Public tenders for boiler in Switzerland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyboilerSwitzerland

Energy Efficiency Vinnytsia Project Zulinskogo/Tarnogrodskogo wood boiler

Public Utility of Vinnytsia City Council «VinnytsiaMiskTeploEnergo» | Published August 25, 2016  -  Deadline September 29, 2016
cpvs

Energy Efficiency Vinnytsia Project Zulinskogo/Tarnogrodskogo wood boiler

Energy Efficiency Vinnytsia Project Zulinskogo/Tarnogrodskogo wood boiler

Public Utility of Vinnytsia City Council «VinnytsiaMiskTeploEnergo» | Published May 11, 2017  -  Deadline September 29, 2016
cpvs

Energy Efficiency Vinnytsia Project Zulinskogo/Tarnogrodskogo wood boiler

Energy Efficiency Vinnytsia Project Zulinskogo/Tarnogrodskogo wood boiler

Public Utility of Vinnytsia City Council «VinnytsiaMiskTeploEnergo» | Published July 28, 2016  -  Deadline September 22, 2016
cpvs
09323000

The scope of supply is: one new wood fired boiler with a total installed capacity of 3,3 MWt for Zulinskogo (Tarnogrodskogo) district and the auxiliary equipment, automation system and SCADA system

The Supplier shall perform the following associated services:
1.Elaboration of boiler house equipment layout design including foundation design and supply of the input data for the local civil designer.
2.Update and finalization of the P&ID diagram as per the equipment supplier in accordance with the technical requirements.
3.Erection of chimney.
4.Installation of the refractories in the furnace and electric filters installation.
5.Direction and supervision of all erection works performed directly by the purchaser. In particular, for the main components of the flue gas treatment, the ash handling and the fuel handling systems, instructed staff of the suppliers shall be present on site, if necessary.
6.Testing and commissioning of the wood fired boiler and auxiliary equipment according to the Requirements stated in the Tender Documents (ref. Vol.II, Section II, para.8).
7.Integration of the control system into the existing SCADA system and testing and commissioning of SCADA system equipment together with the SCADA supplier.
8.Training of the Purchaser’s operating staff.
9.Delivery of oil for hydraulic cylinders in the amount sufficient to provide start-up works and boiler commissioning.
The Contract includes equipment and materials delivery, start-up, commissioning and training of the Purchaser’s staff.
All the components, which are necessary for providing the required characteristics of the supplied equipment, shall be included within the scope of supply.

District heating boiler

Fernwärme Luzern AG | Published October 5, 2016  -  Deadline November 11, 2016
cpvs
42515000

1 or 2 pcs. Gas boiler systems 8 MWth

District heating boiler

Gemeindewerke Pfäffikon ZH | Published December 28, 2016  -  Deadline February 1, 2017
cpvs
42515000

Creation / delivery / installation of a Holzschnitzelkesselanalage (two-boiler system) with fuel transportation system and flue gas cleaning / ash removal.

boiler renewal L2

Nutec Engineering AG | Published March 31, 2017  -  Deadline May 17, 2017
cpvs
42160000

CPV: 42160000 - Boiler installations

Replacement wood chipping boiler WSP

Gemeindewerke Pfäffikon | Published April 28, 2017
cpvs

Replacement wood chipping boiler WSP

boiler renewal L2, firebricks

Nutec Engineering AG | Published March 31, 2017  -  Deadline May 17, 2017
cpvs
42160000

CPV: 42160000 - Boiler installations

District heating boiler

RWB Hydroconcept SÀRL | Published May 7, 2016  -  Deadline June 15, 2016
cpvs
42515000, 42160000, 44621200, 44621210, 50531100, 45331110

Supply, installation and commissioning of a wet wood combustion plant for a district heating plant. This includes transfer timber, boilers with ash removal and installation of filtration of the fumes. Participation in the validation of the technical details for implementing the market.

silo filling.

2 platelets silos, type "above ground" are each equipped with 2 screws distribution of platelets. These optimize the silo storage volume by spreading the pads to the end of the silo.

fuel supply.

Dessilage the timber is achieved by shifting funds 4 hydraulically driven. The timber is then transported in the boiler by means of a chain conveyor and distributed to each boiler.

Boilers.

Wood is burned in two boilers with powers of respectively 500 and 1000 kW. The boilers are suitable for green wood combustion and grate type and flue. Ash removal from the home as well as transportation of the ashes to a container automatically.

Filtration.

A multi-cyclone and a electrofiltration installation to ensure compliance with LRV standards of smoke contents are planned boiler output. The ashes of the installation of ash removal is automatically collected in a container.

Command.

boiler control boards manage the entire combustion process, from transportation to the filtration of the fumes. Only a curb and a boiler power signal is received by the regulation.

