.00, the outer sloping terrain varies between -0.05 and -0.40 m compared to this. The institution currently involves 161 students, the number of teachers 15. According to OTÉK calculation of required toilets are as follows: - 15 main female headcount one toilet bowl, 40 men headcount 1 wc + 1 urinal in primary schools for planning szavány (IEC 24203 -2) as follows: - 10 subsidiaries 1wc cup headcount, number of employees must be 40 boys 1 + 2 toilet urinal. Taking into account the stringent requirements of the standard, modified Plumbing female teachers and male toilet 1-1, 8 subsidiaries toilet, and 2 toilets boy is 4 urinals. The planned internal restructuring of the load-bearing structure is not affected, it can be done without a building permit. The proposed changes to the building of the central wing of the building, starting from the design of the modernization program carried out in the next modernization and expansion work: · New water block is made of the existing site, based on the calculations described in the preceding paragraph. The front roof support structure independent from the building suggest constructed so that the Government Decree 312/2012 on the construction permit procedure No.1. Pursuant to Annex also will be feasible without carrying a separate building permit procedure. The planned building renovations are in addition to those listed in the preceding paragraph shall be the central wing has carried out renovation work in the following: Instead of 2 x 70 kW will be equipped with modern and efficient gas-fired condensing boiler. • The premises falburkolatait floor and be part of the total floor area of ​​buildings to replace the breakdown of old coatings. (Where the floor level permits, and the condition of the existing pavement correct, there's the current cover is not removed. • To replace the worn interior doors modern, wooden interior doors. • Review of shock protection point of view, part of the building electrical system, and the necessary repairs, interventions must be made. (This is presumably require replacement of the vast majority of the existing power grid.) • The heating system should be redesigned completely for the current system to replace elbontásával.Az all radiator. • Perform a full field of building part the painting work. TERM STRUCTURAL DESCRIPTION (the design documentation specific structural design section is made, therefore, only be held in the building structures brief statement of) a smaller amount of ground work will be required during the landscaping as interior finishes, final landscaping levels of development of intervention is necessary. The foundation status referring to major cracks appropriate descend on the building is not detected. - Under the new building parts C10 quality concrete strip foundation under the columns basic point is made. The existing walls, small cracks are detected in some places - although sag resistance does not pose a problem - investigation and require repairs. - The new skirting the walls (in the front stairs) precast concrete formwork elements are made from, C12 quality concrete pouring. - The front roof pillars supporting beams are made of wood, 15 × 15 cm cross section. Slabs - téglaboltotzatos ceiling of the existing building, as well as béléstestes-beams and wood-beamed ceilings that are in good condition. - New ceiling is not made during the procedure. Wreaths, triggering - The middle wing 15cm thick walls kipótlásánál over the holes in them with a high element S Porotherm lintels are built duplicated. Stairs - reinforced concrete stairs at the building exterior are made. - The front stairs are made of C12 grade concrete monolith, élvédőkkel, non-slip and frost resistant ceramic coating. The roof structure is in good condition but must be inspected during construction, and the need for reinforcements to be done. The wood materials to be installed must be provided with treatment against fungal and insect pests and fire retardant treatment prior to use. BUILDING CONSTRUCTION DESCRIPTION The flue gas condensing boilers are lightweight and do not constitute a chimney. The roof should examine the potential to repair, reinforcement times

DDOP-4.1.2 / B-13-2014-0004 identification number, "Housing integration amplifier settlement of Pecs mine site rehabilitation" project on construction related - No. 2. author mode.

Pécs Megyei Jogú Város Önkormányzata | Published October 2, 2015
Winner
Szabadi és Társa Kereskedelmi és Építőipari Szolgáltató Kft.
cpvs
45262690, 45232452, 45262100, 45262300, 45262500, 45410000, 45443000, 45310000, 45350000, 45330000, 45111100, 45442100, 45261400

