Public tenders for boiler in Szeged Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Boiler results

Szegedi Sport és Fürdők Kft. | Published September 23, 2015
Winner
Best Gáz Kft
cpvs
45259300

SZEGEDI Sports Hall BOILER-HOUSE RENOVATION OF TECHNOLOGY;

Update 2 Boiler site 2/2015 procurement process

Nevelési-Oktatási Intézmények Gazdasági Szolgálata | Published July 10, 2015
Winner
ENTA 2000 Szolgáltató Kft.;ENTA 2000 Szolgáltató Kft.
cpvs
45331110, 45350000

Part 1: NGSZ - Production of Deák Ferenc High School site licensing plan • Gas boiler • reinforced insulation of 1.5 m3 of raw steel wires • Painting 77 m and 6.74 m2 • storm water against 6 m2 • Electrical wiring • 1 set of heating wire Thermal insulation of 112 m + 3.5 m2 • Pipeline Breakdown 82 m • heating pipe installation demolition of 95 m • modular boiler decommissioning 12 • Pumps 4 • Installation of flanged fittings Installation 6 • threaded fittings with 11 • 1000-liter hot water tank installation of 1 • Installation of 80-liter expansion vessel assembly 2 • of hydraulic equipment 1 • 560 kW gas boiler gas burner assemblies, automatically inserts 2 • Pump Installation 5 • boiler tuning Building 1 • exhaust system 2 • old chimneys Demolition of the roof bejavításával 12 • the operator - at least 2 - Education Part 2: NGSZ - Production of Jerney John's Primary School site licensing plan • Gas boiler • reinforced base • Disconnect electrical wiring to 0.6 m3 furnace • 1 set of 6 pieces • gas boiler breakdown disassembly 1 • pumps 2 • Installation of flanged valve assembly 42 • threaded fitting 12 • 750 liter hot water tank installation of equipment 1 • 105 kW gas boiler automatic 6 • Pump Installation 4 • boiler tuning • 1 build flue gas cascade • 1 operating personnel - a minimum of 2 people - education

Szeged, Knight Street. No. 1. building service equipment maintenance during heat

Szeged Megyei Jogú Város Polgármesteri Hivatal | Published October 10, 2014
Winner
ENTA 2000 Szolgáltató Kft.
cpvs
50000000

Subject: "Szeged, Knight Street. No. 1. heat supply systems in buildings under maintenance "contractor must perform the contractual obligations of 48 months from the award of the contract within the framework of a lump sum contract for services. Contractor, the following tasks shall be to: - the building heat supply facilities - 6 AF 105 Type H, 120 kW FÉG made gázkazán- a month, according to the standards maintenance - Operation of Boilers 24-hour boiler heating and repair background - Ad hoc malfunctions, troubleshoot, repair and installation of the repaired equipment failures. The unique central boiler (radiator) heating and air handling systems to ensure the proper water temperature.

The modernization of the Szeged Jewish Community of Charity Home, SIOP-3.4.2-11 / 1-2012-0105

Szegedi Zsidó Hitközség | Published June 5, 2015
Winner
Eurolevel Építőipari Kereskedelmi és Szolgáltató Kft.
cpvs
45200000

Modernization of Szeged Jewish Community of Charity Home, SIOP-3.4.2-11 / 1-2012-0105. Design 1 barrier-free WC, kitchen renovation, upgrading heating systems 2 gas boiler installation, replacement of flooring and renovation (259.2 m 2), replacement of ceilings, the rooms cleanliness paint, visual accessibility and modernization of the façade windows and the exchange of technical documentation for detailed According.

Contract amendment - Garden City Catholic Primary School and Nursery energy modernization

Szeged-Csanádi Egyházmegye | Published April 15, 2015
Winner
FEHÉRÉP Építőipari Fővállalkozó Kft.
cpvs
45223800, 45350000, 45421100, 71356400

Under the Garden City Catholic Primary School energetic updating of project completion design and construction workload: 99 window replacement installation 4 door replacement solar system 10,8kW engineering modernization (TRV equipment, upgrading domestic hot water system) design as well as the Garden City Catholic Kindergarten in respect of subsequent facade insulation 245 +402 m2 and 10 cm thick EPS sel flat roof insulation 1350 m2 and 43 pieces of replacement windows installed 12 pieces of engineering modernization door replacement (replacement boiler, building control authority, upgrading domestic hot water system) 11 kW photovoltaic system 2x2,5 m2 selective flat-plate collector

