Public tenders for energy in Yambol Bulgaria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Electricity

„Водоснабдяване и канализация“ ЕООД | Published August 3, 2016  -  Deadline September 12, 2016
cpvs

Electrical energy

Construction-site supervision services

Община Ямбол | Published October 29, 2016
Winner
„Пловдивинвест“ АД
cpvs
71521000

Construction supervision in carrying out construction and repair work in the implementation of the National Programme for Energy Efficiency of Residential Buildings in the Municipality of Yambol. The contract consists of 4 lots.

Architectural and related services

Община Ямбол | Published May 13, 2016
Winner
ДЗЗД „Пролет Ямбол 2015“, Булстат/ЕИК 176922028
cpvs
71200000, 71251000, 71310000

Contract following a tender and concluded a framework agreement for manufacturing audits to establish the technical characteristics related to the requirements of Art. 169, para. 1 (w. 1-5), para. 2 and par. 3 SPA, energy efficiency audits and preparation of technical passports appreciated buildings in the municipality of Yambol, who responded to the eligibility criteria and selection and have received approval for financial assistance in relation to the National Programme for Energy Efficiency Multi residential buildings.

Architectural and related services

Община Ямбол | Published January 13, 2016
Winner
ДЗЗД „Обединение „Еко — Ямбол”, Булстат/ЕИК 176928554
cpvs
71200000, 71251000, 71310000

Contract following a tender and concluded a framework agreement for manufacturing audits to establish the technical characteristics related to the requirements of Art. 169, para. 1 (w. 1-5), para. 2 and par. 3 of the SPA, energy efficiency and preparation of technical passports appreciated buildings in the municipality of Yambol, who responded to the eligibility criteria and selection and have received approval for financial assistance in relation to the National Programme for Energy Efficiency Multi residential buildings. The contract was concluded positively evaluated building in the town. Yambol, with "Graf Ignatiev" № 82.

Architectural and related services

Община Ямбол | Published November 19, 2015
Winner
„Протико ил“ ООД
cpvs
71200000, 71251000, 71310000

The contract is carried out with a view to concluding a framework agreement with 10 contractors for the preparation of surveys to establish the technical characteristics related to the requirements of Art. 169, para. 1 (w. 1-5), para. 2 and par. 3 of the SPA, energy efficiency and preparation of technical passports appreciated buildings in the municipality of Yambol, who responded to the eligibility criteria and selection and have received approval for financial assistance in relation to the National Programme for Energy Efficiency Multi residential buildings.

Construction-site supervision services

Община Ямбол | Published March 18, 2017  -  Deadline April 18, 2017
cpvs
71521000, 71530000, 71520000, 71312000

The subject of this contract is: "Conformity assessment of investment projects with the essential requirements for construction and site supervision of construction for the renovation and modernization of the objects of the educational infrastructure of the municipality of Yambol - High school" Kliment Ohridski "- c. Yambol and Professional School of agriculture "Hristo Botev" Yambol ". The contractor of each lot, as a consultant within the meaning of the TDA should assess the compliance of the investment project with the essential requirements for construction and exercise construction supervision update and modernize the relevant construction - subject Lot included in the scope of contract: - High school "Kliment Ohridski" - c. Yambol, with administrative address gr. Yambol, str. "Stefan Karadja" № 72 - Lot № 1; - Professional School of Agriculture "Hristo Botev" Yambol with administrative address gr. Yambol,. "Milin Kamak" № 6 - Lot. № 2 position.

11 of the SPA, and preparing a comprehensive report on the assessment of conformity - investment project for the construction will be made in phase Detailed design and will include all mandatory energy saving measures prescribed in the report of a survey on energy efficiency of the building - ECM 1 Replacement of joinery; ESM 2 - Thermal insulation of the roof; - ESM 3 - Thermal insulation of exterior walls; ESM 4 - Thermal insulation of floors; ECM 5 - Reconstruction of SAI atmospheric type to a closed system expansion tank; ECM 6 - overhaul with replacement of pipes of hot water boiler 1 - 7 ECM - Replacement of lighting fixtures.