Procurement subject: DDOP-4.1.2 / B-13-2014-0004 identification number, "Housing integration amplifier settlement of Pecs mine site rehabilitation" was associated with the project implementation. The present investment in social housing refurbishment, demolition, renovation and storm sewer and road network, the renovation of a community center to be implemented in law and in DDOP for grants under the DDOP-4.1.2 / B-13-2014-0004 identification number "Housing integration amplifier urban rehabilitation Pécs Mining Plant" project in accordance with the grant agreement -4.1.2 / B-11 Identification number of projects be maintained. The contractor responsible for the construction plans and building permits are reserved, and implementation of technical content required under Customer requirements. Licensing and design documentation prepared by the second) were determined. Main quantities: Community Church of architecture accessibility: young children, thinking of changing folding changing table is possible with barrier-free toilets. Parts of the building are cserépfedésű roof covering is over. The facades are heat insulation, external doors and windows will be replaced. From tactile pavement will lead to new, barrier-free entrance with (standards compliant) ramp. Building Services: The heating system will be maintained, but new boiler will be installed. The project will be solved within the framework of the cooking gas appliances in the interior, air supply and extraction facilities. Building wiring: The distributor of a central circuit breaker was designed for the new space we are building new tram network with new luminaires, fixtures. External utilities: Based on registration number 4/66945 declaration of public utility and utility plans available in the plot. Hospital utca 1. Architecture: The building has two other apartment termination of the basement stairs and drainage at the site for a new bathroom and WC. The building has been completely renovated (roofing replacement, facade insulation, loft insulation of windows, replacement doors, replacement of flooring, painting). The flats in the backyard runoff stairs are made of steel. Building Services: Offices will be solved heated by an electric heater. Building wiring: The value of office lighting has been designed in accordance with the regulations. External utilities: Based on registration number 4/66945 declaration of public utility and utility plans available in the plot. Architecture Street Hospital 2: apartments in the building will be terminated stairs to the basement drain and place in a new bathroom and toilets will be constructed. The building has been completely renovated (roofing replacement, facade insulation, loft insulation of windows, replacement doors, replacement of flooring, painting). The flats in the backyard runoff stairs are made of steel. Building services: every flat 1pc 1pc stove and electric heaters in the room and 1 electric wall heater is installed in the bathroom. Building wiring: Brand new tram network will be built with new fixtures with fixtures. External utilities: Based on registration number 4/66945 declaration of public utility and utility plans available in the plot. Hospital Street Architecture 3 apartments in the building will be removed to the basement stairs and drainage at the site for a new bathroom and toilets will be constructed. The building has been completely renovated (roofing replacement, facade insulation, loft insulation of windows, replacement doors, replacement of flooring, painting). The flats in the backyard runoff stairs are made of steel. Building services: every flat 1pc 1pc stove and electric heaters in the room and 1 electric wall heater is installed in the bathroom. Building wiring: Brand new tram network will be built with new fixtures with fixtures. External utilities: Based on registration number 4/66945 declaration of public utility and utility plans available in the plot. Hospital utca 5. Architecture: The apartment is fully renovated (painting, replacement housing, etc). Building installation: The kitchen-dining room with solid fuel stove heater will provide. Building wiring: In a small distribution center will be built in circuit protection switch, all-new tram network is being built with new fixtures with fixtures. External utilities: Based on registration number 4/66945 declaration of public utility and utility plans available in the plot. 6th Street Hospital Architecture: lower part of the building next to the main building completely

DDOP-4.1.2 / B-13-2014-0006 identification number "Housing integration amplifier town Pécs-Somogy mine site rehabilitation and shaft Rücker" associated with the project on construction - No. 2. author mode.

Pécs Megyei Jogú Város Önkormányzata | Published October 2, 2015
Winner
Szabadi és Társa Kft.
cpvs
45262690, 45232452, 45262100, 45262300, 45262310, 45262500, 45410000, 45443000, 45310000, 45350000, 45330000, 45111100, 45442100, 45212100, 45233200, 37535200, 37535210, 45261400

