Construction work

Кмет на Община Велико Търново | Published December 8, 2016
Winner
„Рувекс“ АД
cpvs
45000000

"Implementation of energy efficiency measures through restructuring of domestic heating systems and associated facilities in DG" Sonya. "

The heating system is a water pump 75/60 ​​° C. Provided heaters are steel radiators with a height of 400 and 500mm. Two pipe distribution network, radiation scheme. That will be mounted under the ceiling in the basement of the main building and the swimming pool will be filled with polypropylene pipes stabilized. By collectors in the boiler powered 3 branches serving respectively north and south of the building and auxiliary building (swimming pool, a new group and gymnasium). In the auxiliary building is shaped substation to distribution collectors providing heat supply to the swimming pool, gymnasium and newly built group. For heat supply of the site will remain mounted boiler 700KW power in the existing boiler room. The installations will be powered by two pieces of collector-water distributor and vodosabiratel. The connection of the collectors with the boiler and expansion tank will be filled with steel pipes. Continues ІІ.2.14).

Hotel meeting and conference services

Община Велико Търново | Published October 22, 2016
Winner
„Инфо Трейнинг“ ООД, ЕИК: 202318594
cpvs
55120000, 79800000, 22120000, 22140000, 79810000, 22150000, 22852000, 22462000, 22000000, 45316213

"Dissemination of information and publicity for the project" Improving energy efficiency in social infrastructure of Veliko Tarnovo ", which is implemented with financial support of the BG04" Energy efficiency and renewable energy "procedure BG04-02-03" Increasing energy efficiency and renewable energy use in municipal and state buildings and local heating systems. " Envisaged implementation of measures for publicity and awareness in order to increase transparency in the implementation of the project financed by the EEA Financial Mechanism 2009-2014, as well as raising awareness of the general public and the media. The envisaged measures for information and publicity must comply with the Manual of design and communication. The project is scheduled to be held two press conferences; Manufacture and installation of billboard - 3 pcs .; Manufacture and installation of permanent explanatory plaques - 3 pcs .; Press Release - 6; Producing and printing of leaflets in Bulgarian - 1 000; Producing and printing of leaflets in English - 500 pcs .; Producing and printing of brochures A4 in Bulgarian - 1000 pcs. Producing and printing of brochures A4 in English - 500 pcs .; Producing and printing of files - 200 pcs .; Development of banerfiks and banner - 1.

Construction work

Община Велико Търново | Published October 22, 2016
Winner
„Промишлена енергетика-ВТ“ АД, ЕИК: 104002900
cpvs
45000000, 45300000, 45331000

OP1: The project developed measures prescribed in detailed energy audit.

1. Heating installation. The heating system is water-pump 75/60 ​​° C. Provided heaters are steel radiators with a height of 500 mm. Two pipe distribution network, radiation scheme. That will be mounted under the ceiling in the basement and will be filled with polypropylene pipes stabilized. By collectors in the boiler powered 4 heating branch. By way valves branches managed by internal and external temperature, will ensure pofasadno regulate the installation depending on external conditions. The distribution network in the basement insulation is provided. Vertical pipes will be installed outdoors in all rooms. At each heater will be installed radiator valve inlet and shut off the exit. When passing through construction elements of the building, the pipes will be installed in casing and two layers of insulation to prevent deformation. The distribution network provided U-joints in places referred to in the drawings. On the risers are provided for ball valves with discharger. Radiators in the distribution network will be drained by secret taps to drain. The installation will be evacuated by manual and automatic air vents installed on each radiator and the high points of the distribution network.

2. Boiler. Boiler installation is an existing, completed in 2012. Installed 2 boilers with a capacity of 310 kW, and 160 kW. Replaced collectors existing branches are mounted pumps and three-way valves. Pump is installed to power the boilers. In the collectors are made conclusions about additional 2 branches being mounted cranes respective conclusions. Will be installed pumps, three-way valves, check valves and valves for the other two branches of the installation.

3. The control system of the boiler and room temperatures. To provide automatic control of the boiler will be installed ...

Technical building-inspection services

Община Велико Търново | Published June 16, 2016
Winner
„Консорцуим Консултанти 2020“ ДЗЗД
cpvs
71631300, 71324000, 71335000

The contract provides for a survey to establish the technical characteristics related to the requirements of Art. 169, para. 1 pt. 1 - p. 5 para. 2 and par. 3 SPA, energy efficiency audits and preparation of technical passport of objects - multifamily buildings, built industrially - in the city of Veliko Tarnovo, in conjunction with the "National Programme for Energy Efficiency of Residential Buildings." Procurement activities should be carried out in accordance with Bulgarian law and the guidelines and benchmarks set by the Works. Implementation of activities going after the award letter of assignment by the contracting authority.

