Public tenders for boiler in Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Boiler results

Szegedi Sport és Fürdők Kft. | Published September 23, 2015
Winner
Best Gáz Kft
cpvs
45259300

SZEGEDI Sports Hall BOILER-HOUSE RENOVATION OF TECHNOLOGY;

Szeged, Széchenyi tér 9. buildings and boiler replacement boiler house renovation

Magyar Államkincstár | Published June 24, 2016
Winner
Orostherm Mérnökszolgálati és Szerelőipari Kft
cpvs
45000000

Szeged, Széchenyi tér 9. buildings and boiler replacement boiler house renovation

Eger, Eszterházy tér 5. boiler replacement and boiler house renovation

Magyar Államkincstár | Published July 25, 2016
Winner
CS-VGF-TERV Kft.
cpvs
45000000

Eger, Eszterházy tér 5. boiler replacement and boiler house renovation

Polyclinic gas boiler

Szent Lázár Megyei Kórház | Published March 10, 2017
Winner
CSE+E Épületgépészeti és Szolgáltató Kft
cpvs
45333000

Polyclinic gas boiler

Boiler installations

MVM Oroszlányi Erőműfejlesztő Zrt. | Published February 18, 2015  -  Deadline March 2, 2015
cpvs
42160000, 51135000

The proposed MVM Oroszlány Power Development Corporation. Site of a natural gas heating plant 3 12.5 MWth of heat capacity purchase of natural gas with a high water-plan hot water boilers through competitive tendering (periodically monitored boiler instrumentation, combustion equipment, heat licensee (ECO) protection with integrated boiler control technology, sound insulation, fully insulated) and additional services (transport, assembly management, installation, management, education together.

Boiler 2014 - results

Eötvös Loránd Tudományegyetem | Published September 10, 2014
Winner
Cothec Energetikai Üzemeltető Kft.;TIROTHERM Kft.;TIROTHERM Kft.;Cothec Energetikai Üzemeltető Kft.;Cothec Energetikai Üzemeltető Kft.;Cothec Energetikai Üzemeltető Kft.;SZETT Szentendrei Energetikai és Tüzeléstechnikai Kft.;Cothec Energetikai Üzemeltető Kft.
cpvs
50531100

Part 1: Eötvös Loránd Eötvös University Faculty of Law and GMF buildings (set of 3) maintenance of boiler houses. Part 2: Eötvös and practicing grammar schools (5) maintenance of boiler houses. Part 3: ELTE Pedagogikum buildings (of 4) maintenance of boiler houses. Part 4: ELTE University Library and Archives buildings or building ELTE GMF (of 4) maintenance of boiler houses. Part 5: 2 ELTE Botanical Garden site (Budapest and GOD) (7pcs) maintenance of boiler houses. Part 6: ELTE Szombathely Observatory (set of 3) maintenance of boiler houses. Part 7. Eötvös University dormitory building (8 pieces) maintenance of boiler houses. Part 8. Eötvös University Sports Centre (2p) maintenance of boiler houses. Quantity: Part 1: 3.600.000, - € + 8% Part 2: 9.000.000, - € + 8% Part 3: 7.500.000, - € + 8% Part 4. 3.000.000, - € + 8% Part 5: 2.500.000, - € + 8% Part 6: 500.000, - € + 8% Part 7: 22.000.000, - Euro + 8% Part 8: 600 000 EUR + 8%

installation of steam boiler

Szent Lázár Megyei Kórház | Published March 13, 2017
Winner
VASFA Szolnoki Kazángyártó Kft.
cpvs
45330000

installation of steam boiler

Boiler burner Purchase

Zala Megyei Szent Rafael Kórház | Published August 31, 2016
Winner
LÁNG-ELEKTRO Tüzeléstechnikai és Biztonságtechnikai Kft.
cpvs
42390000

Boiler burner Purchase

Biomass boiler - Békéscsaba

Szociális és Gyermekvédelmi Főigazgatóság | Published September 16, 2015
Winner
Dél-Konstrukt Zrt.
cpvs
45000000