DDOP-4.1.2 / B-13-2014-0006 identification number "Housing integration amplifier town Pécs-Somogy mine site rehabilitation and shaft Rücker" was associated with the project implementation. The present investment under the DDOP-4.1.2 / B-13-2014-0006 identification number "Housing integration amplifier urban rehabilitation Pécs-Somogy mine site and Rücker shaft" project social housing renovation and demolition, community center renovation, construction and storm sewer and road networks renovate playground and the legislation must be implemented DDOP-4.1.2 / B-11 Identification number of projects for grants in accordance with the grant agreement be maintained. The contractor responsible for the construction plans and building permits are reserved, and implementation of technical content required under Customer requirements. Licensing and design documentation prepared by the second) were determined. Main quantities: Community Church of architecture Accessibility: The entire building façade undergoes renovations. New roofing is made of the facade and the insulation will be warming the camp ceilings, doors and windows, the facade will be replaced. The total existing sanitary facilities and a new part of the building will be built instead demolished. The existing kitchen will be modernized heating. The building in those areas of new flooring is made and painting. Currently, the House of Culture can not be considered free of obstacles, persons with disabilities need help to use it with or not. Inside the building has one room was not accessible barrier-free, after the conversion, the following facilities are available: Miners Club. In young children, thinking changing opportunity folding changing table with a barrier-free toilets. All of these contribute to the modernization of equal opportunities. Building Services: washroom renovations, construction of radiator heating systems, new boiler and hot water tank, gas supply tidying the current regulations, kitchen with gas appliances air supply, interior, premises extraction. Building wiring: Each distributor is a central circuit breaker, the space for new power network we are building a new luminaires, fixtures. External utilities: rainwater brass wool before the plot will be driving in the street Somogy flat concrete drainage ditch. School of frequency points to prepare and modernize the lighting will take place in front of the computer room corridor area. Rücker- pit four residential buildings and associated outbuildings complete demolition and settlement of the area. Pécs- County mine works 34/4 apartments apartment Architecture: architectural works related to these works should be carried out (replacement doors, flooring, painting). Building services: Complete design of sanitary facilities, and the bathroom is placed in a new electric wall heater. Building wiring: The whole apartment to the existing power grid will be demolished, replaced by new network will be built. External utilities: Consumer built on the existing water supply to the facility as well as consumer vízmérőaknától the existing wastewater sewer aknától transfer to the facility. 04.21 flat design: The room is placed in a new window. Building services: Complete design of sanitary facilities, and the bathroom is placed in a new electric wall heater. Building wiring: The whole apartment to the existing power grid will be demolished, replaced by new network will be built. External utilities: Consumer built on the existing water supply to the facility as well as consumer vízmérőaknától the existing wastewater sewer aknától transfer to the facility. 48/3 flat design: these architectural works related to the work should be carried out (replacement doors, flooring, painting). Building services: Complete design of sanitary facilities, and the bathroom is placed in a new electric wall heater. Building wiring: The whole apartment to the existing power grid will be demolished, replaced by new network will be built. External utilities: Consumer built on the existing water supply to the facility as well as consumer vízmérőaknától the existing wastewater sewer aknától transfer to the facility. (48/3 and 48/4 of the home's water supply and sewage disposal is done with common surnames) home 48/4 Architecture: architectural works related to these works should be carried out (replacement doors, flooring, painting). Building services: Complete design of sanitary facilities, and the bathroom is placed in a new electric wall heater. Building wiring: The whole apartment to the existing power grid

"The Merkel-Care Nursing Home Project Férőhelykiváltási" c. Under the tendering 12-person group homes in residential construction and renovation of five people Ököritófülpös - No. 1 contract modification

Szociális és Gyermekvédelmi Főigazgatóság | Published September 11, 2015
Winner
BEREG KONSTRUKTOR Kereskedelmi és Szolgáltató Kft.
cpvs
45215200