Electricity

Многопрофилна областна болница за активно лечение „Д-р Стефан Черкезов“ АД | Published October 22, 2015
Winner
„Енерго — Про Енергийни Услуги“ ЕООД, ЕИК 131512672
cpvs
09310000

Object of the contract: "Selection of electricity supplier and balance group coordinator for powering objects owned MOBAL" Dr. Stefan Cherkezov "AD". The procedure can be performed to choose a supplier of active electric energy balance group coordinator to power seven the number of sites owned by MOBAL "Dr. Stefan Cherkezov" AD, according to the Energy Act (EA), rules for electricity trading (PTEE) and the Public Procurement Act (PPA). Contractor supplying net active electric power and balance group coordinator, is a licensed trader of electric power in accordance with Art. 39 in conjunction with Art. 69 and Art. 69a of the Energy Act and a balance group coordinator.

Electricity

Община Велико Търново | Published December 19, 2015
Winner
„Енерго — Про Енергийни услуги“ ЕООД
cpvs
09310000

The order aims choice of electricity supplier and balance group coordinator for the needs of Veliko Turnovo Municipality. The scope of the contract will be selected provider of electricity. Energy projects implemented in the technical specifications of the contract and will perform the same activity - a balance group coordinator.

Petroleum products, fuel, electricity and other sources of energy

Община Велико Търново | Published January 14, 2015
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>„Лукойл България“ ЕООД</OFFICIALNAME></ORGANISATION><ADDRESS>бул. „Тодор Александров“ № 42</ADDRESS><TOWN>София</TOWN><POSTAL_CODE>1000</POSTAL_CODE><COUNTRY VALUE="BG"/><PHONE>+359 29174159</PHONE><FAX>+359 29622228</FAX></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
09000000

Purchase fuel internal combustion engines and lubricants.

Works for complete or part construction and civil engineering work

Община Велико Търново | Published September 30, 2017
Winner
„СТИМА“ ООД
cpvs
45200000, 45321000, 45421000, 45000000, 45300000, 45331000

The subject of this public procurement is "Implementation of energy efficiency measures at" St. Patriarch Evtimii "Primary School, Veliko Tarnovo" in accordance with the prepared investment project for implementation of energy efficiency measures, attached to this documentation. On the basis of the energy efficiency audits of the buildings, their projects envisage the implementation of a system of energy efficiency measures (energy saving measures - ECM) as follows:

- Insulation of walls;

- Heat insulation on roof;

- Thermal insulation of floor to outside air;

- Replacement of joinery;

- Construction of a solar installation;

- Construction of a gas installation;

- Construction of a ventilation system.

Types of work are in accordance with the KSI and the Technical Specification, an integral part of this call.

The subject of this public procurement contract is "Implementation of energy efficiency measures in" St. Patriarch Evtimii "Primary School in Veliko Tarnovo in accordance with the prepared investment project for implementation of energy efficiency measures attached to this invitation. On the basis of the energy efficiency audits of the buildings, their projects envisage the implementation of a system of energy efficiency measures (energy saving measures - ECM) as follows:

- Insulation of walls;

- Heat insulation on roof;

- Thermal insulation of floor to outside air;

- Replacement of joinery;

- Construction of a solar installation;

- Construction of a gas installation;

- Construction of a ventilation installation.

Types of work are in accordance with the KSI and the Technical Specification, an integral part of this call.

Works for complete or part construction and civil engineering work

Община Велико Търново | Published October 5, 2017
cpvs
45200000, 45321000, 45421000, 45000000, 45300000, 45331000

The subject of this public procurement is "Implementation of energy efficiency measures at" St. Patriarch Evtimii "Primary School, Veliko Tarnovo" in accordance with the prepared investment project for implementation of energy efficiency measures, attached to this documentation. On the basis of the energy efficiency audits of the buildings, their projects envisage the implementation of a system of energy efficiency measures (energy saving measures - ECM) as follows:

- Insulation of walls;

- Heat insulation on roof;

- Thermal insulation of floor to outside air;

- Replacement of joinery;

- Construction of a solar installation;

- Construction of a gas installation;

- Construction of a ventilation system.

Types of work are in accordance with the KSI and the Technical Specification, an integral part of this call.

