"Local governments and their institutions to develop building energy combined with renewable energy sources in the region of convergence" Tájékoztató- Harkakötöny EEOP 2014-4.10.0 / F coded scope of the project was to carry out construction works construction

Harkakötöny Község Önkormányzata | Published October 10, 2014
Winner
PANNONPRO Kft. és EVO-KOMPLEX Kft. közös ajánlattevők
cpvs
45310000

Harkakötöny Municipality "building energy development institutions and local governments combined with renewable energy sources in the region of convergence" EEOP 2014-4.10.0 / F-coded construction completion of construction within the framework of the proposals submitted for tender by facility operations. Building Facade insulation Attic insulation Roof insulation window replacement Door replacement Engineering Biomass boiler Solar Elementary School 520 m2 550 m2 25 m2 44 x 9 x thermostatic valves so no Nursery 260 m2 to 200 m2 84 m2 20 5 condensing boiler + thermostatic valves are 58 x 250 A panel + inverter EHE-N12KTL nursing home is 210 m2 190 m2 - 11 x 3 + condensing boiler with thermostatic valves are 20 V x 250 panel + inverter N5KTL EHE-quantitative values ​​are given in the detailed description of the technical and unpriced the budget proposals.

II. Rákóczi Catholic Secondary School Modernisation of energy - szerz.mód

II. Rákóczi Ferenc Katolikus Mezőgazdasági, Közgazdasági, Informatikai Szakközépiskola és Gimnázium | Published December 18, 2015
Winner
MERKBAU Építőipari és Kereskedelmi Kft.
cpvs
45261400, 45350000, 45315000, 09331000, 71356400

Subject: Enterprise Contract II. Rákóczi Catholic Secondary School energetic modernization of the subject of Volume: implementation plans: Boiler room heater construction design of boiler house's gas supply plan by the gas supplier jóváhagyatva 2388 + build 482 m2 facade insulation systems to build 252 m2 plinth insulation build 327 m2 of thermal insulation of windows and doors around 623 + 157 + 52 m2 building slab insulation construction of 157 meter facade decorative profiles 124 meter drainage channel complete breakdown, to build the necessary toldásokkal 205 window replacement plastic insulated glazed windows with 4 doors replacement plastic insulated glazed doors 308 m armrest placement, window sills design 2 set out in the budget performance condensing boiler installation Development of fittings and removal of flue gas hot water in the budget system technical content specified in the budget in accordance with the incorporation building heating control system Photovoltaic Modules 23 kVA beépítetett matched the apparent power of at least 60 cell, at least 4 Wp / cell power density photovoltaic modules polycrystalline technology, connections, support structure, control, Advanced inverter technology content and amounts in the accompanying documentation unpriced budget.