The five-strong residential floor area of ​​135.03 m2. Ököritófülpös 669/4. u .: The building is actually due to the function - Functional design specified by following established - '12-seat House Building ". Floor plan: The building was actually a cross-shaped building with three sides of the room units, dual entrance. Functional layout: After this it also follows from a room unit, but with two bedrooms and a Wheelchair Accessible Zuhanyzó- sink. And finally, also was scheduled for an assembly room, with its two bedroom and the bathroom. The foundation sectional layout is designed traditional sávalapozással. Accessible parking lot construction, landscaping, paving, fencing and planting to be delivered under the project. Ököritófülpös .: 629 hrsz The building actually due to its function - Functional design specified by following established - '12-seat House Building ". Floor plan: The building was actually a cross-shaped building with three sides of the room units, dual entrance. Functional layout: After this it also follows from a room unit, but with two bedrooms and a Wheelchair Accessible Zuhanyzó- sink. And finally, also was scheduled for an assembly room, with its two bedroom and the bathroom. The foundation sectional layout is designed traditional sávalapozással. Accessible parking lot construction, landscaping, paving, fencing and planting to be delivered under the project. Ököritófülpös 466/1. u: The building is actually due to the function - Functional design specified by following established - '12-seat House Building ". Floor plan: The building became a "U" shaped building, flanked by units and in the middle of the room, street entrance on both sides. The building can be basically divided into three parts: the part used by tenants: They will be approached through a separate entrance on. The front door gives a fore we move with built-in cabinets placed. Now today the development of a medium suitable for everyday usability kitchenette been taken into account and the necessary equipment can be placed on wife. The rooms have a small part of a large indoor facility, but outdoor patio approach to ensure its ventilation and Recreation possibility of partially independent of the weather. The rear of the building will be constructed in two pieces community space, which actually overlooks an interior courtyard. The 15-room unit, too, because of the potential to move to temporary problems for residents who want or needed an extra room unit has been formed, but now it's just a personal design. The Gépészeti- Server part: at the north end of the building will be designed with a engineering background and warehouse space necessary for the operation of grace. The residents and external - such as visitors. used by part: Here we took into consideration the requirements for accessibility. The foundation sectional layout is designed traditional sávalapozással. Accessible parking lot construction, landscaping, paving, fencing and planting to be delivered under the project. Ököritófülpös .: 802 hrsz The building actually due to its function - Functional design specified by following established - "5-seat House Building". Floor plan layout from the building floor plan layout changes. The change is transferred to the main entrance and the building is "L" shaped wing is coated with the residential function. The new entrance building living you get to the forefront through a windshield. Starting right here are designed for the following rooms. First, one single rooms and one double room, and then the third, it is apparent from Double Room. Then, on the north side oriented developed the visually impaired bathroom and a separate toilet block is available, of course sink. Then we get into a building opening formed in place of the old terrace kitchen - dining room, which will open to the living room. The kitchen-dining room with terrace in front of the entrance will be immediately accessible. Existing garage at the back of the building will change function rooms, will be located in a boiler room and a storage room at the same time as it will function. Sectional layout of the building ground floor installer is realized, traditional masonry structure, stand-timbered roof structure chair. Accessible parking lot construction, landscaping, paving, fencing and planting to be delivered under the project. The detailed specifications of the tender documentation.

DDOP4.1.2 / B1320140004 identification number, "Housing integration amplifier settlement of Pecs mine site rehabilitation" was associated with the project design - No. 1 contract modification

Pécs Megyei Jogú Város Önkormányzata | Published September 4, 2015
Winner
