Public tenders for boiler in Austria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Supply of sanitary material for warm water boiler at the Vienna International Centre, Austria

United Nations Industrial Development Organization | Published November 18, 2016
cpvs

The UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION (UNIDO) hereby invites you to submit your written bid for the supply of sanitary material for warm water boiler at the Vienna International Centre, Austria.

Sale of (district heating) power stations, especially based on biomass and boiler systems by Energiecomfort Energie- und Gebäudemanagement GmbH — Call for expressions of interest.

Energiecomfort Energie- und Gebäudemanagement GmbH | Published October 24, 2014  -  Deadline November 14, 2014
cpvs
09323000

Sale of (district heating) power stations, especially based on biomass and boiler systems by Energiecomfort Energie- und Gebäudemanagement GmbH Call for expressions of interest Energiecomfort Energie- und Gebäudemanagement GmbH (‘EC’), a 100 % subsidiary of Wien Energie GmbH and thus an indirect subsidiary of the city of Vienna, intends to sell by way of an open, structured, transparent and non-discriminatory bidding-process the following shares and/or assets, which may be acquired together or individually: (i) 50% participation in Ortswärme Oberstaufen GmbH & Co. KG as well as the acquisition of a 50% participation in the unlimited partner Ortswärme Oberstaufen Verwaltungs GmbH ("Ortswärme Oberstaufen") (ii) 50% participation in Ortswärme Seefeld GmbH (‘Ortswärme Seefeld’) (iii) 50% participation in PROCOMFORT GmbH (‘PROCOMFORT’) (iv) 100% participation in Ortswärme Tannheim GmbH (‘Ortswärme Tannheim’) (v) Ortswärme Grän (Biomass power station owned by EC as well as about 25 % participation in Ortswärme Grän GmbH) (‘Ortswärme Grän’) (vi) 5 boiler systems in the federal state of Tyrol (Völs, Telfs, Imst) and the assignment of the heat supply agreements relating to them as well as the assignment of 12 further heat supply agreements concerning boiler systems in the federal state of Tirol (Innsbruck, Wörgl, Sistrans, Imst). In Oberstaufen (Germany) Ortswärme Oberstaufen, a 50:50 Joint Venture of EC and the community Oberstaufen, operates a facility to supply customers in the area of the community Gemeinde Oberstaufen with district heating. The facility consists of an oil-fired boiler (in case of failure, 6 MW), and two biomass boilers (4 MW and 2.4 MW). The heat supply is based on the incineration of wood chips. An ORC plant with 742 kW together with photovoltaic panels with 154 kWp generates electricity. In the business year 2013, the Ortswärme Oberstaufen generated a turnover of EUR 3 350 000 and an EBITDA of EUR 1 339 000. In the community Seefeld the Ortswärme Seefeld, a 50:50 Joint Venture of EC and the community Seefeld, operates a facility to supply customers in the area of Seefeld with district heating on the basis of wood chips. The facility consists of two biomass boilers (5 MW and 3 MW) as well as two gas-fired boilers (each 6 MW). In the business year 2013, the Ortswärme Seefeld generated a turnover of EUR 3 138 000 and an EBITDA of EUR 862 000. PROCOMFORT, a 50:50 Joint Venture of EC and the Innsbrucker Kommunalbetriebe Aktiengesellschaft, supplies the department store Tyrol and adjoining buildings in Innsbruck with heat and cold. The facility consists of a heat pump (2.7 MW), a cold generator (2.7 MW) and a gas-fired boiler (2.9 MW). The cold supply is effected by the subterranean water of the river Inn, a second heat pump and an air cooled cold generator (2.7 MW). In the business year 2013, PROCOMFORT generated a turnover of EUR 788,000 and an EBITDA of EUR 323,000. Ortswärme Tannheim, a 100 % subsidiary of EC, owns a facility for district heating based on biomass, which is operated by EC on the basis of a business management agreement. The facility is based on the incineration of industrial- and forest wood chips, consisting of a biomass boiler (2.5 MW) as well as an oil-fired boiler (4 MW). In the business year 2013, the facility in Tannheim generated a turnover of EUR 957 000 and an EBITDA of EUR 318 000. It is currently planned to transfer the branch ‘Ortswärme Tannheim’ from EC to Ortswärme Tannheim GmbH before the closing of this selling process. The biomass plant for district heating on the basis of wood chips in the community Grän is owned by EC. EC operates the facility consisting of a biomass boiler (2.3 MW) as well as an oil-fired boiler (4 MW). The Ortswärme Grän GmbH is not an operating company. EC holds a shareholding of 25 % and the community of Grän holds a shareholding of 75 % in Ortswärme Grän GmbH. In the business year 2013, EC generated a turnover of EUR 786 000 and an EBITDA of EUR 264 000 with Ortswärme Grän. It is currently planned to transfer the branch ‘Ortswärme Grän’ from EC to Ortswärme Grän GmbH before the closing of this selling process. In the federal state Tyrol EC operates boiler systems on the basis of various heat supply agreements. 5 boiler systems are owned by EC. The remaining boiler systems are owned by the individual customers. EC offers the acquisition of its own boiler systems as well as the transfer of the heat supply agreements subject to the approval of the individual contract partners. Ernst & Young Corporate Finance GmbH (‘EY’) acts as an exclusive financial advisor for EC in this selling process. Expressions of interest relating to the participation in the selling process have to be addressed to EY. Written expressions of interest have to be handed in by the 14.11.2014, 12:00 CET at the address below. They must be written in German or English and state name and address of the interested party/ every member of the syndicate ("Interested Party"), the name of a contact person, as well as the name of a possible advisor. Furthermore, every expressions of interest has to entail sufficient information or a self-declaration stating that the Interested Party (i) fulfils no grounds for exclusion according to the EU directives and (ii) has sufficient funds, experience and the aim, to purchase and run a single or multiple offered shares or assets, if applicable within a syndicate of other interested parties. Interested Parties will receive a non-disclosure agreement upon request via email to the address below. Expressions of interest have to be handed in under one's own name and expenses. Open direct agency with a written letter of authority is allowed. After signing the non-disclosure agreement and a declaration by the Interested Party, Interested Parties which have been admitted to the bidding process will receive further information regarding the bidding process. EC reserves the right to limit the number of Interested Parties which will be admitted to the selling process in a non-discriminatory way. To this effect, EC will examine the expressions of interest based on the following criteria: (i) purchase price, (ii) ability to finance the acquisition and (iii) willingness and ability to close the transaction in a timely manner. EY reserves the right to define more precisely, correct or change the criteria for this structured bidding process at its sole discretion, to set out appropriate time limits or extend those limits, if needed, to terminate the bidding process partly or in total or to change the structure of the transaction. EC will use is sole discretion always in accordance with the principles of an open, transparent and non-discriminatory bidding process. Contact: Robert Hufnagel E-Mail: robert.hufnagel@ey.at.com Ernst & Young Corporate Finance GmbH Wagramer Straße 19, IZD Tower, 1220 Vienna, Austria Tel: +43 1211701031