- Assistance to contracting authority in the procedure of coordination and approval of the investment project and issuance of a building permit for the site - subject of the lot;

- Supervision of works during construction to acceptance and commissioning of the works - subject of the Lot in the mandatory range regulated by the TDA and regulations for its implementation;

- Performing the functions of the coordinator on health and safety in accordance with Decree № 2 of 2004 on minimum health and safety in carrying out construction works, incl. fulfillment of all obligations of the contracting authority provided for in the said Ordinance;

176a of the SPA and Decree № 5 of the 2006 Technical passport;

- Manage the process of commissioning the construction site to the issuance of Certificates of commissioning of the works - the subject of the lot;

- Manage processes to eliminate the defects in the warranty terms of the construction;

- Implementation of administrative requirements under applicable regulations and rules of the Operational Programme "Regions for Growth" 2014 - 2020 g.

4 b. b) of the SPA is classified as stage IV-th category.

2. The Contractor shall perform:

11 of the SPA, and preparing a comprehensive report on the assessment of conformity - investment project for the construction will be made in phase Detailed design and will include all mandatory energy saving measures prescribed in the report of a survey on energy efficiency of the building, including . measures for utilization of renewable energy sources (with proven technical feasibility and economic viability) that lead to compliance of the building with the statutory requirements for energy efficiency - at least energy class "C" and have a direct environmental impact; The most effective package of energy saving measures for the building, which achieve regulatory requirements for energy efficiency - at least "C" class energy: ECM 1 Thermal insulation of external walls of the building; ESM 2 Thermal insulation of the roof; ESM 3 -Merki a heating system; ESM 4 Replacing unsubstituted hitherto lighting.

- Assistance to contracting authority in the procedure of coordination and approval of the investment project and issuance of a building permit for the site - subject of the lot;

- Supervision of works during construction to acceptance and commissioning of the construction - subject of the Lot in the mandatory range regulated by the TDA and regulations for its implementation;

- Performing the functions of the coordinator on health and safety in accordance with Decree № 2 of 2004 on minimum health and safety in carrying out construction works, incl. fulfillment of all obligations of the contracting authority provided for in the said Ordinance;

54a of CPRA

176a of the SPA and Decree № 5 of the 2006 Technical passport;

- Manage the process of commissioning the works to issue Certificates of commissioning etc.

"Execution of construction works of the building with administrative address Yambol, str." Preslav "№ 28" in the implementation of the National Programme for Energy Efficiency of Residential Buildings in the municipality of Yambol "

Община Ямбол | Published February 28, 2017  -  Deadline March 16, 2017
cpvs
45000000

3 of PPL, "which is completed by the Company and is located above link of the buyer profile to tender

"Execution of construction works of the building with administrative address Yambol, str." Preslav "№ 28" in the implementation of the National Programme for Energy Efficiency of Residential Buildings in the municipality of Yambol "

Община Ямбол | Published August 29, 2016  -  Deadline September 14, 2016
cpvs
45000000

"Execution of construction works of the building with administrative address Yambol, str." Preslav "№ 28" in the implementation of the National Programme for Energy Efficiency of Residential Buildings in the municipality of Yambol "

Община Ямбол | Published September 15, 2016  -  Deadline September 19, 2016
cpvs
45000000

By the end of the initial deadline for receipt of tenders (14.09.2016, 17:00.) In Yambol municipality received two oferti.Saglasno art. 188, para. 2 of the PPL Contracting Authority extended the deadline for receipt of tenders at least three days when the initial deadline received less than three oferti.Eto why and pursuant to Art. 188, para. 2 of the PPL Contracting Authority has decided to extend the deadline for receipt of tenders to 09/19/2016, the 17:00, inclusive. According to Art. 188, para. 3 ppl after the expiry of the extended term contracting authority will consider and evaluate offers received regardless of their broy.Myasto opening of tenders: Room 203 of the Municipality of Yambol c. Yambol, str. "G. GS Rakovski "№ 7. Date and time of opening of tenders: 09/20/2016, the 14:00.