Szabadi és Társa Kereskedelmi és Építőipari Szolgáltató Kft.
cpvs
45262690, 45232452, 45262100, 45262300, 45262500, 45410000, 45443000, 45310000, 45350000, 45330000, 45111100, 45442100, 45261400

Procurement subject: DDOP-4.1.2 / B-13-2014-0004 identification number, "Housing integration amplifier settlement of Pecs mine site rehabilitation" was associated with the project implementation. The present investment in social housing refurbishment, demolition, renovation and storm sewer and road network, the renovation of a community center to be implemented in law and in DDOP for grants under the DDOP-4.1.2 / B-13-2014-0004 identification number "Housing integration amplifier urban rehabilitation Pécs Mining Plant" project in accordance with the grant agreement -4.1.2 / B-11 Identification number of projects be maintained. The contractor responsible for the construction plans and building permits are reserved, and implementation of technical content required under Customer requirements. Licensing and design documentation prepared by the second) were determined. Main quantities: Community Church of architecture accessibility: young children, thinking of changing folding changing table is possible with barrier-free toilets. Parts of the building are cserépfedésű roof covering is over. The facades are heat insulation, external doors and windows will be replaced. From tactile pavement will lead to new, barrier-free entrance with (standards compliant) ramp. Building Services: The heating system will be maintained, but new boiler will be installed. The project will be solved within the framework of the cooking gas appliances in the interior, air supply and extraction facilities. Building wiring: The distributor of a central circuit breaker was designed for the new space we are building new tram network with new luminaires, fixtures. External utilities: Based on registration number 4/66945 declaration of public utility and utility plans available in the plot. Hospital utca 1. Architecture: The building has two other apartment termination of the basement stairs and drainage at the site for a new bathroom and WC. The building has been completely renovated (roofing replacement, facade insulation, loft insulation of windows, replacement doors, replacement of flooring, painting). The flats in the backyard runoff stairs are made of steel. Building Services: Offices will be solved heated by an electric heater. Building wiring: The value of office lighting has been designed in accordance with the regulations. External utilities: Based on registration number 4/66945 declaration of public utility and utility plans available in the plot. Architecture Street Hospital 2: apartments in the building will be terminated stairs to the basement drain and place in a new bathroom and toilets will be constructed. The building has been completely renovated (roofing replacement, facade insulation, loft insulation of windows, replacement doors, replacement of flooring, painting). The flats in the backyard runoff stairs are made of steel. Building services: every flat 1pc 1pc stove and electric heaters in the room and 1 electric wall heater is installed in the bathroom. Building wiring: Brand new tram network will be built with new fixtures with fixtures. External utilities: Based on registration number 4/66945 declaration of public utility and utility plans available in the plot. Hospital Street Architecture 3 apartments in the building will be removed to the basement stairs and drainage at the site for a new bathroom and toilets will be constructed. The building has been completely renovated (roofing replacement, facade insulation, loft insulation of windows, replacement doors, replacement of flooring, painting). The flats in the backyard runoff stairs are made of steel. Building services: every flat 1pc 1pc stove and electric heaters in the room and 1 electric wall heater is installed in the bathroom. Building wiring: Brand new tram network will be built with new fixtures with fixtures. External utilities: Based on registration number 4/66945 declaration of public utility and utility plans available in the plot. Hospital utca 5. Architecture: The apartment is fully renovated (painting, replacement housing, etc). Building installation: The kitchen-dining room with solid fuel stove heater will provide. Building wiring: In a small distribution center will be built in circuit protection switch, all-new tram network is being built with new fixtures with fixtures. External utilities: Based on registration number 4/66945 declaration of public utility and utility plans available in the plot. 6th Street Hospital Architecture: lower part of the building next to the main building completely