Boiler installations

EVN Wärme GmbH | Published January 31, 2015  -  Deadline February 27, 2015
cpvs
42160000

Manufacture, supply and installation of 2 pcs gas boiler in hot water / steam version including jet burners and accessories in District Mödling.

Superheater and option for waste heat boiler for MVA Dürnrohr.

EVN Abfallverwertung Niederösterreich GmbH | Published February 19, 2016
cpvs
42160000, 42162000

Superheater and option for waste heat boiler for MVA Dürnrohr.

Boiler installations

EVN Wärme GmbH | Published December 22, 2015  -  Deadline January 15, 2016
cpvs
42160000

Construction of a boiler house with Hackgutkesseln with a district heating capacity of 500 kW to 1 000 kW with hydraulically operated sliding floor, electrostatic precipitator and automatic ash removal through the ashes Gosse and this over high ash conveyor into the ash container.

Boiler installations

EVN Wärme GesmbH | Published February 20, 2013  -  Deadline March 10, 2013
cpvs
42160000

:Es ist geplant 2 Stück der bestehenden Heißwasserkessel auszutauschen. Dazu wird die Fertigung, Lieferung und Montage von 2 Stück Gaskessel in Heißwasserausführung samt Gebläsebrenner (einer mit ECO), O2 Regelung, BOSB, Schalldämpfer, Brennerschaltschrank, Kesselpumpen und Regelventile ausgeschrieben sowie die hydraulische und elektrische Installation an die Bestandsanlage.

Boiler installations

EVN Wärme GesmbH | Published March 16, 2013
cpvs
42160000

:Errichtung von 1 Stück Biomasseheizkessel (4,8 MW) inkl. Schubboden, Tagesbunker, Rauchgasreinigung mittels E-Filter (im Freien) und Entaschungssystem geeignet für 10 m³-Mulden auf Schienen-Verschubsystem.

boiler installations

EVN Wärme GmbH | Published December 4, 2012
cpvs
42160000

:Errichtung von 1 Stück Biomasseheizkessel (4,8 MW) inkl. Schubboden, Tagesbunker, Rauchgasreinigung mittels E-Filter (im Freien) und Entaschungssystem geeignet fjür 10m³-Mulden auf Schienen-Verschubsystem. Gesamtfertigstellung:30.8.2013.

boiler installations

EVN Wärme GesmbH | Published October 27, 2012  -  Deadline November 22, 2012
cpvs
42160000

:Lieferung und Montage von 1 Stück Biomassekessel (10 MW Brennstoffwärmeleitung) als Heißwasserkessel für eine Vorlauftermperatur von bis zu 150°C inkl: Schubboden, Rauchgasreinigung mittels E-Filter und Entaschungssystem auf Basis Muldenbefüllung.