Architectural, construction, engineering and inspection services

Община Велико Търново | Published November 24, 2017
Winner
ЕТ „Никел-Елка Николова“
cpvs
71000000

For each of the lots: in execution of the assigned public procurement contract, the Contractor shall carry out complete, adequate and fully compliant with the requirements of the Assignor for the exercising of author's supervision during the execution of the construction and installation works on the investment project in all their individual parts, in the design phase, until the issuance of "Permission to use" respectively "Certificate of putting into operation". The subject of this contract for each item includes the following activities: Visiting the site (building) during exercise of the author's supervision; Assistance to the Assignor - Municipality of Veliko Tarnovo in the implementation of the project; Expert activities and consultations; Preparation and certification of executive documentation; Participation in admission committee (s).

Lot 2 - Estimated value - BGN 5,135.51 excluding VAT. Exercise of author's supervision of construction works on site: Site 3: "Saedinenie Square" - introduction of energy saving street lighting, flooring and parking, VK, placing of instructional and information boards, elements of urban furniture "; Estimated value: BGN 2 565.94 excluding VAT Object 4: "Reconstruction of public parking lots - parking on Coastal Street, incl. Reconstruction of pedestrian stairs "; Estimated value: 2 413 BGN excluding VAT Object 5: "Reconstruction of a public toilet on" Georgi Sava Rakovski "Str. Estimated value: 156.57 BGN excluding VAT.

Lot 3 - Exercise of Authorized Surveillance of Objects: Site 6: "Current repair of the viewing grounds on St. Stambolov "Project 7: Workshop on Urban Development in the Old Town (1st Stage) with the following subjects: Nezavisimost Street, Stefan Stambolov Str., Velcho Dzhamdjyata Street, Ivan Vazov Str. "Obzor" square, "Georgi Sava Rakovski" Str., "Samovodska Pazar" Square Object 8: Construction and civil engineering works in the old town part (II stage) with the following subjects: General Gurko str. "Kolyu Ficheto Str.," February 10 "Str., ...

Electricity

Многопрофилна областна болница за активно лечение „Д-р Стефан Черкезов“ АД | Published July 25, 2015  -  Deadline August 31, 2015
cpvs
09310000

Object of the contract: Selection of electricity supplier and balance group coordinator for powering objects owned MOBAL "Dr. Stefan Cherkezov" AD. The procedure is carried out to choose their supplier of electricity and active balance group coordinator to power seven the number of objects owned by MOBAL "Dr. Stefan Cherkezov" AD, according to the Energy Act (EA), rules for electricity trading (PTEE) and the Public Procurement Act (PPA). Contractor supplying net active electric power and balance group coordinator, is a licensed trader of electric power in accordance with Art. 39 in conjunction with Art. 69 and Art. 69a of the Energy Act and a balance group coordinator.

Electricity

Община Велико Търново | Published August 15, 2015  -  Deadline September 28, 2015
cpvs
09310000

The order aims choice of electricity supplier and balance group coordinator for the needs of Veliko Turnovo Municipality. The scope of the contract will be selected provider of electricity. Energy projects implemented in the technical specifications of the contract and will perform the same activity - a balance group coordinator.

Technical building-inspection services

Община Велико Търново | Published December 10, 2015  -  Deadline January 18, 2016
cpvs
71631300, 71324000, 71335000

The order provides for a survey to establish the technical characteristics related to the requirements of Art. 169, para. 1 pt. 1 mt. 5 para. 2 and par. 3 of the SPA, energy efficiency and preparation of technical passport of objects - multifamily buildings, built industrially - in the city of Veliko Tarnovo, in conjunction with the "National Program for Energy Efficiency of Residential Buildings". Procurement activities should be carried out in accordance with Bulgarian law and the guidelines and benchmarks set by the Works. Implementation of activities going after the award letter of assignment by the contracting authority.

Hotel meeting and conference services

Община Велико Търново | Published April 13, 2016  -  Deadline May 19, 2016
cpvs
55120000, 79800000, 22120000, 22140000, 79810000, 22150000, 22852000, 22462000, 22000000, 45316213

"Dissemination of information and publicity for the project" Improving energy efficiency in social infrastructure of Veliko Tarnovo ", which is implemented with financial support of the BG04" Energy efficiency and renewable energy "procedure BG04-02-03" Increasing energy efficiency and renewable energy use in municipal and state buildings and local heating systems. " Envisaged implementation of measures for publicity and awareness in order to increase transparency in the implementation of the project financed by the EEA Financial Mechanism 2009-2014, as well as raising awareness of the general public and the media. The envisaged measures for information and publicity must comply with the Manual of design and communication. The project is scheduled to be held two press conferences; Manufacture and installation of bilbord- 3 pcs .; Manufacture and installation of permanent explanatory tabeli- 3 pcs .; Pressaobshteniya- 6 pcs; Producing and printing of leaflets Bulgarian language- 1000 issue; Producing and printing of leaflets in English language- 500 pcs .; Producing and printing of brochures A4 Bulgarian language- 1000 pcs. Producing and printing of brochures A4 English language- 500 pcs., Produce and print papki- 200 pcs .; Development of banerfiks and transparant- 1 pc.

