Public tenders for boiler in Czech Republic

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyboilerCzech Republic

Boiler installations

Mikrobiologický ústav AV ČR, v.v.i. | Published March 7, 2013  -  Deadline April 30, 2013
cpvs
42160000, 44610000, 44611000, 45253600, 48151000

Boiler installations

Boiler installations

Mikrobiologický ústav AV ČR, v.v.i. | Published January 11, 2013
cpvs
42160000, 44610000, 44611000, 45253600, 48151000

Boiler installations

boiler installation work

Litovelská cukrovarna, a.s. | Published June 27, 2012  -  Deadline June 4, 2012
cpvs
42514300, 45251220, 45254200, 45331110, 51511400

boiler installation work

Boiler installation work

Litovelská cukrovarna a.s. | Published December 22, 2012
cpvs
42514300, 45251220, 45254200, 45331110, 51511400

Boiler installation work

OA and Hotel School - Reconstruction of boiler Kyjovská

Kraj Vysočina | Published August 7, 2013
cpvs

The newly established boiler for heating OA and HS Havlíčkovo Brod replace the existing central boiler. Boiler room for heating the school building will be located in one of the PP building, where currently the mouth of hot water pipes led from the existing boiler. In these places will be made necessary construction work, installation of the ventilation systems. In the room next to the boiler room will be located new indirectly heated boiler. Individual heating circuits are connected to the existing pipeline in the area of ​​the new boiler. Boiler room for heating buildings for accommodation will be located in one PP in accommodation in areas of existing boilers. In these places will be made necessary construction work, installation of the ventilation systems. Due to the steel structure beam ceiling must be done with new ceiling fire resistance. New ternary chimney will be conducted on the facade of the building, for his heel portion will be expanded existing English backyard. Manifold, individual controlled circuits and boilers for hot water will be placed in the boiler room. The outputs of the individual control nodes will be connected to the existing pipeline conducted under the ceiling 1 PP in the corridor outside the room and boiler room with a former distributor, which is adjacent to the new boiler. In all school buildings, existing radiator valves and taps on existing radiators replaced valves with presetting depending on the project. On the valves will be installed thermostats. Residential house standing in the school will be disconnected from the existing wiring, heating will be dealt with separately homeowners.

Boiler installations

Less & Energy s.r.o. | Published May 23, 2017
Winner
TTS eko s.r.o.
cpvs
42160000

The subject of the contract is the delivery of the equipment - a complete supply of hot-water boiler, including accessories related to the building modifications within the scope of the project of the Contracting Authority called "Lesser Timber Area, as Kotelna p. 537/1, k Dlouhá Ves u Sušice" For the construction of a boiler room incl. Heat pumps, connections (item 731 - boiler room, 732 - engine room, 733 - distribution pipeline, 734 - fittings) and boiler room technological equipment at Less & Timber, as in Dlouhá Ves, under the conditions stated in the tender documentation and its annexes.

The subject of the contract is the delivery of the equipment - a complete supply of hot-water boiler, including accessories related to the building modifications within the scope of the project of the Contracting Authority called "Lesser Timber Area, as Kotelna p. 537/1, k Dlouhá Ves u Sušice" For the construction of a boiler room incl. Heat pumps, connections (items 731 - boiler room, 732 - engine rooms, 733 - distribution pipes, 734 - fittings) and boiler room technological equipment at Less & Timber, as in Dlouhá Ves, under the conditions specified in the tender documentation and its annexes.

Boiler installations

Less & Energy s.r.o. | Published March 8, 2017  -  Deadline March 20, 2017
cpvs
42160000

The contract is the delivery of the equipment - complete supply of hot water boilers, including accessories related construction work under the project sponsor called "Campus firm Less & Timber, Inc., Boiler p. No. 537/1, k. Ú. Long Ves near Susice "the construction of the boiler room incl. hot pipes, connections (item 731 bills of quantities - boiler rooms, 732 - engine, 733 - Manifold, 734 - fittings) and technological equipment of boiler houses in the area Less & Timber, Inc. in Long Ves, under the conditions specified in the tender dossier and its annexes.