Boiler installations

Stadtwärme Lienz Produktions- und Vertriebs-GmbH | Published December 27, 2012  -  Deadline February 7, 2013
cpvs
42160000

:Im Biomasseheizkraftwerk Lienz soll die 2001 errichtete Biomasse-Thermoölkesselanlage mit 6 MW Kesselleistung durch eine neue Biomasse-Warmwasserkesselanlage mit 8 MW Kesselleistung ersetzt werden. Es umfasst dies die Biomassefeuerung und den Warmwasserkessel sowie deren Einbindung in die bestehende Anlage. Wesentliche Teile des bestehenden Systems sollen weiterhin genutzt werden. Die vorhandende Biomasse-Thermoölkesselanlage inkl. Feuerbox und die 1 MW el ORC-Anlage sind zu demontieren.

boiler installations

EVN Wärme GmbH | Published August 16, 2012  -  Deadline September 7, 2012
cpvs
42160000

:Errichtung von 1 Stück Biomasseheizkessel (4,8 MW) inkl. Schubboden, Tagesbunker, Rauchgasreinigung mittels E-Filter (im Freien) und Entaschungssystem geeignet für 10m³-Mulden auf Schienen-Verschubsystem. Gesamtfertigstellung: 30.11.2013.

boiler installations

EVN Wärme GmbH | Published February 15, 2012  -  Deadline March 1, 2012
cpvs
42160000

:Lieferung und Montage eines Biomasseheizkessels 3 MW inkl. Schubboden, Rauchgasreinigung mittels E-Filter und Entaschungssystem auf Basis 10 m³-Mulde auf Schienen-Verschubsystem für Standort Mariazell.

Supply and installation of a biomass boiler 1,7 MW for the location St.Veit / Gölsen.

EVN Wärme GmbH | Published March 15, 2016  -  Deadline March 29, 2016
cpvs
42160000

As regards the establishment reaches a biomass boiler with a guaranteed nominal heat output of

about 1 700 kW. The heat exchanger is to be performed standing. Alternatively, a well

lying heat exchangers are supplied with compressed air cleaning.

For heat generation is a fully automatic wood chip furnace under consideration

all environmentally friendly conditions and safety devices are running.

The Bunker discharge for the biomass boiler (1 700 kW) via a hydraulic slide

and a moving floor. The bed height of the wood chip is min. 5 meters.

The biomass boiler plant is installed in the existing heating system and to the existing

connected fireplace.

Boiler installations

EVN Wärme GmbH | Published March 23, 2017
Winner
Landesverwaltungsgericht Niederösterreich
cpvs
42160000

Delivery, installation and assembly of Hackgutkessels with a nominal heat output of 3,000 KW including hydraulically-betriebenem Schubboden, hydraulically-fed Stoker unit, multi-cyclone, electrostatic precipitator, fireplace, automatic ash removal through the ashes Gosse, ash high conveyor and ash containers.

Delivery, installation and assembly of Hackgutkessels with a rated thermal output 3000 KW including hydraulically-betriebenem Schubboden, hydraulically-fed Stoker unit, multi-cyclone, electrostatic precipitator, fireplace, automatic ash removal through the ashes Gosse, ash high conveyor and ash containers.

Boiler installations

EVN Wärme GmbH | Published August 20, 2016  -  Deadline September 20, 2016
cpvs

Delivery, installation and assembly of Hackgutkessels with a rated thermal output 3000 KW including hydraulically-betriebenem Schubboden, hydraulically-fed Stoker unit, multi-cyclone, electrostatic precipitator, fireplace, automatic ash removal through the ashes Gosse, ash high conveyor and ash containers.

Boiler installations

EVN Abfallverwertung Niederösterreich GmbH | Published July 7, 2015  -  Deadline July 20, 2015
cpvs
42160000, 42162000

Delivery superheater and heat recovery steam delivery option MVA Dürnrohr. Splitting of contracts.

Supply and installation of a biomass boiler 1 MW and 2.5 MW for the location Leopold village.

EVN Wärme GmbH | Published November 2, 2013  -  Deadline November 14, 2013
cpvs
42160000

Construction of a boiler house with woodchip boilers with a local heating power of 1000 kW and 2500 kW with hydraulic operated sliding floor, E-filter and automatic ash removal of the ash and gutter on this high ash conveyor to the ash container.

Boiler installations

EVN Wärme GmbH | Published October 8, 2015
cpvs
42160000

Lieferung und Montage eines Biomassekessels 10 MW in Guntramsdorf.

Boiler installations

EVN Wärme GmbH | Published May 8, 2014
cpvs
42160000

Lieferung und Montage eines Biomassekessels 1 MW und 2,5 MW für den Standort Leopoldsdorf.

Boiler installations

EVN Wärme GmbH | Published November 19, 2015
cpvs
42160000

Fertigung, Lieferung und Montage von 2 Stück Gaskessel in Heißwasser-/Dampfausführung samt Gebläsebrenner und Zubehör im Bezirk Mödling.