Electricity

МБАЛ „Св. Пантелеймон“ АД — гр. Ямбол | Published November 2, 2016
Winner
„ЕВН Трейдинг Саут Ийст Юръп“ ЕАД ЕИК 175370769
cpvs
09310000

69a of the Energy Act and a balance group coordinator or equivalent; - The Contractor shall provide the Contracting Authority service predicting consumption and balancing responsibility. - The quality of electricity delivered must meet the quality indicators of electricity, according to the Bulgarian State Standard, which has been harmonized with EU standards. - Contracting Authority requires the participant proposed price is unified include all costs for the delivery of electricity, participation in balancing group and the cost of balancing. The Contracting Authority will pay separate amounts for the presence of imbalances and a fee for participation in the balancing group. In the case of imbalances, they are borne by the Contractor. - The technical proposal participant should submit a description of the monitoring system measuring point available to online Employer and the general principles for the distribution of the imbalances within the balancing group.

Electricity

МБАЛ „Св. Пантелеймон“ АД — гр. Ямбол | Published April 19, 2016  -  Deadline May 26, 2016
cpvs
09310000

69a of the Energy Act and a balance group coordinator or equivalent; - The Contractor shall provide the Contracting Authority service predicting consumption and balancing responsibility. - The quality of electricity delivered must meet the quality indicators of electricity, according to the Bulgarian State Standard, which has been harmonized with EU standards. - Contracting Authority requires the participant proposed price is unified include all costs for the delivery of electricity, participation in balancing group and the cost of balancing. The Contracting Authority will pay separate amounts for the presence of imbalances and a fee for participation in the balancing group. In the case of imbalances, they are borne by the Contractor. - The technical proposal participant should submit a description of the monitoring system measuring point available to the Principal on-line, and the general principles for the distribution of the imbalances within the balancing group.

Construction work

Община Ямбол | Published April 14, 2017  -  Deadline May 17, 2017
cpvs
45000000, 45321000, 45332000, 45421000

The overall objective of this contract is to select a contractor to carry out construction and installation activities for renovation of objects of educational infrastructure of the Municipality of Yambol. The subject of this contract is: Complete implementation of construction - works for renovation and modernization of the objects of the educational infrastructure of the Municipality of Yambol - Nursery "Winnie the Pooh", c. Yambol, Kindergarten "Freedom", Yambol and Nursery " sunny childhood ', Yambol. " The contract is divided into lots. The contractor of each lot must meet building - works for renovation and modernization of the corresponding construction - subject Lot included in the scope of the order.

1. General Information- building has a floor area of ​​437 m 2 and a total area 1 340.70 m 2 . It was built in 1973 - 1974, with the purpose "Social Activities". The building has three floors with one semi-underground and two above-ground floors.

Monolithic concrete skeleton - beam with structural diagram mixed: columns, girders 25 cm and brick walls with floor, ceiling and roof slabs of prefabricated floor elements having a cylindrical cavity (Pec) with different lengths depending on the architectural layout. The roof is sloped filled with monolithic reinforced concrete beams with a coating installation floor elements with a cylindrical cavity with a thermal insulation and covering tiles.

The building is foundations are through single monolithic reinforced concrete foundations and striped bases approximately 2 m below the level of the existing terrain. The actions planned are as follows:

- Implementation of energy efficiency measures - replacement of windows, insulation of exterior walls, insulate the roof and repairs to the structure it where necessary, new collector system for domestic hot water.

- Implementation of measures relating to repairs - will remove areas caving in spite ...

  • 1