It will be built new, pre-insulated district heating pipeline between the substation and the biomass boiler. Container biomass hot water boiler main equipment and features: Suitable for large as well as nitrogen and silicon content, low ash melting fanyesedékből made of hardwood woodchip burning is safe. • application of the increased size of the ash container allows the hamuürítést week. The boiler heating circuit pressure in order to store the return of around 1.5 bar safety valve built. • The heating pipe is to be incorporated in a water-presszosztátot pressure (pressure sensor) which switches off the minimum operating pressure minus 0.3 bar under pressure and prohibits operation of the boiler. • The boiler overheating of the drinking water supply pipe network is provided with a temperature sensor operated cooling water mixing valve is prevented. • The billet is heated with boilers in the boiler at night to ensure permanent protection monitoring, because this mode of protection afforded by the water pressure is not enough pressure switch. As a heat exchanger with built-in security equivalent technical solution. The main features of district-Line: • The size of conductors: 2xDN80 / 160 • Make Tube: pre-insulated pipeline system ISOPLUS. • Delivered medium: hot water temperatures stairs • Rated: 80/60 ° C • nominal pressure stage of the pipeline: 6 bar placed at number 59. The biomass boilers are detailed in the technical annex to the tender documents. Of the contract, which

Boiler - TEE

Pázmány Péter Katolikus Egyetem | Published July 29, 2015
Winner
RÁTŰZ-TECH Tüzeléstechnikai, Kereskedelmi és Szolgáltató Bt.
cpvs
50531100

The subject of the public procurement: The draft contract PPKE heating network to carry out maintenance work on the buildings as part of the documentation provided No. 2. document sent as an attachment to herein. The amount of purchases: the draft contract 20 boiler system with 6 site as part of the documentation provided No. 1. Table sent as an attachment to herein.

Biomass boiler - Magyarbánhegyes

Szociális és Gyermekvédelmi Főigazgatóság | Published September 16, 2015
cpvs
45000000

It will be built new, pre-insulated district heating pipeline between the substation and the biomass boiler. As part of the investment in the biomass central Magyarbánhegyes, Tanya institution under the number 37 placed in the courtyard fired boilers will replace the existing gas-fired district heating boilers and hot water heater delivers water through this new pipeline to the existing heating system networks. Container biomass hot water boiler main equipment and features: Suitable for large as well as nitrogen and silicon content, low ash melting fanyesedékből made of hardwood woodchip burning is safe. • application of the increased size of the ash container allows the hamuürítést week. The boiler heating circuit pressure in order to store the return of around 1.5 bar safety valve built. • The heating pipe is to be incorporated in a water-presszosztátot pressure (pressure sensor) which switches off the minimum operating pressure minus 0.3 bar under pressure and prohibits operation of the boiler. • The boiler overheating of the drinking water supply pipe network is provided with a temperature sensor operated cooling water mixing valve is prevented. • The billet is heated with boilers in the boiler at night to ensure permanent protection monitoring, because this mode of protection afforded by the water pressure is not enough pressure switch. As a heat exchanger with built-in security equivalent technical solution. The main features of district-Line: • The size of conductors: 2xDN50 / 140, 2xDN40 / 110, 2xDN25 / 90 • Make Tube: pre-insulated pipeline system ISOPLUS. • Delivered medium: hot water • Rated temperature step: 80/60 ° C • The wireless nominal pressure ratings: 6 bar • Heat source: Magyarbánhegyes placed under the Farm No 37 biomass boiler for the pipeline delivered to the heat The following institutional parts (buildings) and thermal centers found there to receive convert the heat (heating medium): - Yellow employers - employing pink - mental health building - laundry - kitchen, dining room - office-residential building - well-kept building

Biomass boiler - Mezőkovácsháza

Szociális és Gyermekvédelmi Főigazgatóság | Published September 11, 2015
cpvs
45000000

