Public tenders for boiler in Kalocsa Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Contract amendment - St Joseph's Catholic Primary School and Kindergarten, Kindergarten energy modernization Lomb street Tag

Kalocsa - Kecskeméti Főegyházmegye | Published November 5, 2015
Winner
MERKBAU Építőipari és Kereskedelmi Kft.
cpvs
45350000, 45261400, 45315000, 71356400, 09331000, 09331100

Subject: a contract of St Joseph's Catholic Primary School and Kindergarten, Kindergarten Lomb street Tag subject of energy modernization Quantity: implementation plans: Boiler room construction design of heating, boiler heating gas supply plan jóváhagyatva by the gas supplier. 490 m2 building facade thermal insulation system building 56 m2 skirting 63.6 m2 of thermal insulation around doors and windows to build 525 m2 roof insulation 43 pieces of plastic insulated glazed window replacement window Ug = 1.1 W / m2K, Rw = 32 dB 11 pieces of plastic insulated door replacement doors Ug = 1.1 W / m2K, Rw = 32 dB 71 meter placement sills, creating a window sill installation of Photovoltaic Modules 2 kVA matched beépítetett apparent power for at least 60 cell, at least 4 Wp / cell power density, polycrystalline technology, connectors, controls, inverters 2 fittings and removal of flue gas hot water in the budget to fit 26 pieces 2x kW condensing boiler system development, build solar 2.5 m2 absorber surface area required for construction of 2 x 400 liter heat exchanger consisting of hot water storage tank with recirculating system Making the boiler replacement approved by the gas supplier Gas Plan. The renovation work during the continuous operation of the building must be carried out under normal use. Detailed technical content and amounts in the accompanying documentation unpriced budget.

Information on the outcome of the proceedings - St Joseph's Catholic Primary School and Nursery, Kindergarten energy modernization Lomb street Members

Kalocsa - Kecskeméti Főegyházmegye | Published March 11, 2015
Winner
MERKBAU Építőipari és Kereskedelmi Kft.
cpvs
45350000, 45261400, 45315000, 71356400, 09331000, 09331100

Subject: a contract to St Joseph's Catholic Primary School and Nursery, Kindergarten Lomb street Members subject of energy modernization Quantity: implementation plans: Boiler house construction design of heating, boiler heating gas supply plan jóváhagyatva by the gas supplier. Building 490 m2 of thermal insulation building insulation 63.6 m2 56 m2 plinth insulation around windows and doors to build 43 525 m2 roof insulation pieces of plastic insulated replacement windows glazed window Ug = 1.1 W / m2K, Rw = 32 dB with 11 plastic insulated door replacement doors Ug = 1.1 W / m2K, Rw = 32 dB 71 meter placement sills, creating a window sill installation of Photovoltaic Modules 2 kVA matched beépítetett apparent power of at least 60 cells, at least four Wp / cell power density polycrystalline technology, connectors, controls, inverters 2 fittings and flue gas hot water in the budget to fit in 26 2x kW condensing boiler system development, build solar 2.5 m2 absorber surface area required for construction of 2 x 400 liter heat exchanger consisting of hot water storage tank with recirculating system preparation of the boiler replacement approved by the gas supplier and gas project. The renovation work during the continuous operation of the building, to be carried out under normal use. Detailed technical content and amounts in the accompanying documentation unpriced budget.

Tajer - St. Stephen High School

Kalocsa Város Önkormányzata | Published September 11, 2015
Winner
Vitruvius Építő Kft.
cpvs
45000000

A contract KEOP- 5.5.0 / A / 12-2013-0172 scope of the project "Building Energy Development Kalocsán" in St Stephen's High School (6300 Kalocsa, Hunyadi János u 23-25, u.. 353) building energy refurbishment works of reconstruction of external doors and windows : 1st / monuments table structures: 2 156 pcs / new-style structures: 100 Loft insulation: 1557.2 m2 Scaffolding: 4 741.25 m2 demolition debris: 132,71 m3 Condensing gas boilers closed combustion chamber: 2 Boiler plant automatics: 1 PC
  • 1