Reconstruction and modernization of the framework contract for the supply of drinking water, as well as complete construction work on the Dombóvári St. Luke's Hospital Department of Local cellar-new wing of the reconstruction of the St. Luke's Hospital Dombóvári waterworks

Dombóvári Szent Lukács Kórház | Published August 19, 2015
Winner
HC Építő Kft.
cpvs
45453100, 45232151, 45262690, 45262700, 45310000, 45331000, 45232411, 45320000, 45321000, 45247130, 39100000, 45252126, 45232430

Who is the investment, SIOP-2.2.6-12 / ID No. 1B-2013-0017 project entitled "Development of infrastructure Dombóvári St. Luke's Hospital" must be implemented in accordance with the grant agreement be maintained. Technical Content: A detailed description of the work to be performed and the following quantities of documents annexed to the tender documents include the 4292-12 / 2014 registration number of the building permit and detailed design documentation as well as the customer's requirements. The Dombóvári St. Luke's Hospital Division, New Pincehelyi-wing reconstruction: reconstruction of affected floor space in total: 786.04 m2 and the conversion rate of expansion: The building's original purpose - in-patient care - will not change. Only reconstruction of the "new" -szárny made to the planned refurbishment of the main building was not affected. • The "new" -szárny reconstruction of the 39-bed nursing department will be located - level as a twenty (or 19) bed care unit - design. The facade windows size, the appearance of the new structure, needs to be adjusted. The outdated structures should be professional, mechanical and electrical networks are replaced, the building of thermo-technical regulations in force must be assimilated. The covers, cradles must be taken consistently in the field of renovation. The concrete base and topping usually preserved, except along the façade (ground floor), a wet room and under the new partitions, mechanical wiring trace, the cellar ceilings and floor raised floor sections of the substrate must be removed due to the operating room. Due to the thermal insulation of plinth - an already sank in bad condition - sidewalks around the building to be demolished. Will be demolished, two unused chimney outside the body for the building. The functional design of the wing: On the floor of a room on the ground floor two water blocks barrier-free design. Server functions: testing, kitchenette, staff and visitors toilet, a sideboard and an office on the second floor and the laundry collector. On every floor design of the nursing units is done by converting existing premises. Near the entrance is a double room nurse and nurse working station. The east side of the area using the service areas made four double komfortosított infirmary, near the nurses' station ágytálmosóval. On the ground floor of the laboratory, the floor area of ​​physical therapy and unused operating level will be established as the kitchen and the serving of the investigators and the staff can stay. Accessibility: The basic services: inpatient services, inspection rooms are barrier-free access. Design Handicap Parking establish Accessible pedestrian routes Main entrance barrier-free design some sick room, investigators barrier-free design develop developing Handicap sanitary facilities, shower IT and communication systems Interior architecture: Bidder task of the built-in furniture, flooring, to establish harmonized ceilings of industry-specific plans. The detailed design documentation - for information - the Mobilia (type furniture) are also included, they are not part of the quotation Contracting purchases under a separate procedure. Most of the built-in custom-made device, or a qualified health care system can be assembled furniture, installation, depending on the size of the additional elements unique local conditions. The custom-made furniture and accessories design quality and aesthetic appearance must be equivalent in all respects to the family of furniture elements. Structure: The slab will be additional burden due to the conversion and renovation. The main existing structural elements bear the burden of them can be used. During the renovations planned new openings in the building are made of the creation of new openings by placing steel beams happens. The building's foundation is here because of the burden of growth must be strengthened. The engineering reconstruction will require new breakthroughs floor. A cooling condenser owned subsidiary level roof placed over the main walls of the first floor was induced. The new roof is made between the old building and elevator shaft in the roof acélpillérei array funds. Engineering: water, sewage, heating, cooling, ventilation boiler automatic control of the existing building containing the offer. The HVAC distribution systems (heating, cooling, cold water, hot water, circulation, waste water) in the basement and the ground floor and upstairs hallway mounted in the ceiling. Heating and cooling: radiator heating Subordinated established areas. The systems