It will be built new, pre-insulated district heating pipeline between the substation and the biomass boiler. As part of the investment in the biomass central Mezőkovácsháza, institution placed under the Farm Number 36 courtyard-fired boilers will replace the existing gas-fired district heating boilers and hot water heater delivers water through this new pipeline to the existing heating system networks. Container biomass hot water boiler main equipment and features: Suitable for large as well as nitrogen and silicon content, low ash melting fanyesedékből made of hardwood woodchip burning is safe. • application of the increased size of the ash container allows the hamuürítést week. The boiler heating circuit pressure in order to store the return of around 1.5 bar safety valve built. • The heating pipe is to be incorporated in a water-presszosztátot pressure (pressure sensor) which switches off the minimum operating pressure minus 0.3 bar under pressure and prohibits operation of the boiler. • The boiler overheating of the drinking water supply pipe network is provided with a temperature sensor operated cooling water mixing valve is prevented. • The billet is heated with boilers in the boiler at night to ensure permanent protection monitoring, because this mode of protection afforded by the water pressure is not enough pressure switch. As a heat exchanger with built-in security equivalent technical solution. The main features of district-Line: • The size of conductors: 2xDN80 / 160, 2xDN50 / 140, 2xDN40 / 110, 2xDN25 / 90 • Make Tube: pre-insulated pipeline system ISOPLUS. • Delivered medium: hot water • Rated temperature step: 80/60 ° C • The wireless nominal pressure ratings: 6 bar • Heat source: Mezőkovácsháza placed under the Farm No. 36 biomass boiler for the pipeline delivered to the heat The following institutional parts (buildings) and thermal centers found there to receive convert the heat (heating medium): - Yellow employer - workshop - laundry - kitchen - office - hotel

Boiler room reconstruction - Achievement Guide

Bajcsy-Zsilinszky Kórház és Rendelőintézet | Published January 15, 2016
Winner
Andrásik 2001. Építőipari, Kereskedelmi és Szolgáltató Kft.
cpvs
45330000, 45331100, 45331110

Procurement subject: works on Bajcsy-Zsilinszky Hospital and Clinic Budapest XVII. Modernisation of the district clinic boiler room, on the documentation (technical description and unpriced budget) indicated below. Public procurement quantity: 1 x boiler room complete renovation of the documentation (technical description and unpriced budget) as detailed in

Biomass boiler II. - Magyarbánhegyes

Szociális és Gyermekvédelmi Főigazgatóság | Published September 16, 2015
Winner
Dél-Konstrukt Zrt.
cpvs
45000000

It will be built new, pre-insulated district heating pipeline between the substation and the biomass boiler. As part of the investment in the biomass central Magyarbánhegyes, Tanya institution under the number 37 placed in the courtyard fired boilers will replace the existing gas-fired district heating boilers and hot water heater delivers water through this new pipeline to the existing heating system networks. Container biomass hot water boiler main equipment and features: Suitable for large as well as nitrogen and silicon content, low ash melting fanyesedékből made of hardwood woodchip burning is safe. • application of the increased size of the ash container allows the hamuürítést week. The boiler heating circuit pressure in order to store the return of around 1.5 bar safety valve built. • The heating pipe is to be incorporated in a water-presszosztátot pressure (pressure sensor) which switches off the minimum operating pressure minus 0.3 bar under pressure and prohibits operation of the boiler. • The boiler overheating of the drinking water supply pipe network is provided with a temperature sensor operated cooling water mixing valve is prevented. • The billet is heated with boilers in the boiler at night to ensure permanent protection monitoring, because this mode of protection afforded by the water pressure is not enough pressure switch. As a heat exchanger with built-in security equivalent technical solution. The main features of district-Line: • The size of conductors: 2xDN50 / 140, 2xDN40 / 110, 2xDN25 / 90 • Make Tube: pre-insulated pipeline system ISOPLUS. • Delivered medium: hot water • Rated temperature step: 80/60 ° C • The wireless nominal pressure ratings: 6 bar • Heat source: Magyarbánhegyes placed under the Farm No 37 biomass boiler for the pipeline delivered to the heat The following institutional parts (buildings) and thermal centers found there to receive convert the heat (heating medium): - Yellow employers - employing pink - mental health building - laundry - kitchen, dining room - office-residential building - well-kept building.