Boiler installations

Less & Energy s.r.o. | Published February 18, 2017  -  Deadline February 17, 2017
cpvs
42160000

The contract is the delivery of the equipment - complete supply of hot water boilers, including accessories related construction work under the project sponsor called "Campus firm Less & Timber, Inc., Boiler p. No. 537/1, k. Ú. Long Ves near Susice "the construction of the boiler room incl. hot pipes, connections (item 731 bills of quantities - boiler rooms, 732 - engine, 733 - Manifold, 734 - fittings) and technological equipment of boiler houses in the area Less & Timber, Inc. in Long Ves, under the conditions specified in the tender dossier and its annexes.

Boiler installations

Less & Energy s.r.o. | Published March 1, 2017  -  Deadline March 17, 2017
cpvs
42160000

The contract is the delivery of the equipment - complete supply of hot water boilers, including accessories related construction work under the project sponsor called "Campus firm Less & Timber, Inc., Boiler p. No. 537/1, k. Ú. Long Ves near Susice "the construction of the boiler room incl. hot pipes, connections (item 731 bills of quantities - boiler rooms, 732 - engine, 733 - Manifold, 734 - fittings) and technological equipment of boiler houses in the area Less & Timber, Inc. in Long Ves, under the conditions specified in the tender dossier and its annexes.

Boiler installations

Less & Energy s.r.o. | Published February 9, 2017  -  Deadline March 14, 2017
cpvs
42160000

The contract is the delivery of the equipment - complete supply of hot water boilers, including accessories related construction work under the project sponsor called "Campus firm Less & Timber, Inc., Boiler p. No. 537/1, k. Ú. Long Ves near Susice "the construction of the boiler room incl. hot pipes, connections (item 731 bills of quantities - boiler rooms, 732 - engine, 733 - Manifold, 734 - fittings) and technological equipment of boiler houses in the area Less & Timber, Inc. in Long Ves, under the conditions specified in the tender dossier and its annexes.

Reconstruction of boiler

Domov pro seniory Chodov | Published September 18, 2014
cpvs

The subject of the public contract is a contract for work on reconstruction of the technological part of the DS gas boiler room Chodov in scope and processed according to project documentation. The subject of the construction work is replacement of the existing boiler and machinery all technology related thereto, which are located in the basement home of seniors in block A1 (room boiler room, control room, engine room and the water treatment plant). Boilers, installed some 25 years ago, no longer meets its operational parameters, technical, environmental and economic demands required by current regulations. For these reasons, will replace them with new modern low-emission condensing boiler with the correct performance and lower power consumption.

Reconstruction of boiler

Domov pro seniory Chodov | Published March 12, 2014
cpvs

Replacement of boiler and machinery components according to their project documentation and related work.

OA and Hotel School Brod - reconstruction of boiler Kyjovská Street

Kraj Vysočina | Published May 21, 2014
cpvs

The boiler room for heating the school building will be located in one of the PP building in places where currently the mouth of hot water pipes led from the existing boiler room. Here are the necessary building modifications, the establishment of the supply and exhaust air. In the room next to the boiler room will be located new indirectly heated boiler. Individual heating circuits will be connected to existing pipelines in the area of ​​new boiler room. Flue pipe will be carried out over the roof. The boiler room for heating buildings for accommodation will be located in one PP in accommodation places in existing boilers. In these places will be made necessary construction work, the establishment of the supply and exhaust air. Due to the steel structure beams of the ceiling must be done with new ceiling fire resistance. The new stack will be conducted on the facade of a building for his heel portion will be expanded existing English backyard. Manifold, individual controlled circuits and boilers for hot water heating will be placed in the room boiler room. The outputs will be connected to the existing pipeline led ceiling first PP in space corridor outside the boiler room. For both boiler houses will be built new gas connection, connection for school building will have a turn to the existing pipeline to the gym. In all school buildings, existing radiator valves and taps on existing radiators valves replaced with options preset by the project. The valves are fitted with thermostats.