Reconstruction and renovation of the boiler of the KPA Oftringen

Nutec Engineering AG | Published June 13, 2014  -  Deadline September 10, 2014
cpvs
42160000

The scope of supply includes design changes to the side walls and on the front and rear wall of the water tube boiler of waste incineration plant Oftringen. Furthermore, a partial exchange of the right and left side wall is required. Extension of the boiler side walls: - Dismantling of the existing manifold on the side boiler walls - extension of the side walls by about 1 m up to the grate changes to the boiler front wall: - Dismantling of the existing ignition cover - introducing a new, prolonged ignition cover - Adjusting openings for secondary air nozzles - introducing new Rohrausbiegungen for Rezigasdüsen changes to the boiler back panel: - Remove existing Kesselausbiegungen - attaching new Kesselausbiegungen for secondary and Rezigasdüsen - making an opening in the Ausbranddecke changes to the side walls: - dismantling of both boiler sidewalls from Kote + 18,800 - installing new sidewall portions with Inconel Cladding - closing a 900 mm wide opening on Kote 13'900 by a piece of diaphragm wall

CFC 341 Supply of wood boiler

RWB Hydroconcept Sàrl | Published May 3, 2016  -  Deadline June 15, 2016
cpvs
42515000

Supply, installation and commissioning of a wet wood combustion plant for a district heating plant. This includes the transfer of the wood boiler with ash removal and installation of filtration fume Participation in the validation of technical details for contract performance
silo filling
The two plates elevators, type "above ground" are each equipped with two screw distribution of platelets. These optimize the silo storage volume by spreading the pads to the end of the silo
fuel supply
Dessilage the timber is achieved by shifting funds 4 hydraulically driven. The timber is then transported in the boiler by means of a chain conveyor and distributed to each boiler.
boilers
Wood is burned in two boilers with powers of respectively 500 and 1,000 kW. The boilers are suitable for green wood combustion and grate type and flue. Ash removal from the home as well as transportation of the ashes to a container automatically.
Filtration
A multi-cyclone and a electrofiltration installation to ensure compliance with LRV standards of smoke contents are planned boiler output. The ashes of the installation of ash removal is automatically collected in a container.
order
boiler control boards manage the entire combustion process, from transportation to the filtration of the fumes. Only a curb and a boiler power signal is received by the regulation.

Hydroelectric Development Vouvry - boiler work.

Service achats | Published March 2, 2016  -  Deadline April 6, 2016
cpvs
45240000, 45231110, 45000000, 45251120

This tender concerns the boiler works for the steel part of the new penstocks of 2 facilities.

Boiler work is divided into 3 parts of works:

House of the valve: Installation of a panty and a safety valve in the chamber of the valve.

Taney pipe: steel part of the new penstock Taney.

Fossau pipe: steel part of the new penstock of Fossau.

Supply and installation of a wood chip boiler system

Gemeindewerke Pfäffikon ZH | Published December 23, 2016  -  Deadline February 1, 2017
cpvs
42515000

CPV: 42515000 - District heating boiler

IWB, partial replacement boiler walls incineration line 2 KVA

Bau- und Verkehrsdepartement des Kantons Basel-Stadt, Kantonale Fachstelle für öffentliche Beschaffungen | Published April 5, 2017  -  Deadline February 15, 2017
cpvs

IWB, partial replacement boiler walls incineration line 2 KVA

Ship "Montreux" steam boiler superheater Replacement

CGN - service technique | Published November 22, 2016  -  Deadline October 21, 2016
cpvs

Ship "Montreux" steam boiler superheater Replacement

Adjustments central warehouse shear boiler, BKP 23 Electrical Installations

Bau- und Verkehrsdepartement des Kantons Basel-Stadt, Kantonale Fachstelle für öffentliche Beschaffungen | Published November 16, 2016  -  Deadline September 21, 2016
cpvs

Adjustments central warehouse shear boiler, BKP 23 Electrical Installations

2 wood burning boiler for wood chips, 1x 700kW, 800kW 1x

Technische Betriebe Glarus Süd | Published November 17, 2016  -  Deadline January 10, 2017
cpvs
42515000

CPV: 42515000 - District heating boiler,
44621200 - Boiler

KVA Basel: online boiler cleaning to extend the travel time

Bau- und Verkehrsdepartement des Kantons Basel-Stadt, Fachstelle für Submissionen | Published May 9, 2015  -  Deadline June 18, 2015
cpvs
50531100

We are looking for a service which can, by cleaning of the boiler surfaces ensure (by explosive gases or explosives) at the two heat recovery steam generators, while the operation of the plant that the annual travel time (about 8250h) is easily reached at 100% boiler output. This will be offered for the next four years, from August 2015 to and including 2018,.

Adjustments central warehouse shear boiler, BKP 214 Montagebau in wood

Bau- und Verkehrsdepartement des Kantons Basel-Stadt, Kantonale Fachstelle für öffentliche Beschaffungen | Published December 14, 2016  -  Deadline September 21, 2016
cpvs

Adjustments central warehouse shear boiler, BKP 214 Montagebau in wood

Adjustments central warehouse shear boiler, BKP 24 heating and ventilation systems

Bau- und Verkehrsdepartement des Kantons Basel-Stadt, Kantonale Fachstelle für öffentliche Beschaffungen | Published November 16, 2016  -  Deadline September 21, 2016
cpvs

Adjustments central warehouse shear boiler, BKP 24 heating and ventilation systems