Szeged, Nursing Home in advanced building energy modernization, preparation of construction plans in connection with the related EEOP 2014-4.10.0 / F identification number project

Szeged Megyei Jogú Város Önkormányzata | Published December 12, 2014
Winner
Sebéptech Építőipari és Kereskedelmi Kft.
cpvs
45210000

,, Szeged, Nursing Home in advanced building energy modernization, preparation of construction plans in connection with the related EEOP 2014-4.10.0 / F identification number project "Winning bidder plans to export 6 pieces of printed paper copies and 2 electronic copies ( CD or DVD) is required to prepare. The main specifications of facilities, major amounts: Windows: 467 pcs, 625.23 m2 Heating system: 2 + condensing boiler pumps, fittings. Headed by thermostatically radiator valves allow installation of temperature control in each room allows. Solar system (DHW heating Boost +): 20 solar, thermal insulation 47 m2: 1002 m2 Roof Insulation: 555 m2 The detailed technical data included in the technical documentation and unpriced budget. Total Estimated value excluding VAT: 113 020 000 HUF Estimated value of construction work: 112,240,000 HUF Estimate for the detailed design work: 780,000 HUF

Other sources of energy supplies and distribution

Szegedi Sport és Fürdők Kft. | Published March 12, 2015
Winner
Geotermikus Szolgáltató Kft.
cpvs
65400000

2. Object and amount of purchases, "Geothermal heat energy to obtain the" max claimed Szeged Sports and Spas Ltd.. winter heat output: 1,500 kW (measured on the primary side of the heat exchanger) Hire-purchase and service periods of the year: the official heating period: 15 October each year to the next year April 15-Ig (the draft contract will be determined by the pre-heating, or the. post-heating periods exact dates framework - with the other members kaszkádköri) In addition, thermal coolant service will not be. 10,993 GJ / heating season -40% means the applicable amount of heat energy - the heating season you want to buy. Sports Hall boiler house as the first cascade Újszeged geothermal heat consuming thermal center (boiler house) measured the minimum required on the primary side circuit heat exchanger thermal heating water temperature + 90 ° C ± 2 ° C, thermal energy inspection control: the so-called automatic. In VT (return) field thermal secondary side heat exchangers heating water return to pre-heating. The natural gas-fueled boilers are carried out in the system (secondary) power to regulate automatically. The primary side regulation of so-called thermal circuit. hőfoklefutási curves based models, called the Sports Hall. + 90ºC rate is holding control, the geothermal system parameters for each heat consumer users of "on-line" process access to the service web interface for each heat consumers user name and login password provides (heat meters, heating water temperature, mass flow, pressure etc.). The take of thermal energy and the thermal control system, respectively. electricity consumption meter certified by MKEH happen. Other technical parameters and specifications include attached as part of the technical documentation permits, plans, specifications.

The 6800 John Calvin Square No. 4 real energy modernization - contract modification

Csongrád Megyei Kormányhivatal | Published September 23, 2015
Winner
Építészmester Zrt.
cpvs
45000000, 19000000, 45453100, 45350000, 45310000, 45321000

Without 140m2 facade insulation thickness of 10 cm Dryvit system, polystyrene, plastered surfaces, painting: window replacement (wood doors, wood windows) 237 m2 of facade insulation thickness of 10 cm Dryvit system, polystyrene, painted surface 144m2 on the inner side of foam sand-lime brick insulation 10 cm thickness: 862m2 Front frame racks, metal keretvázból, each level pallóterítéssel, rails, foot board: 710 m2 plinth walls block injection or wall blade cuts Waterproofing: 95m3 attic ceiling insulation of fiber insulation with 20 cm thickness: 610 m2 Basement Ceiling thermal insulation glued and dűbelezett of solid mineral wool boards, plastered surfaces 10 cm thickness: Development of 185m2 substation condensing gas-fueled boiler with 1 line fan coil system building: 37 pieces plate radiator placement: 19dB outdoor compact chiller installation: 1 substation design: one set of lighting modernization, replacement of lighting fixtures: building 262 solar system: 7 28 kW photovoltaic system, solar panel pc 250Wos monoristályos, 1 IGPlus 70 Fronius inverter V2 Energy renovation: John Calvin space below the existing number 4 locally protected building energy renovation of public institutions (Id .: 5298)

indicative of the results of the process - the CSMKH 6800, No. 4 John Calvin space of real energy modernization under the EEOP -5.6.0 / 12-2013-0004 CODES projec