Boiler installation work

Teplo Rýmařov s.r.o. | Published February 11, 2017  -  Deadline February 26, 2017
cpvs
45331110

The subject of the tender is the total reconstruction of gas-fired hot water boiler room as a new hot-water heat source in an existing central heating plant town Rýmařov. Project documentation solves replacement of existing gas boilers for hot water for three new low-temperature gas boilers in existing boiler room. The subject of the reconstruction of the supply and installation of 3 pieces of gas-fired boilers with a total heat output Q = 4000 kW. K1 boiler is a gas condensing boiler with an output of 1.4 MW boiler K2 and K3 are low-temperature gas boiler economizer, each with an output of 1.3 MW. Output heating medium is hot water heating (TTV) rated thermal gradient of 90/70 ° C. With the transition to the hot operating adjustments are needed substations. This is a change in pressure independent hot water stations for pressure-dependent hot water.

Boiler installation work

Teplo Rýmařov s.r.o. | Published February 4, 2017  -  Deadline February 19, 2017
cpvs
45331110

The subject of the tender is the total reconstruction of gas-fired hot water boiler room as a new hot-water heat source in an existing central heating plant town Rýmařov. Project documentation solves replacement of existing gas boilers for hot water for three new low-temperature gas boilers in existing boiler room. The subject of the reconstruction of the supply and installation of 3 pieces of gas-fired boilers with a total heat output Q = 4000 kW. K1 boiler is a gas condensing boiler with an output of 1.4 MW boiler K2 and K3 are low-temperature gas boiler economizer, each with an output of 1.3 MW. Output heating medium is hot water heating (TTV) rated temperature gradient of 90/70 ° C. With the transition to the hot operating adjustments are needed substations. This is a change in pressure independent hot water stations for pressure-dependent hot water.

Boiler installation work

Teplo Rýmařov s.r.o. | Published December 21, 2016  -  Deadline January 19, 2017
cpvs
45331110

The subject of the tender is the total reconstruction of gas-fired hot water boiler room as a new hot-water heat source in an existing central heating plant town Rýmařov. Project documentation solves replacement of existing gas boilers for hot water for three new low-temperature gas boilers in existing boiler room. The subject of the reconstruction of the supply and installation of 3 pieces of gas-fired boilers with a total heat output Q = 4000 kW. K1 boiler is a gas condensing boiler with an output of 1.4 MW boiler K2 and K3 are low-temperature gas boiler economizer, each with an output of 1.3 MW. Output heating medium is hot water heating (TTV) rated thermal gradient of 90/70 ° C. With the transition to the hot operating adjustments are needed substations. This is a change in pressure independent hot water stations for pressure-dependent hot water.

Boiler installation work

Teplo Rýmařov s.r.o. | Published April 14, 2017
Winner
EVČ s.r.o.
cpvs
45331110

The subject of procurement is the total reconstruction of gas-fired hot water boiler room as a new hot-water heat source in the existing central heating plant of Rýmařov. Project documentation solves replacement of existing gas boilers for hot water for 3 (three) new low-temperature boilers in the existing boiler house. The reconstruction is the delivery and installation of three pieces of gas boilers with a total thermal power Q = 4000 kW. The boiler will K1 boiler with output of 1.4 MW boiler K2 and K3 are low temperature gas boiler with economizer each rated at 1.3 MW. Outlet heating medium is hot water heating (TTV) of a nominal temperature gradient of 90/70 ° C. With the transition to the hot operating adjustments are needed substations. This is a change in pressure independent hot water stations for pressure-dependent hot water.