Electricity

Великотърновски университет „Св. Св. Кирил и Методий“ | Published July 26, 2016  -  Deadline September 1, 2016
cpvs

Electrical energy

Electricity

Община Велико Търново | Published August 5, 2016  -  Deadline September 7, 2016
cpvs

Electrical energy

Open procedure with subject: "Renovating for Energy Efficiency of Residential Buildings in the territory of Sofia Municipality area" Krasna Polyana "in lots

Столична община - Район "Красна поляна" | Published September 26, 2016  -  Deadline November 7, 2016
cpvs
undefined, 45210000

Open procedure with subject: "Renovating for Energy Efficiency of Residential Buildings in the territory of Sofia Municipality area" Krasna Polyana "in lots

Construction work

Община Велико Търново | Published December 7, 2016  -  Deadline January 9, 2017
cpvs
45000000, 71315000

Design and execution of works relating to the implementation of the National Programme for Energy Efficiency of Residential Buildings in the Municipality of Veliko Tarnovo on 2 lots. Through the contract will be carried out renovation of multifamily residential buildings through the implementation of energy efficiency measures to provide better living conditions for citizens in multifamily buildings, thermal comfort and higher quality of living environment. Implementation of energy efficiency measures in multifamily buildings will contribute to a higher level of energy efficiency in multifamily buildings and reducing energy costs, improving performance to extend the life cycle of buildings and providing conditions of living environment compliance with sustainability criteria. Detailed information on the nature and volume of construction and services is presented in section II.2.4.) Of the notice.

Preparation of business investment with scope and content according to the statutory requirements of Decree № 4/2001 on the scope and content of investment projects, as well as specific requirements of the project. Project contain parts: architectural, structural, electrical, energy efficiency, fire safety, PBZ, PUSO, budget documentation. The execution of works for upgrading energy efficiency is carried out in accordance with Part Three "construction" of the SPA and began following the issuance of a building permit by the competent authorities of any particular object. Object position is - Residential building was built in system construction EPZHS - nomenclature Bs-M ^ Y-72 Ch-P consisting of five residential units, 3 of which with 1 input and 2 with 2 inputs. Total area: 1 464.33 m².

- Total gross floor area: 12 115.97 m² basement.

- Built volume: 35 m³ 070.40.

- Heated volume: 24,528 m³.

- Floors: From 6 to 8 above ground and one semi-underground (basement).

Eligible ...

Electricity

Великотърновски Университет „Св. Св. Кирил и Методий“ | Published December 6, 2016  -  Deadline January 10, 2017
cpvs
09310000

The subject of the contract is the choice of provider net active electric power and performing the duties of a balance group coordinator for the needs of the 25 sites of the University "St. St. Cyril and Methodius ", which are described in the technical specification documentation of the contract. The estimated amount of electricity to be delivered in 12 months, is defined in terms of power consumption in the last 12 months totaled 1,618,268 kWh kWh. The estimated amount of electricity does not commit the Contracting Authority to acquire.

Upon delivery must be delivered electricity with quality and procedures as provided for in the Energy Act (EA) and other legislation governing the public relations related to the supply of electricity (including regulations under the Energy Act, the Rules trading electricity (PTEE) and rules for measuring the quantity of electricity (Piquet). as "a balance group coordinator" contractor should take responsibility for balancing include contracting in the balancing energy market as a participant (indirect member ) standard balancing group without sponsor to pay a fee to participate, and provide forecasting consumption contracting authority, including the administration of hourly schedules for consumption sponsor.

Construction work

Община Велико Търново | Published January 6, 2017  -  Deadline January 19, 2017
cpvs
45000000, 71315000

Design and execution of works relating to the implementation of the National Programme for Energy Efficiency of Residential Buildings in the Municipality of Veliko Tarnovo on 2 lots. Through the contract will be carried out renovation of multifamily residential buildings through the implementation of energy efficiency measures to provide better living conditions for citizens in multifamily buildings, thermal comfort and higher quality of living environment. Implementation of energy efficiency measures in multifamily buildings will contribute to a higher level of energy efficiency in multifamily buildings and reducing energy costs, improving performance to extend the life cycle of buildings and providing conditions of living environment compliance with sustainability criteria. Detailed information on the nature and volume of construction and services is presented in section II.2.4.) Of the notice.