II.kör biomass boiler - Mezőkovácsháza

Szociális és Gyermekvédelmi Főigazgatóság | Published September 11, 2015
Winner
Dél-Konstrukt Zrt.
cpvs
45000000

It will be built new, pre-insulated district heating pipeline between the substation and the biomass boiler. As part of the investment in the biomass central Mezőkovácsháza, institution placed under the Farm Number 36 courtyard-fired boilers will replace the existing gas-fired district heating boilers and hot water heater delivers water through this new pipeline to the existing heating system networks. Container biomass hot water boiler main equipment and features: Suitable for large as well as nitrogen and silicon content, low ash melting fanyesedékből made of hardwood woodchip burning is safe. • application of the increased size of the ash container allows the hamuürítést week. The boiler heating circuit pressure in order to store the return of around 1.5 bar safety valve built. • The heating pipe is to be incorporated in a water-presszosztátot pressure (pressure sensor) which switches off the minimum operating pressure minus 0.3 bar under pressure and prohibits operation of the boiler. • The boiler overheating of the drinking water supply pipe network is provided with a temperature sensor operated cooling water mixing valve is prevented. • The billet is heated with boilers in the boiler at night to ensure permanent protection monitoring, because this mode of protection afforded by the water pressure is not enough pressure switch. As a heat exchanger with built-in security equivalent technical solution. The main features of district-Line: • The size of conductors: 2xDN80 / 160, 2xDN50 / 140, 2xDN40 / 110, 2xDN25 / 90 • Make Tube: pre-insulated pipeline system ISOPLUS. • Delivered medium: hot water • Rated temperature step: 80/60 ° C • The wireless nominal pressure ratings: 6 bar • Heat source: Mezőkovácsháza placed under the Farm No. 36 biomass boiler for the pipeline delivered to the heat The following institutional parts (buildings) and thermal centers found there to receive convert the heat (heating medium): - Yellow employer - workshop - laundry - kitchen - office - hotel.

Boiler room renovations and replacing radiator valves institutions

Budafok-Tétény Budapest XXII. Kerület Önkormányzata | Published September 18, 2015
Winner
K-Láng Kft;K-Láng Kft;K-Láng Kft
cpvs
45453100, 44621200

Boiler room renovations and replacing radiator valves institutions Part 1: Otto Herman Primary School in the boiler house renovation Obsolete 3. Replacing the boiler Comfort II to acquisition of assets Part 2: Kozmutza Flora WHAT A boiler house of renewal, replacement radiator valves 2. Comfort II. and 1. Comfort III boiler replacement purchase of equipment 131 pieces. radiator valve replacement Part 3: Kempelen High School boiler room renovation of the outdated 4. ERKA Replacement SUPER 90 type boilers to acquisition of assets

"Obtaining industrial boiler / 2014."

Budapest Airport, Budapest Liszt Ferenc Nemzetközi Repülőtér Üzemeltető Zártkörűen Működő Részvénytársaság | Published August 23, 2014  -  Deadline September 22, 2014
cpvs
42160000

Delivery minimum of 12.5 MW hot water boilers, installation and maintenance during the warranty period. Budapest Airport Zrt. Kazánjaiból in the existing hot water heating plant is planning to replace two pieces. The new hot-water boilers each with a minimum of 12.50 MW, integrated flue gas heat licensee alternative fuel (natural gas, TU5 / 20 industrial fuel oil) burner, complete with automatic controls need to have. The original supplier is responsible for working with the necessary planning, permitting, transportation boiler, the boiler is installed and integrate with existing mechanical and electrical systems in a way that ensured continuous supply of heat to the airport, as well as maintenance and repair during the warranty period of the boilers. Bidder participation in this call megajánlhat compliance with the minimum requirements set out equivalent solutions. Contracting to purchase the subject matter of information only gives the following additional minimum technical requirements: - The nominal power is supplied to the boiler type with integrated flue gas heat licensee (ECO), a minimum of 12.5 MW (only equivalent, or more possible); - Integrated design condensing flue gas heat recovery (ECO) nominal capacity of the gas plant at 50 ° C for a return temperature: at least 400 kW (only equivalent, or more possible); - Combination boiler and combustion control minimum continuous power is available (for gas firing): Up to (<=) 20%; - Boiler and integrated flue gas heat recovery combined (ECO) is guaranteed combustion efficiency of gas-fired mode 100% and 50% under load (at 50 ° C return temperature): 100% for> = 96.5%, and 50%> = 97% . - Minimum return temperature entering the boiler stump: up to (<=) 60 ° c; - Boiler insulation thickness: minimum (> =) 120 mm;

Supply hot water boiler burners PTVM 50.