EH - 2015 maintenance and renovation works of the Budapest Business School, Faculty of Finance and Accounting buildings

Budapesti Gazdasági Főiskola | Published August 19, 2015
cpvs
45210000, 45350000, 45330000, 45430000

The Budapest Business School, Faculty of Finance and Accounting buildings maintenance and renovation works of the 2015 volume, which includes an option working parts of the budget is designated: 10-12. Canopy lighting modernization ceiling exchange 29,4m2 (8 LED light source placement, paint, ceiling construction, electrical installation), Front Roof waterproofing renovation (19,5m2), replacement of ceiling tiles (184db), Purity painting (159m2), A204 PC Interior Design (Purity painting, high and low voltage installation complete 29PC supply), the development of basement sanitary corridor doors of ventilation grille (3 pieces), replacing three pieces of fan coils (A22, A101, A101 / the halls), AA07 Office purity Painting (27,9m2 ), replacement of basement boiler room door (1pc door sensor, safety beam direction), replacement of basement hallway doors (set of 3), 10-12. Replacement of ceiling tiles (134db), Purity Skins (370,5m2), eliminate leaks staircase elszívónál (plumbers, paint repair 25m2) to improve noise protection wall Ferroli Air Handling Unit (metal support structures making 36fm, fiber cement reinforced with external cladding preparing 41m2, rock wool insulation board 8m2 , underlay 10m2, sheet metal covering 41m2, decorating 13m2), replacement of main shutoff manhole covers (1pc), strengthening of plasterboard walls (plasterboard 9m2, supporting structure 9fm, painting 18m2 ,, V. performing fire doors felfalazása (6,4m2 fireproof plasterboard wall construction, fire protection cuffs placement of 40dB, fire damper 5 pieces), Basement steel door replacement (1pc), replacement of exterior paving (excavation 9m2, lubricated seal 12m2, gravel ballast 7m3, geotextile 42m2, concrete pavement 42m2, vízelevezetés, V. artist - window insulation 4 ( Replacing soundproof rubber design of 10-12 Front Office offices 220m2 area (mechanical, electrical, low voltage, furniture, painting, tiling complete), PC4, PC5, PC6. - paved area beneath radiators exploration, heating piping insulation (painting, restoration 48fm steel black pipe replacement ), PC5, PC6 rooms - demolition, restoration (wood coverings demolition, preparation and painting new drywall covering 30m2), PC rooms windows of supply air installation (AERECO 43db), electrical distribution exchanging pre-PC4 room, B113, B113 / a, B114, B114 / renovation of the offices (demolition wood paneling, new housing production 127,7m2 painting, floor preparation of 20m2, szerelés195fm electrical conduit fittings 168, 6 isolator switch), replacement of ceiling tiles got 7), painting purity (98,9m2), B103 / b office renovation, new door design (radiator replacement, electrical installation, pavement repair, door replacement, opening preparation), B105 office refurbishment (electrical installation, pavement repairs 4m2, wardrobe demolition and preparation 1pc, plaster 6,9m2, painting 42,1m2), B107 office flooring Improving (6m2), B09 office door reversal of 10-12. Replacement Window (existing cornice demolition, new housing 87,6fm, painting), Venetian overhaul and repair (72db), Road metal columns of the painting of (54m2), replacement of basement door panels (2 pieces), replacement of ceiling tiles (86dB), Purity Skins (295 , 1m2), Gateway corridor roof insulation (of 28,7m2 roof insulation, metal wall connection 16,5fm, facade painting 14,9m2), repair of plastic windows exterior slats of 12 (1.8m), product purity Painting Training (C, D, E, 317,7m2 F), training rooms painting of metal structures (A, B, C, D, E, F, G, H 54,4m2) 10-12. Gym Painting (438m2), gym distribution box repair services (1pc), 2 gym door repair services (2 x door panel replacement, paint repair), replacement Gymnasium ventilation grille (move two gym ductwork, Dismantling speaker guard), replacing an existing gutter cover gym 2.5m height (covers replacement 1,4m2, 1,4m2 painting), gym flooring to improve border (5fm), Gym painting of heating pipeline (123,6fm), replacement of ceiling tiles in corridors and passage (129db), Purity painting corridors, staircases (136m2) Exit next to physical education department to install security lighting and outdoor lighting (set of 3), Gateway Corridor flat roof partially updated (98m2), Purity painting classrooms (238m2), replacement of ceiling tiles III. lecture hall (288db) 6-10. Sewer Replacement Cover (1 pc), Kuka Warehouses (5), 1-5 wrapping and painting. floor (30m2 PVC jacket, 53m2 painting), replacement of ceiling tiles in corridors (420db), urinals sewage disposal system for Reconstruction (Plasterboard covering 19m2, tiles 19m2, engineering works), Purity painting and decorating (hallways, students and student rooms) (3400m2 painting and decorating 200m2), Student Room (68) and a study room (8 x 2-5. floor) Renovation (PVC cladding production 1444m2), exchange Toilets
Categories
  Hungary - Show all countries
Budapest (197)Debrecen (16)Nyíregyháza (15)Szolnok (12)Békéscsaba (9)Miskolc (9)Szeged (9)Kecskemét (8)Révfülöp (8)Veszprém (8)Hévíz (7)Kisvárda (7)Kunszentmárton (7)Pécs (7)Baracs (6)Eger (6)Mezőkövesd (6)Salgótarján (6)Szombathely (6)Budapest (5)Dencsháza (5)Hatvan (5)Ibrány (5)Komló (5)Lenti (5)Szentendre (5)Székesfehérvár (5)Tabdi (5)Tiszavasvári (5)Bágyogszovát (4)Bükkösd (4)Cigánd (4)Füzér (4)Gyomaendrőd (4)Győr (4)Hódmezővásárhely (4)Kalocsa (4)Kaposvár (4)Keszthely (4)Mályinka (4)Nagyhegyes (4)Szentegát (4)Zalaegerszeg (4)Abony (3)Albertirsa (3)Baja (3)Berkesz (3)Bonyhád (3)Bánhorváti (3)Dombóvár (3)Dunakeszi (3)Edelény (3)Hajdúdorog (3)Kaba (3)Mohács (3)Méhtelek (3)Nagydobsza (3)Nógrád (3)Szekszárd (3)Sármellék (3)Tótkomlós (3)Verpelét (3)Zalacsány (3)Zákány (3)Ózd (3)Abaújszántó (2)Alsómocsolád (2)Aranyosapáti (2)Balatonmáriafürdő (2)Bocfölde (2)Bodrogkeresztúr (2)Bócsa (2)Cece (2)Csopak (2)Cégénydányád (2)Esztergom (2)Fehérgyarmat (2)Gávavencsellő (2)Hajdúböszörmény (2)Hajdúnánás (2)Hejőkeresztúr (2)Hortobágy (2)Isaszeg (2)Izsófalva (2)Juta (2)Jászberény (2)Kadarkút (2)Kapuvár (2)Kisharsány (2)Kiskunhalas (2)Kistarcsa (2)Kótaj (2)Lajosmizse (2)Maglód (2)Martonvásár (2)Mosonmagyaróvár (2)Nyírbátor (2)Orfű (2)Orosháza (2)