Csongrád Megyei Kormányhivatal | Published March 20, 2015
Winner
Építészmester Tervező és Kivitelező Zrt.
cpvs
45000000, 45310000, 45453100, 45350000, 45321000

- Replacement windows (wood doors, wood - window): 237 m2 - 10 cm thick thermal insulation Dryvit system, polystyrene, painted surfaces - without thermal insulation thickness of 10 cm Dryvit system, polystyrene, plastered surfaces, painting 140m2: 144m2 - Internal side foam sand-lime brick insulation 10 cm thickness: 862m2 - Front frame racks, metal keretvázból, condominium pallóterítéssel, rail, foot board: 710 m2 - plinth walls block injection or wall blade cuts Waterproofing: 95m3 - Attic Ceiling insulation of fibrous insulation material 20 cm thickness: 610 m2 - Basement ceiling insulation of glued and dűbelezett of solid rock wool plates, plastered surface 10 cm thickness: 185m2 - Develop substation condensing gas-fueled boiler with 1 item - fan-coil system building: 37 pieces - plate radiator placement: 19dB - outdoor compact chiller installation: 1 - substation design: one set - lighting modernization, replacement of lighting fixtures: 262 - Building a solar system: 7 kW photovoltaic system 28 x 250W monoristályos solar panel, 1 Fronius IG Plus 70 V-2 Inverter Energy renovation: John Calvin space existing public institutions locally protected under number 4 building energy renovation (Id .: 5298)

Art Workshop on development of information under the ÉMOP-2.1.1 / 14-2014-0001 F-2 project identification number of contract amendments

Szegi Község Önkormányzata | Published September 28, 2015
Winner
Villa Deco Kft.
cpvs
45210000, 45261920, 45223300, 45262520, 45262650

North side clearance is not required, south side garden 6.00 m depth compliance with the 30% coverage area and opportunities will be developed taking into account the buildings. Behind the existing farm buildings were built and installed on the north side warehouse building will be constructed on property installation. The courtyard between the two buildings is térburkolásra where parking spaces are also emerging. Overall dimensions of the warehouse building: 7.75 mx 23.29 m. The building is based on a traditional structure as a side yard full length porch. External traits of typical rustic design this building. Ceilings covered with wood from the top floor (attic peasants), consisting cathedral roof, hipped structure. The entrance to the building in the middle of the tract is where the reception will also get accepted. The building will be constructed three exhibition space, where local values ​​will form an exhibition showcase. Here you will be located boglyakemence also a fireplace with a fire background can be fed from the front desk. Behind the reception desk will be located in a storage room cleaning products. Building on both the back end of the building of caring heating boiler room will be located. The existing building is another reforming and expanding the need to create a social block. Here you will be located on the FF's and women's toilet + shower and storage solution suitable for bicycles. Both buildings will be wood-beamed ceiling, which is necessary to cover a 36-degree pitch structure. The roof is hipped basis on which red brick tile is fitted. Planned doors and windows insulated wooden structure. Facade painted off-white finish made of silicate. The internal coatings applied: stoneware pottery. The building is surrounded by pavement paving sidewalk and courtyard made. A detailed technical description of the document and its annex contains forms (detailed design documentation).

The design of the subject Szegi Art Workshop under the ÉMOP-2.1.1 / Project ID No. 14-2014-0001 F-contract modification procedure

Szegi Község Önkormányzata | Published October 9, 2015
Winner
Villa Deco Kft.
cpvs
45210000, 45261920, 45223300, 45262520, 45262650

North side clearance is not required, south side garden 6.00 m depth compliance with the 30% coverage area and opportunities will be developed taking into account the buildings. Behind the existing farm buildings were built and installed on the north side warehouse building will be constructed on property installation. The courtyard between the two buildings is térburkolásra where parking spaces are also emerging. Overall dimensions of the warehouse building: 7.75 mx 23.29 m. The building is based on a traditional structure as a side yard full length porch. External traits of typical rustic design this building. Ceilings covered with wood from the top floor (attic peasants), consisting cathedral roof, hipped structure. The entrance to the building in the middle of the tract is where the reception will also get accepted. The building will be constructed three exhibition space, where local values ​​will form an exhibition showcase. Here you will be located boglyakemence also a fireplace with a fire background can be fed from the front desk. Behind the reception desk will be located in a storage room cleaning products. Building on both the back end of the building of caring heating boiler room will be located. The existing building is another reforming and expanding the need to create a social block. Here you will be located on the FF's and women's toilet + shower and storage solution suitable for bicycles. Both buildings will be wood-beamed ceiling, which is necessary to cover a 36-degree pitch structure. The roof is hipped basis on which red brick tile is fitted. Planned doors and windows insulated wooden structure. Facade painted off-white finish made of silicate. The internal coatings applied: stoneware pottery. The building is surrounded by pavement paving sidewalk and courtyard made.