MVM MIFŰ Miskolci Fűtőerőmű Kft. | Published August 31, 2013  -  Deadline October 14, 2013
cpvs
42310000

Supply hot water boiler burners PTVM 50.

II. Case. Pediatrics for the purchase and installation of container boiler

Semmelweis Egyetem | Published September 8, 2014
Winner
AGRIHŐ Energia Kft.
cpvs
44621200

Subject: Customer care temporarily want to ensure the safety of the installation of container boiler 1 have performed, given the fact that in recent years a significant number of the existing work breakdown, the old boiler. The offered boiler maintenance during the warranty period, or improve. The expected performance of 1200 kW. The expected heating and DHW heat capacity together with 1.5 MW. Quantity: 1 container procurement technical specifications of the boiler, as well as other requirements included in the documentation provided by the contracting authority.

Black Stephen Elementary School in the boiler room renovation.

Budapest Főváros XXIII. Kerület Soroksár Önkormányzata | Published September 11, 2015
Winner
BOGÁRDI-BAU Kft.
cpvs
45262630, 45210000, 45331110, 45315100, 45350000

The subject of the public procurement: Black Stephen Elementary School in the boiler room renovation. The amount of purchases: City of Budapest XXIII. District XXIII Soroksár Budapest preparation of a Local Authority. 22 Birch Street district under Fekete István Primary School boiler house renovation of building export plans, the boiler intends to implement the framework contract for reconstruction.
Categories
  Hungary - Show all countries
Budapest (197)Debrecen (16)Nyíregyháza (15)Szolnok (12)Békéscsaba (9)Miskolc (9)Szeged (9)Kecskemét (8)Révfülöp (8)Veszprém (8)Hévíz (7)Kisvárda (7)Kunszentmárton (7)Pécs (7)Baracs (6)Eger (6)Mezőkövesd (6)Salgótarján (6)Szombathely (6)Budapest (5)Dencsháza (5)Hatvan (5)Ibrány (5)Komló (5)Lenti (5)Szentendre (5)Székesfehérvár (5)Tabdi (5)Tiszavasvári (5)Bágyogszovát (4)Bükkösd (4)Cigánd (4)Füzér (4)Gyomaendrőd (4)Győr (4)Hódmezővásárhely (4)Kalocsa (4)Kaposvár (4)Keszthely (4)Mályinka (4)Nagyhegyes (4)Szentegát (4)Zalaegerszeg (4)Abony (3)Albertirsa (3)Baja (3)Berkesz (3)Bonyhád (3)Bánhorváti (3)Dombóvár (3)Dunakeszi (3)Edelény (3)Hajdúdorog (3)Kaba (3)Mohács (3)Méhtelek (3)Nagydobsza (3)Nógrád (3)Szekszárd (3)Sármellék (3)Tótkomlós (3)Verpelét (3)Zalacsány (3)Zákány (3)Ózd (3)Abaújszántó (2)Alsómocsolád (2)Aranyosapáti (2)Balatonmáriafürdő (2)Bocfölde (2)Bodrogkeresztúr (2)Bócsa (2)Cece (2)Csopak (2)Cégénydányád (2)Esztergom (2)Fehérgyarmat (2)Gávavencsellő (2)Hajdúböszörmény (2)Hajdúnánás (2)Hejőkeresztúr (2)Hortobágy (2)Isaszeg (2)Izsófalva (2)Juta (2)Jászberény (2)Kadarkút (2)Kapuvár (2)Kisharsány (2)Kiskunhalas (2)Kistarcsa (2)Kótaj (2)Lajosmizse (2)Maglód (2)Martonvásár (2)Mosonmagyaróvár (2)Nyírbátor (2)Orfű (2)Orosháza (2)