The subject of procurement is the total reconstruction of gas-fired hot water boiler room as a new hot-water heat source in the existing central heating plant of Rýmařov. Project documentation solves replacement of existing gas boilers for hot water for 3 (three) new low-temperature boilers in the existing boiler house. The reconstruction is the delivery and installation of three pieces of gas boilers with a total thermal power Q = 4000 kW. The boiler will K1 boiler with output of 1.4 MW boiler K2 and K3 are low temperature gas boiler with economizer each rated at 1.3 MW. Outlet heating medium is hot water heating (TTV) of a nominal temperature gradient of 90/70 ° C. With the transition to the hot operating adjustments are needed substations. This is a change in pressure independent hot water stations for pressure-dependent hot ..

Vinařice - replacement gas boiler

Vězeňská služba České republiky | Published February 18, 2014
cpvs

The contract is the exchange of the existing hot water boiler type LOOS 3050 UT on power 2600 kW boiler room in existing prisons Vinařice. In place of the original boiler proposed location of the new hot-water boilers with the same rated power, including connection to existing pipelines, new control measurement and control system for the boiler and connection to the existing management system boiler and new water treatment plant.

District heating boiler

Město Nýrsko | Published October 25, 2017  -  Deadline November 27, 2017
cpvs
42515000

The subject of the public contract is the complete modernization of the central heating system (CZT) - the reconstruction (greening) of the existing brown coal boiler room (KHU). The distribution of the operating files is PS01 - Boiler Room HU and PS02 - Filter.

District heating boiler

Město Nýrsko | Published November 21, 2017  -  Deadline December 4, 2017
cpvs
42515000

The subject of the public contract is the complete modernization of the central heating system (CZT) - the reconstruction (greening) of the existing brown coal boiler room (KHU). The distribution of the operating files is PS01 - Boiler Room HU and PS02 - Filter.

Categories
  Czech Republic - Show all countries
Praha (117)Praha 4 (64)Prague (48)Olomouc (46)Praha 6 (42)Ostrava (39)Plzeň (37)Praha 5 (37)Praha 1 (36)Pardubice (35)Ústí nad labem (31)České budějovice (27)Brno (25)Horní beřkovice (22)Praha 3 (22)Hradec králové (20)Kralupy nad vltavou (19)Jihlava (18)Prague (18)Ostrava (16)Chvaletice (14)Hartmanice (14)Pardubice (14)Prostějov (13)Zlín (13)Blansko (12)Ostrava, moravská ostrava (12)Veselí nad lužnicí i (12)Hlinsko (11)Most (11)Pardubice 2 (11)Praha 2 (11)Příbram (11)Frýdlant nad ostravicí (10)Praha 4 - krč (10)Vsetín (10)Brandýs nad labem - stará boleslav (9)Bruntál (9)Bystřice (9)Cheb (9)Jablonec nad nisou (9)Most, komořany (9)Čáslav (9)Žatec (9)Jeseník (8)Čelákovice (8)Šenov (8)Boskovice (7)Budišov nad budišovkou (7)Dobříš (7)Liberec (7)Louny (7)Praha - stodůlky (7)Tachov (7)Chomutov (6)Hradec králové - nový hradec králové (6)Hradec nad moravicí (6)Jince (6)Jindřichův hradec (6)Koloveč (6)Nová ves (6)Ostrava - mariánské hory (6)Rokytnice v orlických horách (6)Třebíč (6)Velká bystřice (6)Vrchlabí (6)Čebín (6)Říčany (6)Broumov (5)Břidličná (5)Domažlice (5)Hranice (5)Ivanovice na hané (5)Kroměříž (5)Náchod (5)Ostrava-poruba (5)Poděbrady (5)Praha 7 (5)Praha 8 - karlín (5)Rudíkov (5)Stráž pod ralskem (5)Velký beranov (5)Šumperk (5)Železný brod (5)Břeclav (4)Chrastava (4)Chrudim (4)Duchcov (4)Hluboš (4)Horní újezd (4)Kladno (4)Kobeřice u brna (4)Kvasice (4)Liberec i - staré město (4)Nepomuk (4)Nýrsko (4)Němčice (4)Ochoz u brna (4)Ostrava - moravská ostrava (4)