"TOP 4.6.0-14-2014-0001 the identification number of a contract" with pool port infrastructure development "project called related construction works carried out in Annex II."

Alsó-Tisza-vidéki Vízügyi Igazgatóság (ATIVIZIG) | Published March 25, 2015
Winner
DT Geotransz Bt.
cpvs
45000000, 45213316, 45233228, 45260000, 45443000, 45350000, 45421132, 45421146, 45442100, 45421152, 45442120, 45310000, 45231300, 45331110

The object of the procurement: works. CPV code (s): Construction work 45000000-7. Construction of sidewalks 45213316-1 45233228-3 45260000-7 Paving Construction Roof works and other special trade construction works 45443000-4 45350000-5 Facade work Mechanical installations. 45421132-8 Installation window. Installing care placement with 45442100-8 45421152-4 Partition Structures Painting 45442120-4 45231300-8 Painting and protective coating for water and sewage pipelines Electrical installation work 45310000-3 45331110-0 45421146-9 Boiler installation of suspended ceilings. The subject of this procurement procedure: TOP 4.6.0-14-2014-0001 "with pool port infrastructure development 'identification numbers to carry out construction work related to a project called II. The works shall be carried out in accordance with the technical documentation to be issued as part of the documentation. The main parameters, and the volume of production: 02196/4) to carry out tasks related to the development of the basic infrastructure: • Preparation of As-built design documentation • Ruined berm restoration: Inside the Ship Base premises of 35 meters of length injured shoulder surface, cover restoration, and this section has been damaged during continuous use The original design of the state variance stone plinth as insurance artificial beach. • Restoration KMZ cover: this covers around the harbor basin on pavement damaged during torrential rainfall over the rézsűkön water effect and to record the berthing barges, which are designed to restore 1725 m2 surface. • Road and pavement restoration: roads and pavements within the site's condition significantly deteriorated during the use of the past three decades, this restoration of damaged concrete surfaces, therefore, designed around 6651 m2 range. The base building with pool Harbor shipping partial restoration of the construction-related tasks: • Preparation of As-built design documentation • Roofing, building structures in poor condition tinker corrugated roofing should be removed and a new roof covering should be designed in accordance with the tender documents be maintained. • External facades, concrete footings damaged base cement mortar and plaster down to beat a fresh cement mortar is applied to plaster. • Doors and windows, new ceilings, new interior bulkhead bounding new modern, insulated wooden entrance doors and windows are built in their place. • sockets, socket covers, tile covers the entire floor housing building blocks should be removed in the original protective seal the top plane of concrete and new jack cover is needed. • Interior paint, doors and wooden structures painting of the water and gas pipes inside the walls painted to color match the color required. • Water sewage system, water fixtures and fittings of the wastewater drain system within the building should be built partly after the demolition of old again. • Building electrical, low voltage systems, lightning and climate system in addition to the new sanitary sewer plastic wall mounted electric network, rézerű cables to be built, wall-mounted electrical fittings, light fittings. • heating system and hot water supply of the two existing kitchen, gas stove disrepair are demolished, the installation of new gas stove in the kitchenette. Sidewalk around • Building coverings, entrance gates, fences, lighting, electrical switchboards After the necessary ground work (excavation, mirror work) 10 cm gravel ballast 8 cm thick concrete pavement is equivalent to the old track. Detailed technical specifications in the tender documentation. Bidder shall attach to the tender notice, priced unpriced budget is being released in the tender documentation. Contractor shall also submit a plan of organization, a professional by branches, at least a weekly schedule line, a financial roadmap, with particular regard to the fact that during the term of the building work is carried out continuously within 5 working days of its conclusion. Bidders are required to consider the following technical background information on the site layout plan and the financial schedule when compiling - Overwork questions (in consultation with local guide) - Winter period to take into account - account of the heating season - to work next to a working office - Schedule premises flushes, groups provide - the completion deadline importance of keeping 23.) 26 Govt..
  • 1